Menu
Home Explore People Places Arts History Plants & Animals Science Life & Culture Technology
On this page
Boeing 787 Dreamliner
Boeing wide-body jet airliner

The Boeing 787 Dreamliner is a wide-body airliner designed for improved fuel efficiency, typically carrying 200–300 passengers on long point-to-point routes up to 8,500 nautical miles. Powered by General Electric GEnx or Rolls-Royce Trent 1000 engines, its lightweight composite airframe and advanced electrical systems boost performance. The Dreamliner launched in 2004 with an initial order from All Nippon Airways, entering service in 2011. Subsequent variants include the stretched 787-9 and 787-10, serving airlines like Singapore Airlines. Despite early challenges with lithium-ion batteries and production delays, over 1,189 aircraft have been delivered from 2,137 orders as of 2025.

Development

Background

During the late 1990s, Boeing considered replacement aircraft programs due to slowing sales of the 767 and 747-400. Two new aircraft were proposed. The 747X would have lengthened the 747-400 and improved efficiency, and the Sonic Cruiser would have achieved 15% higher speeds (approximately Mach 0.98) while burning fuel at the same rate as the 767.1 Market interest for the 747X was tepid; several major American airlines, including Continental Airlines, showed initial enthusiasm for the Sonic Cruiser, although concerns about the operating cost were also expressed.2 The global airline-market was disrupted by the 9/11 attacks and increased petroleum prices, making airlines more interested in efficiency than speed. The worst-affected airlines, those in the United States, had been considered the most likely customers of the Sonic Cruiser; thus the Sonic Cruiser was officially canceled on December 20, 2002. On January 29, 2003, Boeing announced an alternative product, the 7E7, using Sonic Cruiser technology in a more conventional configuration.34 The emphasis on a smaller midsize twinjet rather than a large 747-size aircraft represented a shift from the hub-and-spoke theory toward the point-to-point theory,5 in response to analysis of focus groups.6

Randy Baseler, Boeing Commercial Airplanes VP Marketing stated that airport congestion comes from large numbers of regional jets and small single-aisles, flying to destinations where a 550-seat Airbus A380 would be too large; to reduce the number of departures, smaller airplanes can increase by 20% in size and airline hubs can be avoided with point-to-point transit.7

In 2003, a recent addition to the Boeing board of directors, James McNerney (who would become Boeing's Chairman and CEO in 2005), supported the need for a new aircraft to regain market share from Airbus. The directors on Boeing's board, Harry Stonecipher (Boeing's President and CEO) and John McDonnell issued an ultimatum to "develop the plane for less than 40 percent of what the 777 had cost to develop 13 years earlier, and build each plane out of the gate for less than 60 percent of the 777's unit costs in 2003", and approved a development budget estimated at US$7 billion as Boeing management claimed that they would "require subcontractors to foot the majority of costs." Boeing Commercial Airplanes president Alan Mulally, who had previously served as general manager of the 777 programs contrasted the difference in the approval process by the board between the 777 and 787 saying "In the old days, you would go to the board and ask for X amount of money, and they'd counter with Y amount of money, and then you'd settle on a number, and that's what you'd use to develop the plane. These days, you go to the board, and they say, 'Here's the budget for this airplane, and we'll be taking this piece of it off the top, and you get what's left; don't fuck up.'"8

The replacement for the Sonic Cruiser project was named "7E7"9 (with a development code name of "Y2"). Technology from the Sonic Cruiser and 7E7 was to be used as part of Boeing's project to replace its entire airliner product line, an endeavor called the Yellowstone Project (of which the 7E7 became the first stage).10 Early concept images of the 7E7 included rakish cockpit windows, a dropped nose, and a distinctive "shark-fin" tail.11 The "E" was said to stand for various things, such as "efficiency" or "environmentally friendly". In the end, Boeing said it stood for "Eight".12 In July 2003, a public naming competition was held for the 7E7, for which out of 500,000 votes cast online the winning title was Dreamliner.13 Other names included eLiner, Global Cruiser, and Stratoclimber.1415

On April 26, 2004, Japanese airline All Nippon Airways (ANA) became the launch customer for the 787, announcing a firm order for 50 aircraft with deliveries to begin in late 2008.16 The ANA order was initially specified as 30 787-3, 290–330 seat, one-class domestic aircraft, and 20 787-8, long-haul, 210–250 seat, two-class aircraft for regional international routes such as Tokyo-Narita to Beijing-Capital, and could perform routes to cities not previously served, such as Denver, Moscow, and New Delhi.17 The 787-3 and 787-8 were to be the initial variants, with the 787-9 entering service in 2010.18

On October 5, 2012, Indian state carrier Air India became the first carrier to take possession of a Dreamliner that was manufactured in the Charleston, South Carolina, Boeing plant. This was the first 787 that was manufactured outside of Washington.19 Boeing would go on to use both the Everett and South Carolina plants to deliver the Dreamliner.

The 787 was designed to be the first production airliner with the fuselage comprising one-piece composite barrel sections instead of the multiple aluminum sheets and some 50,000 fasteners used on existing aircraft.2021 Boeing selected two new engines to power the 787, the Rolls-Royce Trent 1000 and General Electric GEnx.22 Boeing stated the 787 would be approximately 20 percent more fuel-efficient than the 767,23 with approximately 40 percent of the efficiency gain from the engines,24 plus gains from aerodynamic improvements,25 increased use of lighter-weight composite materials, and advanced systems.26 The airframe underwent extensive structural testing during its design.2728 The 787-8 and −9 were intended to have a certified 330 minute ETOPS capability.29

During the design phase, the 787 underwent extensive wind tunnel testing at Boeing's Transonic Wind Tunnel, QinetiQ's five-meter wind tunnel at Farnborough, United Kingdom, and NASA Ames Research Center's wind tunnel, as well as at the French aerodynamics research agency, ONERA. The final styling was more conservative than earlier proposals, with the fin, nose, and cockpit windows changed to a more conventional form. By 2005, customer-announced orders and commitments for the 787 reached 237 aircraft.30 Boeing initially priced the 787-8 variant at US$120 million, a low figure that surprised the industry. By 2007, the list price had increased to US$157–167 million, eventually exceeding US$200 million by the time the aircraft received type certification.3132 Airlines and lessors do not pay the full list price, with market prices for the 787-8 being up to 46% lower.33

Manufacturing and suppliers

On December 16, 2003, Boeing announced that the 787 would be assembled in its factory in Everett, Washington.34 Instead of conventionally building the aircraft from the ground up, the final assembly employed 800 to 1,200 people to join completed subassemblies and integrate systems.35 Boeing assigned global subcontractors to do more assembly work, delivering completed subassemblies to Boeing for final assembly. This approach was intended to result in a leaner, simpler assembly line and lower inventory,36 with pre-installed systems reducing final assembly time by three-quarters to three days.3738 Subcontractors had early difficulties procuring needed parts and finishing subassemblies on schedule, leaving remaining assembly work for Boeing to complete as "traveled work."3940 In 2010, Boeing considered in-house construction of the 787-9 tail; the tail of the 787-8 is made by Alenia.41 The 787 was unprofitable for some subcontractors; Alenia's parent company, Finmeccanica, had a total loss of €750 million on the project.42

Subcontracted assemblies included wing and center wing box (Mitsubishi Heavy Industries, Japan; Subaru Corporation, Japan);43 horizontal stabilizers (Alenia Aeronautica, Italy; Korea Aerospace Industries, South Korea);44 fuselage sections (Global Aeronautica, Italy; Boeing, North Charleston, US; Kawasaki Heavy Industries, Japan; Spirit AeroSystems, Wichita, US; Korean Air, South Korea);454647 passenger doors (Latécoère, France); cargo doors, access doors, and crew escape door (Saab AB, Sweden); software development (HCL Enterprise, India);48 floor beams (TAL Manufacturing Solutions Limited, India);4950 wiring (Labinal, France);51 wing-tips, flap support fairings, wheel well bulkhead, and longerons (Korean Air, South Korea);52 landing gear (Messier-Bugatti-Dowty, UK/France);5354 and power distribution and management systems, air conditioning packs (Hamilton Sundstrand, Connecticut, US).5556

To speed up deliveries, Boeing modified four used 747-400s into 747 Dreamlifters to transport 787 wings, fuselage sections, and other smaller parts. Japanese industrial participation was key to the project. Japanese companies co-designed and built 35% of the aircraft; the first time that outside firms played a key design role on Boeing airliner wings. The Japanese government supported development with an estimated US$2 billion in loans.57 On April 26, 2006, Japanese manufacturer Toray Industries and Boeing signed a production agreement involving US$6 billion worth of carbon fiber, extending a 2004 contract.58 In May 2007, the final assembly on the first 787 began at Everett.59

Boeing worked to trim excess weight since assembly of the first airframe began; in late 2006, the first six 787s were stated to be overweight, with the first aircraft being 5,000 lb (2,300 kg) heavier than specified.60 The seventh and subsequent aircraft would be the first optimized 787-8s expected to meet all goals.6162 Accordingly, some parts were redesigned to include more use of titanium.6364 In July 2015, Reuters reported that Boeing was considering reducing the use of titanium to reduce construction costs.65

Early built 787s (line numbers under 20) were overweight, increasing their fuel burn and reducing their maximum range, and some carriers decided to take later aircraft. Boeing struggled to sell these aircraft, eventually offering significant discounts and scrapping one.6667 Because of their line numbers, these aircraft were nicknamed the "Terrible Teens."68

Boeing planned the first flight by the end of August 2007 and premiered the first 787 (registered N787BA) at a rollout ceremony on July 8, 2007.69 The 787 had 677 orders at this time, which is more orders from launch to roll-out than any previous wide-body airliner.70 The major systems were not installed at the time; many parts were attached with temporary non-aerospace fasteners requiring replacement with flight fasteners later.71

In September 2007, Boeing announced a three-month delay, blaming a shortage of fasteners as well as incomplete software.72 On October 10, 2007, a second three-month delay to the first flight and a six-month delay to first deliveries were announced due to supply chain problems, a lack of documentation from overseas suppliers, and flight guidance software delays.7374 Less than a week later, Mike Bair, the 787 program manager was replaced.75 On January 16, 2008, Boeing announced a third three-month delay to the first flight of the 787, citing insufficient progress on "traveled work."76 On March 28, 2008, to gain more control over the supply chain, Boeing announced plans to buy Vought Aircraft Industries' interest in Global Aeronautica; a later agreement was also made to buy Vought's factory in North Charleston.77

On April 9, 2008, a fourth delay was announced, shifting the maiden flight to the fourth quarter of 2008, and delaying initial deliveries by around 15 months to the third quarter of 2009. The 787-9 variant was postponed to 2012 and the 787-3 variant was to follow at a later date.78 On November 4, 2008, a fifth delay was announced due to incorrect fastener installation and the Boeing machinists strike, stating that the first test flight would not occur in the fourth quarter of 2008.7980 After assessing the program schedule with suppliers,81 in December 2008, Boeing stated that the first flight was delayed until the second quarter of 2009.82 Airlines, such as United Airlines and Air India, stated their intentions to seek compensation from Boeing for the delays.8384

A secondary factor in the delays faced by the 787 program was the lack of detailed specifications provided to partners and suppliers. In previous programs Boeing had supplied high level design data, but for the 787, decided to provide broad level specifications only, on the assumption that relevant partners had the competencies to perform the design and integration work with the limited data. This decision created several delays as suppliers struggled to work with the limited design data.85

Pre-flight ground testing

As Boeing worked with its suppliers toward production, the design proceeded through a series of test goals. On August 23, 2007, a crash test involving a vertical drop of a partial composite fuselage section from about 15 ft (4.6 m) onto a 1 in (25 mm)-thick steel plate occurred in Mesa, Arizona;8687 the results matched predictions, allowing modeling of various crash scenarios using computational analysis instead of further physical tests.8889 While critics had expressed concerns that a composite fuselage could shatter and burn with toxic fumes during crash landings, test data indicated no greater toxicity than conventional metal airframes.9091 The crash test was the third in a series of demonstrations conducted to match FAA requirements, including additional certification criteria due to the wide-scale use of composite materials.92 The 787 meets the FAA's requirement that passengers have at least as good a chance of surviving a crash landing as they would with current metal airliners.93

On August 7, 2007, on-time certification of the Rolls-Royce Trent 1000 engine by European and US regulators was received.94 The alternative GE GEnx-1B engine achieved certification on March 31, 2008.95 On June 20, 2008, the first aircraft was powered up, for testing the electrical supply and distribution systems.96 A non-flightworthy static test airframe was built; on September 27, 2008, the fuselage was successfully tested at 14.9 psi (103 kPa) differential, which is 150 percent of the maximum pressure expected in commercial service.97 In December 2008, the 787's maintenance program was passed by the FAA.98

On May 3, 2009, the first test 787 was moved to the flight line following extensive factory testing, including landing gear swings, systems integration verification, and a total run-through of the first flight.99 On May 4, 2009, a press report indicated a 10–15% range reduction, about 6,900 nmi (12,800 km; 7,900 mi) instead of the originally promised 7,700 to 8,200 nautical miles (14,300 to 15,200 km; 8,900 to 9,400 mi), for early aircraft that were about 8% overweight. Substantial redesign work was expected to correct this, which would complicate increases in production rates;100 Boeing stated the early 787-8s would have a range of almost 8,000 nmi (15,000 km; 9,200 mi).101 As a result, some airlines reportedly delayed deliveries of 787s to take later planes that may be closer to the original estimates.102 Boeing expected to have the weight issues addressed by the 21st production model.103

On June 15, 2009, during the Paris Air Show, Boeing said that the 787 would make its first flight within two weeks. On June 23, the first flight was postponed due to structural reasons.104105 Boeing provided an updated 787 schedule on August 27, 2009, with the first flight planned to occur by the end of 2009 and deliveries to begin at the end of 2010.106 The company expected to write off US$2.5 billion because it considered the first three Dreamliners built unsellable and suitable only for flight tests.107 On October 28, 2009, Boeing selected Charleston, SC as the site for a second 787 production line, after soliciting bids from multiple states.108 On December 12, 2009, the first 787 completed high-speed taxi tests, the last major step before flight.109110

Flight testing

On December 15, 2009, Boeing conducted the 787-8 maiden flight from Paine Field in Everett, Washington, at 10:27 am PST and landed three hours later at 1:33 p.m. at Seattle's Boeing Field. During the flight the 787 reached a top speed of 180 kn (333 km/h) and maximum altitude of 13,200 ft (4,000 m).111 Originally scheduled for ⁠5+1/2⁠ hours, the test flight was shortened to three hours due to unfavorable weather conditions.112 The six-aircraft ground and flight test program was scheduled to be done in eight and a half months and 6800 hours, which was the fastest certification campaign for a new Boeing commercial design.113

The flight test program comprised six aircraft, ZA001 through ZA006, four with Rolls-Royce Trent 1000 engines and two with GE GEnx-1B64 engines. The second 787, ZA002 in All Nippon Airways livery, flew to Boeing Field on December 22, 2009, to join the flight test program;114115 the third 787, ZA004 made its first flight on February 24, 2010, followed by ZA003 on March 14, 2010.116 On March 24, 2010, flutter and ground effects testing was completed, clearing the aircraft to fly its entire flight envelope.117 On March 28, 2010, the 787 completed the ultimate wing load test, which requires that the wings of a fully assembled aircraft be loaded to 150% of the design limit load and held for 3 seconds. The wings were flexed approximately 25 ft (7.6 m) upward during the test.118 Unlike past aircraft, the wings were not tested to failure.119120 On April 7, data showed the test had been a success.121

On April 23, 2010, the newest 787, ZA003, arrived at the McKinley Climatic Laboratory hangar at Eglin Air Force Base, Florida, for extreme weather testing in temperatures ranging from 115 to −45 °F (46 to −43 °C), including takeoff preparations at both temperature extremes.122 ZA005, the fifth 787 and the first with GEnx engines, began ground engine tests in May 2010,123 and made its first flight on June 16, 2010.124 In June 2010, gaps were discovered in the horizontal stabilizers of test aircraft due to improperly installed shims; all aircraft were inspected and repaired.125 That same month, a 787 experienced its first in-flight lightning strike; inspections found no damage.126 As composites can have as little as 1/1,000th the electrical conductivity of aluminum, conductive material is added to alleviate potential risks and to meet FAA requirements.127128129 The FAA also planned requirement changes to help the 787 show compliance.130 In December 2019, it was reported that Boeing had removed the copper foil that formed part of the protection against lightning strikes to the wings of the aircraft; it then worked with the FAA to override concerns raised.131132

The 787 made its first appearance at an international air show at the Farnborough Airshow, United Kingdom, on July 18, 2010.133

On August 2, 2010, a Trent 1000 engine suffered a blowout at Rolls-Royce's test facility during ground testing.134 This engine failure caused a reevaluation of the timeline for installing Trent 1000 engines; on August 27, 2010, Boeing stated that the first delivery to launch customer ANA would be delayed until early 2011.135136 That same month, Boeing faced compensation claims from airlines owing to ongoing delivery delays.137 In September 2010, it was reported that two additional 787s might join the test fleet for a total of eight flight test aircraft.138 On September 10, 2010, a partial engine surge occurred in a Trent engine on ZA001 at Roswell.139 On October 4, 2010, the sixth 787, ZA006 joined the test program with its first flight.140

On November 9, 2010, the second 787, ZA002 made an emergency landing at Laredo International Airport, Texas, after smoke and flames were detected in the main cabin during a test flight.141142 The electrical fire caused some systems to fail before landing.143 Following this incident, Boeing suspended flight testing on November 10, 2010; ground testing continued.144145 After investigation, the in-flight fire was primarily attributed to foreign object debris (FOD) that was present in the electrical bay.146 After electrical system and software changes, the 787 resumed flight testing on December 23, 2010.147148

Test evaluation and certification

On November 5, 2010, it was reported that some 787 deliveries would be delayed to address problems found during flight testing.149150 In January 2011, the first 787 delivery was rescheduled to the third quarter of 2011 due to software and electrical updates following the in-flight fire.151152 By February 24, 2011, the 787 had completed 80% of the test conditions for the Rolls-Royce Trent 1000 engine and 60% of the conditions for the General Electric GEnx-1B engine.153 In July 2011, ANA performed a week of operations testing using a 787 in Japan.154 The test aircraft had flown 4,828 hours in 1,707 flights combined by August 15, 2011.155 During testing, the 787 visited 14 countries in Asia, Europe, North America, and South America to test in extreme climates and conditions and for route testing.156

On August 13, 2011, certification testing of the Rolls-Royce powered 787-8 finished.157 The FAA and European Aviation Safety Agency certified the 787 on August 26, 2011, at a ceremony in Everett, Washington.158159

Entry into service

Certification cleared the way for deliveries and in 2011, Boeing prepared to increase 787 production rates from two to ten aircraft per month at assembly lines in Everett and Charleston over two years.160 Legal difficulties clouded production at Charleston; on April 20, 2011, the National Labor Relations Board alleged that a second production line in South Carolina violated two sections of the National Labor Relations Act.161 In December 2011, the National Labor Relations Board dropped its lawsuit after the Machinists' union withdrew its complaint as part of a new contract with Boeing.162 The first 787 assembled in South Carolina was rolled out on April 27, 2012.163

The first 787 was officially delivered to All Nippon Airways (ANA) on September 25, 2011, at the Boeing Everett factory. A ceremony to mark the occasion was also held the next day.164165 On September 27, it flew to Tokyo Haneda Airport.166167 The airline took delivery of the second 787 on October 13, 2011.168

On October 26, 2011, an ANA 787 flew the first commercial flight from Tokyo's Narita International Airport to Hong Kong International Airport.169 The Dreamliner entered service some three years later than originally planned. Tickets for the flight were sold in an online auction; the highest bidder had paid $34,000 for a seat.170 An ANA 787 flew its first long-haul flight to Europe on January 21, 2012, from Haneda to Frankfurt Airport.171

Proposed variants

Freighter version

Even after production of the 787 began, Boeing continued to produce the 767 as a freighter. More stringent emissions and noise limits will go into effect in 2028 and prevent 767 sales in its current form.172 To address this concern, Boeing has widely reported to be working on a freighter version of the 787, showing proposals to customers including FedEx Express.173174 As of May 2024, production of the 787 Freighter is expected to begin between 2028 and 2033.175

787-3

The 787-3 would have carried 290–330 passengers in two-class over 2,500–3,050 nmi (4,630–5,650 km; 2,880–3,510 mi) range, limited by a 364,000 lb (165 t) MTOW.176 In April 2008, to keep the −8 on track for delivery, the −9 stretch was postponed from 2010 to at least 2012 and prioritized before the 787-3 and its 43 orders to follow without a firm delivery date.177

It kept the −8 length but its 51.7 m wingspan would have fit in ICAO Aerodrome Reference Code D.178 It was designed to operate on Boeing 757-300/Boeing 767-200 sized regional routes from airports with restricted gate spacing.179 The wingspan was decreased by using blended winglets instead of raked wingtips.

By January 2010, all orders, from Japan Airlines and All Nippon Airways, had been converted to the 787-8.180 As it was designed specifically for the Japanese market, Boeing would likely scrap it after they switched orders.181 The −8's longer wingspan makes it more efficient on stages longer than 200 nmi (370 km; 230 mi).182 In December 2010, Boeing withdrew the short-haul model as it struggled to produce the 787-8 after program delays of three years.183

Market and costs

The 787 Dreamliner program has reportedly cost Boeing $32 billion.184185 In 2013, the 787 program was expected to be profitable after 1,100 aircraft have been sold.186 At the end of 2013, the cost of producing a 787 exceeded the purchase price. Boeing's accounting method books sales immediately and distributes estimated production costs over ten years for the 1,300 aircraft it expects to deliver during that time. JPMorgan Chase analyst Joseph Nadol estimated the program's cash loss to be $45 million per airplane, decreasing as the program moves forward. The actual cash flow reflects Boeing collecting most of the purchase price upon delivery; Boeing expects deferred costs to total $25 billion before the company begins to break even on production; the comparable number for the Boeing 777, adjusted for inflation, is $3.7 billion.187

Boeing lost $30 million per 787 delivered in the first quarter of 2015, although Boeing planned to break even by the end of the year.188 The accumulated losses for the 787 totaled almost $27 billion (~$33.9 billion in 2023) by May 2015. The cost of producing the fuselage may increase because of a tentative deal reached with Spirit Aerosystems of Wichita, Kansas, wherein severe price cuts demanded by Boeing would be eased, in return for a comprehensive agreement that lowers the cost of fuselages for other jetliners that Spirit helps Boeing manufacture.189

In the second quarter of 2015, Boeing lost $25 million (~$31.4 million in 2023) on each 787 delivered but was planning to break even per plane before the year-end. After that Boeing hoped to build 900 Dreamliners over six years at an average profit of more than $35 million each. But with deferred costs peaking in 2016 at $33 billion, (~$41.1 billion in 2023) Leeham analyst Bjorn Fehrm believes Boeing cannot make an overall profit on the program. Ted Piepenbrock, an academic affiliated with MIT and the University of Oxford, projects losses decreasing through the first 700 airliners and forecasts the cumulative deferred costs to peak beyond $34 billion. The model most favorable to Boeing projects a program loss of $5 billion after delivering 2,000 Dreamliners. Boeing's original development investment, estimated at least at a further $20 billion, is not included in these costs.190

To recoup the deferred costs and earn its goal of a "low single-digit" overall profit margin, Boeing has to make an average profit of more than $50 million on the final 205 airplanes of the accounting block to be delivered from 2020: a profit margin of more than 30% while the mature Boeing 737 and 777 programs have 20% to 25% margins. Boeing is reaching it through a larger proportion of the 20% to 40% higher price −9/10s, costing only 5% to 10% more than the −8 with lower production costs from reliability and producibility investments and the expected experience curve. Former Douglas Aircraft chief economist Adam Pilarski notes that two assembly sites slow the experience curve. Boeing assumed a faster improvement than on previous programs which had not happened. Competition with the Airbus A350 and the launch of the A330neo put strong pressure on the 787 pricing.191

On July 21, 2016, Boeing reported charges of $847 million against two flight-test 787s built in 2009. Boeing had planned to refurbish and sell them but instead wrote them off as research and development expense.192 In 2017, Boeing's Jim Albaugh said that the requested return on net assets (RONA) led to outsourcing systems reducing investment, but improving RONA had to be balanced against the risk of loss of control.193 From 2019, Boeing was to build 14 787s per month (168 per year), helping to offset the $28 billion in deferred production costs accumulated through 2015 and would add 100 aircraft to the current accounting block of 1,300 at the end of 2017 third quarter.194 In 2019, the list price for a 787-8 was US$248.3M, $292.5M for a 787-9, and $338.4M for a 787-10.195

The valuation for a new 787-9 is $145 million in 2018, up from $135 million in 2014, but it may have been sold for $110–115 million to prevent A330neo sales while an A330-900 is worth $115 million.196 In February 2018, Boeing priced six 787-9s for less than $100–115m each to Hawaiian Airlines, close to their production cost of $80–90m, to overcome its A330-800 order.197 By late 2018, deferred production costs were reduced from a peak of $27.6 billion in early 2016 to $23.5 billion as assembly efficiency improved and the 800th production started.198

Production rate

By 2014, Boeing planned to improve financial return by reorganizing the production line, renegotiating contracts with suppliers and labor unions, and increasing the 787 production rate, stepwise, to 12 airplanes per month by the end of 2016 and 14 airplanes per month by the end of the decade.199 By April 2015, the production rate was 10 per month.200

From late 2020, the production rate is to be reduced from 14 to 12 airplanes per month due to the China-United States trade war.201 Production could be trimmed to 10 planes per month as demand for wide-body aircraft falters.202 On October 1, 2020, Boeing announced the 787 would be produced only in North Charleston from mid-2021 due to the impact of the COVID-19 pandemic on aviation, as the production rate fell to six per month.203 In December, the monthly rate was further reduced to five.204

Quality-control issues (2019–2025)

2019

In 2019, reports began to emerge about quality-control issues at the North Charleston plant leading to questions about the jet's safety;205206 and later that same year KLM, which had discovered loose seats, missing and incorrectly installed pins, nuts and bolts not fully tightened and a fuel-line clamp left unsecured on its jet, complained that the standard of manufacture was "way below acceptable standards."207

2020

Early in 2020, Boeing engineers complained about depressions in the 787's vertical tail fin, affecting hundreds of planes or the vast majority of the fleet. Workers in Charleston and Everett had improperly discarded shims before the final installation of fasteners, which could lead to structural failure under limited loads. In late August 2020, Boeing grounded eight 787s due to such improper fuselage shimming and inner skin surfacing issues—issues which proved to have been discovered in August 2019 at Boeing South Carolina.208209

The following month, Boeing admitted that "nonconforming" sections of the rear fuselage did not meet engineering standards, and the FAA was investigating quality-control lapses dating back to the introduction of the 787 in 2011 and considering requiring additional inspections for up to 900 of the roughly 1,000 Dreamliners in service.210 The FAA then began to inquire into the company's Quality Management System (QMS), which Boeing had previously argued justified a reduction of 900 quality inspectors, but which had failed to detect either the shim or skin surface issues.211 A third quality-control issue then emerged, this time with the 787's horizontal stabilizers, and affecting as many as 893 Dreamliners: workers in Salt Lake City had clamped portions of the tail section too tightly, which could lead to premature material fatigue. At this point Boeing expected a one-time inspection during regularly scheduled maintenance to address the issues212213 and expected merely to slow 787 deliveries "in the near term".214

2021

By January 2021, Boeing had halted 787 deliveries to complete the inspection relating to poor quality control,215 then in March the FAA withdrew Boeing's delegated authority to inspect and sign off on four new 787s, saying that it would extend this withdrawal to further aircraft if needed.216 Boeing briefly resumed deliveries on March 26, 2021, handing over one 787-9 to United Airlines,217 but deliveries ceased again in May 2021;218 meaning that almost all deliveries had been paused for nearly a year.219 The delay generated $1 billion in abnormal costs and caused the company to cut production to around two planes a month.220

On July 13, Boeing discovered gaps at joints in the forward pressure bulkhead and again reduced production; the company also investigated whether the issue affected 787s already in service.221 Questions were asked about the inspection process used to check the work, and Boeing worked with the FAA to fix the problem, which was said to pose "no immediate threat to flight safety" and did not require 787s already in service to be grounded.222

On September 4, the Wall Street Journal reported that the FAA would not accept Boeing's proposed new inspection method, aiming to speed deliveries with targeted checks rather than nose-to-tail teardowns, until at least late October;223 and in late November it was reported that the FAA had discovered further problems, including additional out of tolerance gaps and contamination and associated weakening of fuselage composites. The rectification process for existing aircraft was made more complex by a lack of detailed configuration data on each aircraft.224 The new problems and the extension of the 13 month long disruption to 787 deliveries led to anger from buyers; a slide in the company's stock price; and demands by a subcommittee of the U.S. House of Representatives for a review of the FAA's oversight of the plane.225226

2022

In January 2022, it was reported that deliveries were not anticipated to restart until April 2022.227 In February, the FAA announced that it would withdraw Boeing's delegated authority to issue airworthiness certificates for individual 787 aircraft until Boeing can demonstrate consistent quality, stable delivery processes, and a robust plan for the rework needed on the undelivered aircraft in storage.228 In late March Boeing began sounding out suppliers about their ability to support the production of up to seven aircraft a month by late 2023.229 Vistara, which had been expecting delivery of four Dreamliners in 2022, indicated a lack of confidence in Boeing meeting its delivery aims by arranging to lease aircraft instead.230 Later in April reports began to emerge of a further delay of at least two months,231 and it was only in late April that Boeing submitted the necessary certification package laying out the inspections and repairs to be undertaken on already constructed planes. The FAA rejected portions of the package as incomplete and returned it to Boeing, indicating a further delay before the resumption of deliveries.232 In late July, the FAA approved Boeing's revised certification package, leading the company to anticipate resuming deliveries "within days".233 Deliveries resumed on August 10, 2022, after the FAA granted clearance.234

2023

In February 2023, a further problem, of an analysis error by a supplier related to the 787 forward pressure bulkhead, was identified, leading to a further temporary halt in deliveries (but not in production) and a 5% drop in the company's share price.235 On March 10, the FAA approved the resumption of the deliveries.236

2024

In April 2024, Boeing engineer Sam Salehpour reported that the 787's (as well as the 777's) fuselage had been improperly assembled and that it could cause individual aircraft to break apart in mid-air. Salehpour also claimed that he tried to raise these concerns to Boeing but was reprimanded by the company.237238 The FAA is investigating Salehpour's allegations.239 Boeing released a statement rejecting these claims.240

2025

In early 2025, Italian authorities found out about a fraud scheme involving over 4,800 parts.241 The investigation indicated that Manufacturing Process Specification (MPS), an Italian supplier, and its subcontractors had falsified quality certifications for the components used in the Dreamliner. MPS, however, no longer exists as a company.242[relevant?]

Design

The Boeing 787 Dreamliner is a long-haul, widebody, twin-engine jetliner, designed with lightweight structures that are 80% composite by volume;243 Boeing lists its materials by weight as 50% composite, 20% aluminum, 15% titanium, 10% steel, and 5% other materials.244245 Aluminum has been used throughout the leading edges of wings and tailplanes, titanium is predominantly present within the elements of the engines and fasteners, while various individual components are composed of steel.246

External features include a smooth nose contour, raked wingtips, and engine nacelles with noise-reducing serrated edges (chevrons).247 The longest-range 787 variant can fly up to 7,565 nmi (14,010 km; 8,710 mi),248 or the even longer Qantas QF 9 flight between Perth and London Heathrow, over 7,828 nmi (14,497 km; 9,008 mi). Its cruising airspeed is Mach 0.85 (488 kn; 903 km/h; 561 mph).249 The aircraft has a design life of 44,000 flight cycles.250

Flight systems

Among 787 flight systems, a key change from traditional airliners is the electrical architecture. The architecture is bleedless and replaces bleed air with electrically powered compressors and four of six hydraulic power sources with electrically-driven pumps while eliminating pneumatics and hydraulics from some subsystems, e.g. engine starters and brakes.251 Boeing says that this system extracts 35% less power from the engines, allowing increased thrust and improved fuel efficiency.252 Spoiler electromechanical actuators (SEMAs) control two of the seven spoiler pairs on each wing surface, providing roll control, air and ground speed brake, and droop capabilities similar to those provided by the hydraulic actuators used on the remaining spoiler surfaces. The SEMAs are controlled by electronic motor control units (EMCUs).253

The total available onboard electrical power is 1.45 megawatts, which is five times the power available on conventional pneumatic airliners;254 electrically-powered systems include engine start, cabin pressurization, horizontal-stabilizer trim, and wheel brakes.255 Wing ice protection is another new system; it uses electro-thermal heater mats on the wing slats instead of traditional hot bleed air.256257 An active gust alleviation system, similar to the system used on the B-2 bomber, improves ride quality during turbulence.258259

The 787 has a "fly-by-wire" control system similar in architecture to that of the Boeing 777.260261 The flight deck features multi-function LCDs, which use an industry-standard graphical user interface widget toolkit (Cockpit Display System Interfaces to User Systems / ARINC 661).262 The 787 flight deck includes two head-up displays (HUDs) as a standard feature.263 Like other Boeing airliners, the 787 uses a yoke (as opposed to a side-stick). Under consideration is the future integration of forward-looking infrared into the HUD for thermal sensing, allowing pilots to "see" through clouds.264 Lockheed Martin's Orion spacecraft will use a glass cockpit derived from Honeywell International's 787 flight deck systems.265

Honeywell and Rockwell Collins provide flight control, guidance, and other avionics systems, including standard dual head-up guidance systems,266 Thales supplies the integrated standby flight display and power management,267 while Meggitt/Securaplane provides the auxiliary power unit (APU) starting system, electrical power-conversion system, and battery-control system268269 with lithium cobalt oxide (LiCoO2) batteries by GS Yuasa.270271 One of the two batteries weighs 28.5 kg and is rated 29.6 V, 76 Ah, giving 2.2 kWh.272 Battery charging is controlled by four independent systems to prevent overcharging, following early lab testing.273 The battery systems were the focus of a regulatory investigation due to multiple lithium battery fires, which led to the grounding of the 787 fleet starting in January 2013.274

A version of Ethernet (Avionics Full-Duplex Switched Ethernet (AFDX) / ARINC 664) transmits data between the flight deck and aircraft systems.275 The control, navigation, and communication systems are networked with the passenger cabin's in-flight internet systems.276 In January 2008, FAA concerns were reported regarding possible passenger access to the 787's computer networks; Boeing has stated that various protective hardware and software solutions are employed, including air gaps to physically separate the networks, and firewalls for software separation.277278 These measures prevent data transfer from the passenger internet system to the maintenance or navigation systems.279

The −9/10 hybrid laminar flow control (HLFC) system delays the critical transition from laminar to turbulent flow as far back as possible on the vertical tail by passive suction from leading-edge holes to mid-fin low-pressure doors but was dropped from the tailplane due to lower benefits than the extra complexity and cost.280

Airframe

The 787 is the first commercial aircraft to have an airframe majority made of carbon fiber reinforced polymer (CFRP), applied in: the empennage, fuselage, wings, doors, and in most other main components.281 Each 787 contains approximately 77,000 lb (35 t) of CFRP, made with 51,000 lb (23 t) of pure carbon fiber.282 CFRP materials have a higher strength-to-weight ratio than conventional aluminum structural materials, which contributes significantly to the 787's weight savings,283 as well as superior fatigue behavior.284 Historically, the first CFRP primary structure in Boeing commercial aircraft was put into service in 1984 on the horizontal tail of the Boeing 737 Classic, and in the mid-1990s on both vertical and horizontal tail (empennage) of the Boeing 777.285 In the early 2000s, while studying the proposed Sonic Cruiser, Boeing built and tested the first CFRP fuselage section for commercial aircraft, a 20-foot (6.1-meter) long anechoic chamber, which later applied to the Dreamliner.286287 Instead of designing one-piece composite fuselage barrels like the 787, the competing Airbus A350 uses a slightly more conventional approach with CFRP panels on CFRP frames, which is considered less risky in terms of assembly tolerance between fuselage sections.288

Safety can be a concern due to lower impact energy absorption and poorer fire, smoke and toxicity capability of CFRP fuselages in the event of a crash landing, leading to whistleblower complaints at Boeing by Vince Weldon, who was fired in 2006.289290 The Occupational Safety and Health Administration (OSHA) later denied Weldon whistleblower status "largely on the grounds that Boeing's 787 design does not violate any FAA regulations or standards".291 Boeing further argued that CFRP structures have been used on empennages and other parts of airliners for many years without incident, and special damage detection procedures will be instituted for the 787 to detect any potential hidden damage.292

In 2006, Boeing launched the 787 GoldCare program.293 This is an optional, comprehensive life-cycle management service, whereby aircraft in the program are routinely monitored and repaired, as needed. Although the first program of its kind from Boeing, post-sale protection programs are not new; such programs are usually offered by third party service centers. Boeing is also designing and testing composite hardware so inspections are mainly visual. This reduces the need for ultrasonic and other non-visual inspection methods, saving time and money.294

Interior

The 787-8 is designed to typically seat 234 passengers in a three-class setup, 240 in two-class domestic configuration, and 296 passengers in a high-density economy arrangement. Seat rows can be arranged in four to seven abreast in first or business—e.g., 1–⁠2–⁠1, 2–⁠2–⁠2, or 2–⁠3–⁠2. Eight or nine abreast are options in economy—e.g., 2–⁠4–⁠2 or 3–⁠3–⁠3. Typical seat room ranges from 46 to 61 in (120 to 150 cm) pitch in first, 36 to 39 in (91 to 99 cm) in business, and 32 to 34 in (81 to 86 cm) in economy.295296

Cabin interior width is approximately 18 feet (550 cm) at armrest level.297298 The Dreamliner's cabin width is 15 inches (38 cm) more than that of the Airbus A330 and A340,299 5 inches (13 cm) less than the A350,300 and 16 in (41 cm) less than the 777.301 The 787's economy seats can be up to 17.5 in (44.4 cm) wide for nine-abreast seating302 and up to 19 inches (48 cm) wide for eight-abreast seating arrangements. Most airlines are selecting the nine-abreast (3–3–3) configuration.303304 The 787's nine-abreast seating for economy provides passengers less space, particularly across the hips and shoulders, than any other jet airliner.305 Some observers recommended passengers avoid flying 787s with nine-abreast seating,306307 although others suggested that the 787 is more comfortable than other airliners.308

The 787's cabin windows have dimensions of 10.7 by 18.4 in (27 by 47 cm),309 and a high eye level so passengers can maintain a view of the horizon.310 The composite fuselage permits larger windows without the need for structural reinforcement.311 Instead of plastic window shades, the windows use electrochromism-based smart glass (supplied by PPG Industries)312 allowing flight attendants313 and passengers to adjust five levels of sunlight and visibility to their liking,314 reducing cabin glare while maintaining a view to the outside world,315316 but the most opaque setting still has some transparency.317318 While the lavatory window also uses smart glass, it was given a traditional sunshade.319

The 787's cabin features light-emitting diodes (LEDs)320 as standard equipment, allowing the aircraft to be entirely "bulbless". LED lights have previously been an option on the Boeing 777 and Airbus aircraft fitted with standard fluorescent lights.321322 The system has three-color LEDs plus a white LED.323 The 787 interior was designed to better accommodate persons with mobility, sensory, and cognitive disabilities. For example, a 56 by 57 in (140 by 140 cm) convertible lavatory includes a movable center wall that allows two separate lavatories to become one large wheelchair-accessible facility.324

The 787's internal cabin pressure is the equivalent of 6,000 feet (1,800 m) altitude, resulting in a higher pressure than for the 8,000 feet (2,400 m) altitude of older conventional aircraft.325 According to Boeing, in a joint study with Oklahoma State University, this significantly improves passenger comfort.326327 Cabin air pressurization is provided by electrically driven compressors, rather than traditional engine-bleed air, thereby eliminating the need to cool heated air before it enters the cabin.328329 The cabin's humidity is programmable based on the number of passengers carried and allows 15% humidity settings instead of the 4% found in previous aircraft.330 The composite fuselage avoids metal fatigue issues associated with higher cabin pressure and eliminates the risk of corrosion from higher humidity levels.331 The cabin air-conditioning system improves air quality by removing ozone from outside air and, besides standard HEPA filters, which remove airborne particles, uses a gaseous filtration system to remove odors, irritants, and gaseous contaminants, as well as particulates like viruses, bacteria and allergens.332333

Engines

The Boeing 787 has two engine options: the General Electric GEnx-1B and the Rolls-Royce Trent 1000. As of early 2020, of the 1,484 total 787 orders, 905 (61%) had selected General Electric engines, 476 (32%) had chosen Rolls-Royce engines, and 103 (7%) remained undecided.334

Both engines use a standardized electrical interface, enabling airlines to install either model with minimal modifications. This interchangeability reduces the time and cost typically associated with switching engine types and is particularly attractive to lessors, as it allows airlines to maintain a common engine type across their fleet when an aircraft changes ownership.335 While earlier aircraft could accommodate engines from different manufacturers, swaps were rarely performed due to their complexity and expense.336337 Boeing has stated that engine changes on the 787 were designed to take approximately 24 hours, although lessors have reported that in practice it can take as long as 15 days.338

The 787's engines use an all-electric, bleedless system, adapted from the Sonic Cruiser, that eliminates the need for traditional superheated air conduits used for de-icing, cabin pressurization, and other functions.339340 As part of its "Quiet Technology Demonstrator 2" program, Boeing integrated several noise-reduction features into the aircraft. These include an air inlet lined with sound-absorbing materials and an exhaust duct with a chevron-toothed pattern to promote quieter mixing of exhaust with ambient air.341 Boeing says these technologies make the 787 significantly quieter both inside the cabin and in surrounding areas,342 with sound levels kept below 85 decibels at airport boundaries.343

In 2016, Rolls-Royce began flight testing the Trent 1000 TEN engine, an upgraded version of the Trent 1000 featuring a new compressor system derived from the Trent XWB and a new turbine design for extra thrust, up to 78,000 lbf (350 kN).344

Operational history

On December 6, 2011, test aircraft ZA006 (sixth 787), powered by General Electric GEnx engines, flew 10,710 nmi (19,830 km; 12,320 mi) non-stop from Boeing Field eastward to Shahjalal International Airport in Dhaka, Bangladesh, setting a new world distance record for aircraft in the 787's weight class, which is between 440,000 and 550,000 lb (200 and 250 t). This flight surpassed the previous record of 9,127 nautical miles (16,903 km; 10,503 mi), set in 2002 by an Airbus A330. The Dreamliner then continued eastbound from Dhaka to return to Boeing Field, setting a world-circling speed record of 42 hours, 27 minutes.345 In December 2011, Boeing started a six-month promotion 787 world tour, visiting various cities in China, Africa, the Middle East, Europe, United States, and others.346 In April 2012, an ANA 787 made a delivery flight from Boeing Field to Haneda Airport partially using biofuel from cooking oil.347

ANA surveyed 800 passengers who flew the 787 from Tokyo to Frankfurt: expectations were surpassed for 90% of passengers; features that met or exceeded expectations included air quality and cabin pressure (90% of passengers), cabin ambiance (92% of passengers), higher cabin humidity levels (80% of passengers), headroom (40% of passengers) and the larger windows (90% of passengers). 25% said they would go out of their way to again fly on the 787.348

After its first six months of service, Rolls-Royce powered ANA aircraft were burning around 21% less fuel than the replaced 767-300ER on international flights, slightly better than the 20% originally expected, and 15–20% on domestic routes, while GE-powered Japan Airlines aircraft were potentially slightly better.349 Other 787 operators have reported similar fuel savings, ranging from 20 to 22% compared with the 767-300ER.350 An analysis by consultant AirInsight concluded that United Airlines' 787s achieved an operating cost per seat that was 6% lower than the Airbus A330.351 In November 2017, International Airlines Group chief Willie Walsh said that for its budget carrier Level the lower cost of ownership of its two A330-200 more than offsets the 13,000 lb (6 t) higher fuel burn ($3,500 on a Barcelona-Los Angeles flight). It would introduce three more A330s as there were not enough 787 pilots.352

Early operators discovered that if the APS5000 Auxiliary power unit was shut down with the inlet door closed, heat continued to build up in the tail compartment and cause the rotor shaft to bow. It could take up to two hours for the shaft to straighten again. This was particularly acute on short haul flights as there was insufficient time to allow the unit to cool before a restart was needed. Procedures were modified and the APU was later redesigned to address the issue.353

On September 15, 2012, the NTSB requested the grounding of certain 787s due to GE engine failures; GE believed the production problem had been fixed by that time.354 In December 2012, responding to unhappiness within the airline industry at the continuing issues affecting the aircraft, Boeing CEO James McNerney stated that he regretted the impact on passengers: he went on to say that the 787's issues had been no greater than those experienced with the introduction of other Boeing models such as the 777.355356

In March 2014, Mitsubishi Heavy Industries informed Boeing of a new problem that was caused by a change in manufacturing processes. Employees did not fill gaps with shims to connect wing rib aluminum shear ties to the carbon composite wing panels; the tightened fasteners, without shims, cause excessive stress that creates hairline cracks in the wings, which could enlarge and cause further damage. Forty-two aircraft awaiting delivery were affected, and each required one to two weeks to inspect and repair. Boeing did not expect this problem to affect the overall delivery schedule, even if some airplanes were delivered late.357

Dispatch reliability is an industry standard measure of the rate of departure from the gate with no more than 15 minutes delay due to technical issues.358 The 787-8 started out with a ~96% operational reliability, increasing to ~98.5% in April 2015. Daily utilization increased from five hours in 2013 to twelve hours in 2014.359 Dispatch reliability grew to 99.3% in 2017.360

Airlines have often assigned the 787 to routes previously flown by larger aircraft that could not return a profit. For example, Air Canada offered a Toronto-Pearson to New Delhi route, first utilizing a Lockheed L1011, then a Boeing 747-400, then an Airbus A340-300, but none of these types were efficient enough to generate profit. The airline operated the route profitably with a 787-9, and credits the right number of seats and greater fuel efficiency for this success.361

Up to June 30, 2017, after 565 units were delivered since 2011: 60% -8 (340) and 40% -9 (225), the airports with most 787 departures are Haneda Airport with 304 weekly, Narita Airport with 276 and Doha Airport with 265. By the end of 2017, there were 39 airlines operating the 787 on 983 routes with an average length of 5,282 km (2,852 nmi; 3,282 mi), including 163 new routes (17%).362 As of 24 March 2018, the 787's longest route is Qantas' Perth-London Heathrow, a distance of 14,499 km (7,829 nmi; 9,009 mi) and the second-longest regular scheduled flight behind Qatar Airways' 14,529 km (7,845 nmi; 9,028 mi) route from Doha to Auckland, flown with a Boeing 777-200LR.363 In March 2020, Air Tahiti Nui executed a record commercial flight of 9,765 mi (8,486 nmi; 15,715 km), from Papeete to Paris-Charles de Gaulle, on a route that would typically refuel at Los Angeles but was able to fly the Boeing 787-9 non-stop because it was "nowhere near full" due to the COVID-19 pandemic.364

In 2023, the first 787s to be withdrawn from commercial service, two 10-year-old -8s, were torn down by Irish company EirTrade Aviation, as they would otherwise have shortly required 12-year checks and landing-gear overhauls.365 The used parts were in high demand amid the post-pandemic global shortage.366 There is no obvious recycling path for the carbon composite airframe.367

Variants

The shortest Dreamliner variant, the 787-8 was the first variant to fly in December 2009, then the longer 787-9 in September 2013, followed by the longest variant, the 787-10, in March 2017. These variants are called B788, B789, and B78X, respectively in the list of ICAO aircraft type designators.368 The short-range 787-3 was canceled in 2010.

787-8

With a typical capacity of 248 passengers and a range of 7,305 nautical miles (13,529 km; 8,406 mi), the −8 is the base model of the 787 family and was the first to enter service in 2011.369 The 787-8 is targeted to replace the Boeing 767-200ER and Airbus A330-200, as well as expand into new non-stop markets where larger planes would not be economically viable.370 As of January 2023, approximately 26% of 787 orders are for the 787-8 with 386 delivered.

In 2018, Boeing said it would change the −8 manufacturing to raise its commonality with the −9 above the current 30% to be more like the 95% commonality between the −9 and −10, as it will benefit from learning from those.371 When it was launched, a new 787-8 was to cost only slightly more than the 767-300ER, valued new for $85 million at its 1990s peak, but it ended being 20% more costly.372 It competes with the Airbus A330-200 and Airbus A330-800.

787-9

Keeping the same wingspan as the 787-8, the 787-9 is a lengthened and strengthened variant with a 20-foot-longer (6.1 m) fuselage and a 54,500-pound-higher (24,700 kg) maximum take-off weight (MTOW), seating 296 passengers in a typical two-class cabin configuration over a 7,565-nautical-mile (8,706 mi; 14,010 km) range.373 It features active boundary-layer control on the tail surfaces, reducing drag.374 The 787-9 is targeted to replace the Boeing 767-300ER and Airbus A330-300. It competes with the Airbus A330-900.

In 2005, the entry into service (EIS) was planned for 2010. The firm configuration was finalized on July 1, 2010.375 By October 2011, deliveries were scheduled to begin in 2014.376

The prototype 787-9 made its maiden flight from Paine Field on September 17, 2013.377 By November 8, 2013, it had flown 141 hours.378 A 787-9 was on static display at the 2014 Farnborough Air Show prior to first delivery.379 On July 8, 2014, launch customer Air New Zealand took its first 787-9, in a distinctive black livery in a ceremony at Paine Field.380 The first revenue service was operated by All Nippon Airways on August 7, 2014. Air New Zealand operated its first commercial flight from Auckland to Sydney on August 9, 2014.381

The 787-9 was to begin commercial service with All Nippon Airways on August 7, 2014.382 United Airlines was to start the longest nonstop scheduled 787 service between Los Angeles and Melbourne in October 2014.383 Air China started a 787-9 route between Beijing and Chengdu in May 2016.384 As of January 2023, 63% of all 787 orders are for the 787-9, with 580 deliveries. A 2014 787-9 leased for $1.05 million per month, and fell to $925,000 per month in 2018.385

The 20-foot (6.1 m) stretch was achieved by adding 10-foot (3.0 m) (five-frame) extensions forward and aft of the wing. The 787-8 and 787-9 have 50% commonality: the wing, fuselage and systems of the 787-8 had required radical revision to achieve the payload-range goals of the 787-9. Following a major revamp of the original 787-8 wing, the latest configuration for the 787-9 and −10 is the fourth design evolution.386

On March 25, 2018, a Qantas 787-9 completed the first scheduled non-stop flight between Australia and the UK flying seventeen hours from Perth to London Heathrow.387 On October 20, 2019, a Qantas 787-9 was flight tested from New York to Sydney with a restricted payload. A team of researchers monitored passengers and crew to investigate wellness and performance on long flights.388 On March 16, 2020, an Air Tahiti Nui 787-9 achieved the longest commercial flight of 8,485 nmi (15,714 km; 9,764 mi).389

787-10

In December 2005, pushed by the interest of Emirates and Qantas, Boeing was studying the possibility of stretching the 787-9 further to seat 290 to 310 passengers. This variant would be similar to the capacity of the Boeing 777-200 and the Airbus A350-900, although with a shorter range.390 Customer discussions were continuing in early 2006.391 Mike Bair, Boeing's vice president and general manager for the 787 development program at the time, said it was easier to proceed with the 787-10 development after other customers followed Emirates' request. This variant is targeted to replace the Boeing 767-400ER and Airbus A330-300.392

On May 30, 2013, Singapore Airlines became the launch customer by stating it would order 30 787-10s (provided Boeing launched the program), to be delivered in 2018–2019.393394 On June 18, 2013, Boeing officially launched the 787-10 at the Paris Air Show, with orders or commitments for 102 aircraft from Air Lease Corporation (30), Singapore Airlines (30), United Airlines (20), British Airways (12), and GE Capital Aviation Services (10).395 As of January 2023, the aircraft has 189 orders out of which 115 have been delivered, 7 of which are stored.396

This variant was envisioned as replacing Boeing 777-200 and Airbus A340-500 aircraft.397 It competes with the Airbus A350-900, and according to Boeing, it offers better economics than its Airbus competitor on shorter routes.398 Steven Udvar-Hazy said, "If it's identically configured, the −10 has a little bit of an edge on the −900", but smaller than Boeing's estimate of 10 percent.399 The 787-10 is 224 ft (68 m) long, seats 336 passengers in a two-class cabin configuration, and has a range of 6,330 nmi (11,720 km; 7,280 mi).400

Boeing completed detailed design for the −10 on December 2, 2015.401 Major assembly began in March 2016.402 Designers targeted 90% commonality between the 787-9 and −10 and achieved 95%; the 18-foot (5.5 m) stretch was reached by adding 10 ft forward of the wing and 8 ft aft, and by strengthening the fuselage for bending loads in the center wingbox. Because of the length and additional tail strike protection needed, a semilevered landing gear enables rotation over the aft wheels rather than at the bogie center, like the 777-300ER, and the cabin air conditioning system has 15% more capacity. The first and third −10 test-platforms incorporate Rolls-Royce's new Trent 1000 TEN engines, while the second is powered by the competing General Electric GEnx-1B engine.403

Major fuselage parts were received for final assembly on November 30, 2016. The 787-10's mid-fuselage sections are too large for transport to Everett, Washington and it is built only in Charleston, South Carolina;404 it is the first Boeing airliner assembled exclusively there.405 The first −10 was rolled out on February 17, 2017.406 The variant's first flight took place on March 31, 2017, and lasted 4 hours and 48 minutes.407

The first test 787-10 aircraft is engaged in flight envelope expansion work and the second joined the program in early May 2017, while the third with a passenger cabin interior to test the uprated environmental control system and Trent fuel-burn performance was scheduled to join in June. The −10 was scheduled to appear at the 2017 Paris Air Show.408 The second −10 is being used to prove the GE Aviation engines and the third made its first flight on June 8, 2017, when the flight-test programme was 30% complete.409 Boeing finished final assembly and painting of the first production 787-10 in October 2017, before its certification.410 The last stages of flight tests focused on fuel burn validation and revised flight control software.411[needs update]

At the start of the November 2017 Dubai Air Show, the 787-10 had 171 orders; Emirates committed to 40 787-10s, in two- and three-class cabins for 240 to 330 passengers, to be delivered from 2022 and with conversion rights to the smaller 787-9.412413 These aircraft are adapted for 7–8.5 hour missions, in a 280-seat three–class layout.414 Emirates' Tim Clark was doubtful it would meet its MTOW for the payload-range required with initial 70,000–72,000 lbf (310–320 kN) thrust engines, but with the current 76,000 lbf (340 kN) turbofans and the −9 early margins gave the −10 "stellar economics".415 By early 2019, Emirates was considering canceling its 787-10 order, due to engine margins being insufficient for the hot Dubai weather, in favor of the Airbus A350 (which would also replace its last Airbus A380 order).416 At the 2019 Dubai Air Show, Emirates placed an order for 30 787-9 aircraft rather than the 787-10.417

In January 2018, the −10 was certified by the FAA after testing for 900 flight hours.418 Boeing received its production certificate on February 15.419 It was first delivered to launch customer Singapore Airlines on March 25, 2018.420 Fitted with 337 seats, 36 in business and 301 in economy,421 the −10 began commercial service on April 3, 2018.422

The 8.7% fuselage stretch from the −9 to the −10 likely increased empty weight at a lower rate than the 7.4% growth from the −8 to the −9 due to the 10.7% stretch.423 Software changes increased the tailplane effectiveness to avoid modifying it. With the same wing but a longer fuselage than the −9, the flutter margin was reduced for the −10 but to avoid stiffening the wing or adding wingtip counterweights for commonality, software oscillates the elevators in the flaps up vertical mode suppression system (F0VMS), similar to the vertical gust load alleviation system.424

To replace Air New Zealand's 777-200 fleet, Boeing wants to increase the 787-10 MTOW by over 13,000 pounds (5.9 t) to 572,000 pounds (259 t) with some reinforcements and updated fuel systems. This would allow more range, such as the 5,600 nmi (10,400 km; 6,400 mi) trip from Auckland to Los Angeles with no passenger restrictions and some cargo. The increased performance could trickle down to the 787-9, allowing Auckland to New York flights.425

BBJ 787

The 787-8 and −9 are offered as Boeing Business Jets, the first offering 2,415 sq ft (224.4 m2) of floor space and a range of 9,945 nmi (18,418 km; 11,445 mi)), the other 2,775 sq ft (257.8 m2) and 9,485 nmi (17,566 km; 10,915 mi), both with 25 passengers. Through June 2018, fifteen have been ordered, twelve delivered and four were in service.426

Experimental

Main article: ecoDemonstrator

Two 787 aircraft have been used in Boeing's ecoDemonstrator program which aims to develop technology and techniques to reduce the environmental effects of aviation. The testing involves many partner organizations including engine and systems manufacturers, NASA, academic, research, and regulatory institutions. The program started in 2011 with a different airframe being used each year.427

In 2014, the fourth prototype 787-8 was used for tests including use of sustainable aviation fuel, ceramic matrix composite engine exhaust nozzles, and systems for improved air traffic control (ATC) communications and closer landing approach spacing.428 In 2020, a new 787-10 took part in the program, including intensive noise reduction trials, and including text-based ATC communications and cabin hygiene and cleansing tests related to the COVID-19 pandemic. After removal of the test equipment, the aircraft was delivered to Etihad Airways.429

In April 2023, Boeing announced the ecoDemonstrator Explorer program, which would run alongside the ecoDemonstrator program. The first Explorer program in 2023 tested international route planning (trajectory-based operations – a major aim of the FAA's NextGen project) and maximization of sustainable aviation fuel use for a planned 10% fuel efficiency gain, using a 787-10.430431

Operators

Main article: List of Boeing 787 operators

There are 1,006 Boeing 787 aircraft in airline service as of February 2022, comprising 377 787-8s, 568 787-9s and 61 787-10s, with outstanding orders for further 481 aircraft.432[needs update] As of August 2019, the largest operators are All Nippon Airways (77), United Airlines (63), Japan Airlines (47), and American Airlines (46).433[needs update]

Orders and deliveries

Main article: List of Boeing 787 orders and deliveries

In September 2011, the 787 was first officially delivered to launch customer All Nippon Airways.434 As of December 2018, the top five identified 787 customers are American Airlines with 89 orders (37 -8s and 52 -9s), All Nippon Airways with 83 orders (36 -8s, 44 -9s and three −10s), ILFC (an aircraft leasing company) with 74 orders (23 -8s and 51 -9s), and United Airlines (12 -8s, 38 -9s and 21 -10s) and Etihad Airways (41 -9s and 30 -10s), both with 71 orders.

On December 13, 2018, the 787th Boeing 787 was delivered to AerCap and leased to China Southern Airlines. By then the 787 had flown 300 million passengers on 1.5 million flights and opened 210 new nonstop routes.435 The 1000th Dreamliner, a 787-10 for Singapore Airlines, made its maiden flight on April 3, 2020.436

Boeing 787 orders and deliveries by type
Total ordersTotal deliveriesUnfilled
787‑843139833
787‑91,342670672
787‑10364121243
Total2,1371,189948
Boeing 787 net orders and deliveries by year
20212022202320242025Total
Net orders−11114301481802,137
Deliveries787‑8291011398
787‑91210402923670
787‑101223214121
Total14317351281,189
20042005200620072008200920102011201220132014201520162017201820192020
Net orders5623515736993−59−413−12182417158941098220
Deliveries787‑83466510471352610105
787‑9106410211012011436
787‑10153412
Total3466511413513713614515853

Boeing 787 orders and deliveries (cumulative, by year):

  Orders   Deliveries — as of May 2025.437

Accidents and incidents

The Boeing 787 has been involved in eight accidents and incidents as of June 2025, including one fatal hull loss.438439

Fatal accident

On June 12, 2025, Air India Flight 171, an 11-year-old Boeing 787-8 Dreamliner registered as VT-ANB440 operating from Ahmedabad Airport to London Gatwick Airport, crashed into a medical college hostel 1.5km from the runway shortly after takeoff in the Meghaninagar suburb of Ahmedabad. 241 out of the 242 people on-board were killed, as well as 39+ people on the ground.441 The sole survivor was a British national seated in 11A, near the emergency exit. This marked the first fatal crash and hull loss of a Boeing 787.442443 Joint investigations into the crash have begun by USA’s NTSB, Indian and British aviation authorities.

Operational problems

A Japan Airlines (JAL) 787 experienced a fuel leak on January 8, 2013, and its flight from Boston was canceled.444 The next day, United Airlines reported a problem in one of its six 787s with the wiring near the main batteries. Soon, the U.S. National Transportation Safety Board opened a safety probe.445 Fuel leaks also occurred on January 11, 2013446 and on January 13, 2013, at Narita International Airport outside Tokyo. The aircraft reportedly was the same one that had a fuel leak on January 8.447448 Japan's transport ministry also launched an investigation.449

On January 11, 2013, the FAA completed a comprehensive review of the 787's critical systems including the design, manufacture, and assembly. The Department of Transportation secretary Ray LaHood stated the administration was "looking for the root causes" behind the recent issues. The head of the FAA, Michael Huerta, said that so far nothing found "suggests [the 787] is not safe."450

On July 12, 2013, a fire started on an empty Ethiopian Airlines 787 parked at Heathrow Airport before it was extinguished by the airport fire and rescue service. No injuries were reported.451452 The fire caused extensive heat damage to the aircraft.453 The FAA and NTSB sent representatives to assist in the investigation.454 The initial investigation found no direct link with the aircraft's main batteries.455 Further investigations indicated that the fire was due to lithium-manganese dioxide batteries powering an emergency locator transmitter (ELT).456 The UK Air Accidents Investigation Branch (AAIB) issued a special bulletin on July 18, 2013, requesting the US FAA ensure that the locator is removed or disconnected in Boeing 787s and to review the safety of lithium battery-powered ELT systems in other aircraft types.457 On August 19, 2015, the Associated Press reported that the fire was started by a short circuit caused by crossed wires located under the battery. The Air Accidents Investigation Branch's investigators recommended that "the U.S. Federal Aviation Administration, together with similar bodies in Europe and Canada, should conduct a review of equipment powered by lithium metal batteries to ensure they have 'an acceptable level of circuit protection.'"458

On July 26, 2013, ANA said it had found wiring damage on two 787 locator beacons. United Airlines also reported that it had found a pinched wire in one 787 locator beacon.459 On August 14, 2013, the media reported a fire extinguisher fault affecting three ANA airplanes, which caused the fire extinguishers to discharge into the opposite engine from the one requested.460 The fault was caused by a supplier assembly error.461

On November 22, 2013, Boeing issued an advisory to airlines using General Electric GEnx engines on 787 and 747-8 aircraft to avoid flying near high-level thunderstorms due to an increased risk of icing on the engines. The problem was caused by a buildup of ice crystals just behind the main fan causing a brief loss of thrust on six occasions.462

On January 21, 2014, a Norwegian Air Shuttle 787 experienced a fuel leak which caused a 19-hour delay to a flight from Bangkok to Oslo.463 The leak became known to pilots only after it was pointed out by concerned passengers.464 It was found later that a faulty valve was responsible.465 This fuel leak is one of numerous problems experienced by Norwegian Air Shuttle's 787 fleet.466 Mike Fleming, Boeing's vice president for 787 support and services, subsequently met with executives of Norwegian Air Shuttle and expressed Boeing's commitment to improving the 787's dispatch reliability, "we're not satisfied with where the airplane is today, flying at a fleet average of 98 percent...The 777 today flies at 99.4 percent...and that's the benchmark that the 787 needs to attain."467468

In March 2016, the FAA accelerated the release of an airworthiness directive in response to reports indicating that in certain weather conditions "erroneous low airspeed may be displayed..." There was concern "abrupt pilot control inputs in this condition could exceed the structural capability of the airplane." Pilots were told not to apply "large, abrupt control column inputs" in the event of an "unrealistic" drop in displayed airspeed.469470

On April 22, 2016, the FAA issued an airworthiness directive following a January 29, 2016 incident in which a General Electric GEnx-1B PIP2 engine suffered damage and non-restartable power loss while flying at an altitude of 20,000 feet. The damage is thought to have been caused by a fan imbalance resulting from fan ice shedding.471472

On June 18, 2021, a British Airways 787-8, registration G-ZBJB, spontaneously suffered a nose gear collapse at London Heathrow Airport while stationary at Stand 583. Photographs circulated after the incident showed the aircraft resting on its nose, with some damage to its nose gear door.473 No passengers were on board, and the flight was in the process of being loaded with cargo for a cargo-only flight from Heathrow to Frankfurt Airport at the time of the incident. The UK's Air Accidents Investigation Branch (AAIB) determined that an incorrectly inserted pin, used during routine maintenance to prevent the gear retracting when the hydraulics are cycled, was the cause of the accident.474475476

On March 11, 2024, LATAM Airlines Flight 800 experienced a sudden drop in altitude, resulting in 50 injuries to those aboard and 12 with serious injuries being hospitalized. As of March 13, 2024, the cause is still under investigation.477

Lithium-ion battery problems

Main article: 2013 Boeing 787 Dreamliner grounding

On January 16, 2013, All Nippon Airways Flight 692, en route from Yamaguchi Ube Airport to Tokyo Haneda, had a battery problem warning followed by a burning smell while climbing from Ube about 35 nautical miles (65 km; 40 mi) west of Takamatsu, Japan. The aircraft diverted to Takamatsu and was evacuated via the slides; three passengers received minor injuries during the evacuation. Inspection revealed a battery fire. A similar incident in a parked Japan Airlines 787 at Boston's Logan International Airport within the same week led the Federal Aviation Administration to ground all 787s.478 On January 16, 2013, both major Japanese airlines ANA and JAL voluntarily grounded their fleets of 787s after multiple incidents involving different 787s, including emergency landings. At the time, these two carriers operated 24 of the 50 787s delivered.479480 The grounding reportedly cost ANA some 9 billion yen (US$93 million) in lost sales.481

On January 16, 2013, the FAA issued an emergency airworthiness directive ordering all American-based airlines to ground their Boeing 787s until yet-to-be-determined modifications were made to the electrical system to reduce the risk of the battery overheating or catching fire.482 This was the first time that the FAA had grounded an airliner type since 1979.483 Industry experts disagreed on consequences of the grounding: Airbus was confident that Boeing would resolve the issue484 and that no airlines will switch plane type,485486 while other experts saw the problem as "costly"487 and "could take upwards of a year".488

The FAA also conducted an extensive review of the 787's critical systems. The focus of the review was on the safety of the lithium-ion batteries489 made of lithium cobalt oxide (LiCoO2). The 787 battery contract was signed in 2005,490 when this was the only type of lithium aerospace battery available, but since then newer and safer491 types (such as LiFePO4), which provide less reaction energy with virtually no cobalt content to avoid cobalt's thermal runaway characteristic, have become available.492493 FAA approved a 787 battery in 2007 with nine "special conditions".494495 A battery approved by FAA (through Mobile Power Solutions) was made by Rose Electronics using Kokam cells;496 the batteries installed in the 787 are made by Yuasa.497

On January 20, the NTSB declared that overvoltage was not the cause of the Boston incident, as voltage did not exceed the battery limit of 32 V,498 and the charging unit passed tests. The battery had signs of short circuiting and thermal runaway.499 Despite this, by January 24, the NTSB had not yet pinpointed the cause of the Boston fire; the FAA would not allow U.S.-based 787s to fly again until the problem was found and corrected. In a press briefing that day, NTSB Chairwoman Deborah Hersman said that the NTSB had found evidence of failure of multiple safety systems designed to prevent these battery problems, and stated that fire must never happen on an airplane.500

The Japan Transport Safety Board (JTSB) said on January 23 that the battery in ANA jets in Japan reached a maximum voltage of 31 V (below the 32 V limit like the Boston JAL 787), but had a sudden unexplained voltage drop501 to near zero.502 All cells had signs of thermal damage prior to runaway.503 ANA and JAL had replaced several 787 batteries before the mishaps.504 As of January 29, 2013, JTSB approved the Yuasa factory quality control505506 while the NTSB examined the Boston battery for defects.507 The failure rate, with two major battery thermal runaway events in 100,000 flight hours, was much higher than the rate of one in 10 million flight hours predicted by Boeing.508

The only American airline that operated the Dreamliner at the time was United Airlines, which had six.509 Chile's Directorate General of Civil Aviation (DGAC) grounded LAN Airlines' three 787s.510 The Indian Directorate General of Civil Aviation (DGCA) directed Air India to ground its six Dreamliners. The Japanese Transport Ministry made the ANA and JAL groundings official and indefinite following the FAA announcement.511 The European Aviation Safety Agency also followed the FAA's advice and grounded the only two European 787s operated by LOT Polish Airlines.512 Qatar Airways grounded their five Dreamliners.513 Ethiopian Airlines was the final operator to temporarily ground its four Dreamliners.514 By January 17, 2013, all 50 of the aircraft delivered to date had been grounded.515516 On January 18, Boeing halted 787 deliveries until the battery problem was resolved.517

On February 7, 2013, the FAA gave approval for Boeing to conduct 787 test flights to gather additional data.518519 In February 2013, FAA oversight of the 787's 2007 safety approval and certification was under scrutiny.520 On March 7, 2013, the NTSB released an interim factual report about the Boston battery fire on January 7, 2013. The investigation521 stated that "heavy smoke and fire coming from the front of the APU battery case." Firefighters "tried fire extinguishing, but smoke and flame (flame size about 3 inches, or 8 cm) did not stop".522523

Boeing completed its final tests on a revised battery design on April 5, 2013.524 The FAA approved Boeing's revised battery design with three additional, overlapping protection methods on April 19, 2013.525 The FAA published a directive on April 25 to provide instructions for retrofitting battery hardware before the 787s could return to flight.526527 The repairs were expected to be completed in weeks.528 Following the FAA approval in the U.S. effective April 26,529 Japan approved resumption of Boeing 787 flights in the country on April 26, 2013.530 On April 27, 2013, Ethiopian Airlines took a 787 on the model's first commercial flight after battery system modifications.531532

On January 14, 2014, a battery in a JAL 787 emitted smoke from the battery's protection exhaust while the aircraft was undergoing pre-flight maintenance at Tokyo Narita Airport.533534 The battery partially melted in the incident;535 one of its eight lithium-ion cells had its relief port vent and fluid sprayed inside the battery's container.536 It was later reported that the battery may have reached a temperature as high as 1,220 °F (660 °C), and that Boeing did not understand the root cause of the failure.537

The NTSB criticized the FAA, Boeing, and battery manufacturers for the faults in a 2014 report.538539540541 It also criticized the GE-made flight data and cockpit voice recorder in the same report.542 The enclosure Boeing added is 185 lb (84 kg) heavier, negating the lighter battery potential.543

Aircraft on display

All three prototype 787-8s are preserved in museums.

Specifications

787 characteristics548
Model787-8787-9787-10
Cockpit crewTwo
Seating, 2-class242: 24J @85" + 218Y @32"290: 28J @85" + 262Y @32"330: 32J @85" + 298Y @32"
Seating, 1-classMax. 359, exit limit 381Max. 406, exit limit 420Max. 440, exit limit 440
Length186 ft 1 in (56.72 m)206 ft 1 in (62.81 m)224 ft (68.28 m)
Wing5499.59 aspect ratio, 4,058 sq ft (377 m2) area, 32.2° wing sweep550
Wingspan551197 ft 3 in (60.12 m) span, 20.58 feet (6.27 m) mean chord
Height55255 ft 6 in (16.92 m)55 ft 10 in (17.02 m)
FuselageCabin width: 18 ft 0 in (5.49 m);553 External width: 18 ft 11 in (5.77 m) Height: 19 ft 6 in (5.94 m)
Cargo capacity4,826 cu ft / 136.7 m3 28 LD3 or 9 (88×125) pallets6,090 cu ft / 172 m3 36 LD3 or 11 (96×125) pallets6,722 cu ft / 190.3 m3 40 LD3 or 13 (96×125) pallets
Maximum takeoff weight502,500 lb / 227,900 kg561,500 lb / 254,700 kg560,000 lb / 254,000 kg
Maximum payload90,500 lb / 41,100 kg116,000 lb / 53,000 kg126,300 lb / 57,277 kg
Operating empty weight264,500 lb / 120,000 kg284,000 lb / 129,000 kg298,700 lb / 135,500 kg
Fuel capacity33,340 US gal / 126,206 L 223,378 lb / 101,343 kg33,399 US gal / 126,429 L 223,773 lb / 101,522 kg
SpeedMax.: Mach 0.90 (594 mph; 516 kn; 956 km/h);554 Cruise: Mach 0.85 (561 mph; 488 kn; 903 km/h)
Range5555567,305 nmi (13,530 km; 8,410 mi)7,565 nmi (14,010 km; 8,710 mi)6,330 nmi (11,720 km; 7,280 mi)
Takeoff5578,500 ft (2,600 m)9,300 ft (2,800 m)9,100 ft (2,800 m)
Ceiling55843,100 ft (13,100 m)41,100 ft (12,500 m)
Engines (×2)General Electric GEnx-1B or Rolls-Royce Trent 1000
Thrust (×2)64,000 lbf (280 kN)71,000 lbf (320 kN)76,000 lbf (340 kN)
ICAO designationB788B789B78X

See also

Related development

Aircraft of comparable role, configuration, and era

Related lists

Citations

Bibliography

  • Norris, Guy; Wagner, Mark (2009). Boeing 787 Dreamliner. Minneapolis: Zenith Press. ISBN 978-0-7603-2815-6.
  • Thisdell, Dan; Seymour, Chris (August 5, 2019). "World Airliner Census". Flight International. Vol. 196, no. 5697. pp. 24–47. ISSN 0015-3710.
Wikimedia Commons has media related to: Boeing 787 (category)

References

  1. Gunter, Lori (July 2002). "The Need for Speed, Boeing's Sonic Cruiser team focuses on the future". Boeing Frontier magazine. Retrieved January 21, 2011. http://www.boeing.com/news/frontiers/archive/2002/july/i_ca2.html

  2. Banks, Howard (May 28, 2001). "Paper plane: That Mach 0.95 Sonic Cruiser from Boeing will never fly. Here's why". Forbes. Archived from the original on October 16, 2007. Retrieved June 7, 2007. https://web.archive.org/web/20071016070803/http://members.forbes.com/global/2001/0528/056.html

  3. Norris, G; Thomas, G; Wagner, M; Forbes Smith, C (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 978-0-9752341-2-9. 978-0-9752341-2-9

  4. "History of the Boeing 787". The Seattle Times. Associated Press. June 23, 2000. Archived from the original on June 6, 2013. Retrieved October 28, 2012. https://web.archive.org/web/20130606210919/http://seattletimes.com/html/nationworld/2009373399_apusboeing787historyglance.html

  5. Cannegieter, Roger. "Long Range vs. Ultra High Capacity". Aerlines.nl. Retrieved October 12, 2015. https://www.scribd.com/doc/117503295/31-Cannegieter-Ranging-Capabilities

  6. Babej, Marc E.; Pollak, Tim (May 24, 2006). "Boeing Versus Airbus". Forbes. Retrieved April 8, 2010. https://www.forbes.com/2006/05/23/unsolicited-advice-advertising-cx_meb_0524boeing.html

  7. Randy Baseler (May 20, 2005). "Kangaroo hop". Randy's Journal. The Boeing Company. http://boeingblogs.com/randy/archives/2005/05/kangaroo_hop.html

  8. Tkacik, Maureen (September 18, 2019). "Crash Course". The New Republic. https://newrepublic.com/article/154944/boeing-737-max-investigation-indonesia-lion-air-ethiopian-airlines-managerial-revolution

  9. "Maximizing the Middle, Finding the sweet spot in the market" (Press release). Boeing Frontier magazine. March 2003. http://www.boeing.com/news/frontiers/archive/2003/march/cover.html

  10. "Boeing Achieves 787 Power On" (Press release). Boeing. June 20, 2008. Archived from the original on January 2, 2013. https://archive.today/20130102064100/http://www.boeing.com/news/releases/2008/q2/080620b_nr.html

  11. "Daydream believer: How different is the Boeing 787?". Flight International. Retrieved December 14, 2010. https://www.flightglobal.com/news/articles/daydream-believer-how-different-is-the-boeing-787-218786/

  12. Norris, G; Thomas, G; Wagner, M; Forbes Smith, C (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 978-0-9752341-2-9. 978-0-9752341-2-9

  13. "Name Your Plane sweepstakes". Boeing Frontiers Online. July 2003. Retrieved September 28, 2007. http://www.boeing.com/news/frontiers/archive/2003/july/i_nan.html

  14. Norris & Wagner 2009, p. 40. - Norris, Guy; Wagner, Mark (2009). Boeing 787 Dreamliner. Minneapolis: Zenith Press. ISBN 978-0-7603-2815-6.

  15. "New Boeing 7E7 Airplane Gets a Name". Boeing, June 15, 2003. http://boeing.mediaroom.com/2003-06-15-New-Boeing-7E7-Airplane-Gets-a-Name

  16. "Boeing Launches 7E7 Dreamliner" (Press release). Boeing. April 26, 2004. https://boeing.mediaroom.com/2004-04-26-Boeing-Launches-7E7-Dreamliner

  17. "ANA says Denver still in hunt for non-stop to Tokyo". Metro Denver. April 8, 2009. Archived from the original on January 3, 2011. Retrieved December 14, 2010. https://web.archive.org/web/20110103031140/http://www.metrodenver.org/blog-tags/industries/ANA-Japan-Denver-international-flight.html

  18. Shifrin, Carole (March 27, 2006). "Dream start". Flight International. Retrieved September 27, 2015. https://www.flightglobal.com/news/articles/dream-start-205611/

  19. "Air India takes delivery of first South Carolina-made Boeing 787". Reuters. October 5, 2012. Retrieved July 23, 2020. https://www.reuters.com/article/us-boeing-southcarolina-idUSBRE8941AW20121005

  20. "The Dream of Composites". R&D Magazine. November 20, 2006. Archived from the original on April 5, 2012. Retrieved November 23, 2012. https://web.archive.org/web/20120405220154/http://www.rdmag.com/Featured-Articles/2006/11/The-Dream-of-Composites/

  21. Walz, Martha (November 20, 2006). "The Dream of Composites". RD mag. Retrieved September 2, 2011. http://www.rdmag.com/Featured-Articles/2006/11/The-Dream-of-Composites/

  22. Norris, G; Thomas, G; Wagner, M; Forbes Smith, C (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 978-0-9752341-2-9. 978-0-9752341-2-9

  23. Norris, Guy (January 9, 2009). "Boeing Rules Out 787 Window Change". Aviation Week. http://aviationweek.com/awin/boeing-rules-out-787-window-change

  24. Ogando, Joseph (June 7, 2007). "Design News – Features – Boeing's 'More Electric' 787 Dreamliner Spurs Engine Evolution". designnews.com. Archived from the original on April 6, 2012. Retrieved September 7, 2011. https://web.archive.org/web/20120406062451/http://www.designnews.com/document.asp?doc_id=222308

  25. Norris & Wagner 2009, p. 48. - Norris, Guy; Wagner, Mark (2009). Boeing 787 Dreamliner. Minneapolis: Zenith Press. ISBN 978-0-7603-2815-6.

  26. Shifrin, Carole (March 27, 2006). "Dream start". Flight International. Retrieved September 27, 2015. https://www.flightglobal.com/news/articles/dream-start-205611/

  27. Gates, Dominic (September 18, 2007). "Boeing news – Fired engineer calls 787's plastic fuselage unsafe". The Seattle Times. Archived from the original on October 16, 2012. https://web.archive.org/web/20121016064706/http://seattletimes.com/html/boeingaerospace/2003889663_boeing180.html

  28. "Review – History of 787 Composites Project at Boeing" (PDF). csmres.co.uk. http://csmres.co.uk/cs.public.upd/article-downloads/boeing-final.pdf

  29. Pandey, Mohan (2010). How Boeing Defied the Airbus Challenge. USA: Createspace. ISBN 978-1-4505-0113-2. 978-1-4505-0113-2

  30. Marsh, George (2009). "Boeing's 787: trials, tribulations, and restoring the dream". Reinforced Plastics. 53 (8): 16–21. doi:10.1016/S0034-3617(09)70311-X. ISSN 0034-3617. /wiki/Doi_(identifier)

  31. "Boeing boosts aircraft prices 5.5% on rising cost of labor, materials". Air Transport World. June 26, 2007. Retrieved September 2, 2011. http://atwonline.com/aircraftenginescomponents/news/boeing-boosts-aircraft-prices-55-rising-cost-labor-materials-0309

  32. "Jet Prices". March 22, 2013. Archived from the original on March 22, 2013. Retrieved March 8, 2025. http://web.archive.org/web/20130322022418/http://www.boeing.com/boeing/commercial/prices/index.page

  33. "How Much Does a Boeing 787 Really Cost?" (PDF). AirInsight. May 18, 2016. Archived from the original (PDF) on April 13, 2019. http://web.archive.org/web/20190413234207/https://airinsight.com/wp-content/uploads/2016/02/247wallst-com.pdf

  34. Norris, G; Thomas, G; Wagner, M; Forbes Smith, C (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 978-0-9752341-2-9. 978-0-9752341-2-9

  35. "Boeing Unveils 787 Final Assembly Factory Flow." Boeing, December 6, 2006. Retrieved September 3, 2011. https://web.archive.org/web/20071223183836/http://boeingmedia.com/imageDetail.cfm?id=14679&KeyWord=787&buID=0&caid=0&prid=0&sc=lrg&pn=1&clr=&CFID=2903355&CFTOKEN=34556541

  36. "Boeing's Big Dream". Fortune. May 5, 2008. p. 182.. (online version) Archived July 30, 2013, at the Wayback Machine http://bx.businessweek.com/boeing-787/view?url=http%3A%2F%2Fc.moreover.com%2Fclick%2Fhere.pl%3Fr1389599468%26f%3D9791

  37. "Boeing unveils 787 Dreamliner; Airbus sends congrats". USA Today. July 9, 2007. Retrieved September 2, 2011. https://www.usatoday.com/travel/flights/2007-07-09-boeing-787-debuts_N.htm

  38. "Boeing's Big Dream". Fortune. May 5, 2008. p. 187.

  39. "Boeing Revises 787 First Flight and Delivery Plans; Adds Schedule Margin to Reduce Risk of Further Delays" (Press release). Boeing. April 9, 2008. Archived from the original on September 15, 2011. Retrieved September 2, 2011. https://web.archive.org/web/20110915024602/http://www.boeing.com/news/releases/2008/q2/080409b_nr.html

  40. "Boeing's Big Dream", Fortune, May 5, 2008, p. 182.

  41. "Boeing considers moving 787-9 tail build in-house". ATW Online. October 30, 2010. Retrieved October 30, 2010. http://atwonline.com/aircraft-engines-components/news/boeing-considers-moving-787-9-tail-build-house-1022

  42. Thisdell, Dan (February 4, 2013). "In focus: Debt dogs Finmeccanica". Flightglobal. Retrieved April 18, 2015. http://www.flightglobal.com/news/articles/in-focus-debt-dogs-finmeccanica-381607/

  43. "Boeing's Big Dream", Fortune, May 5, 2008, p. 184.

  44. Seo, Sookyung (September 29, 2010). "Boeing 787 Supplier Korea Aerospace Hires Share-Sale Arrangers". Bloomberg. Retrieved September 2, 2011. https://www.bloomberg.com/news/2010-09-29/korea-aerospace-to-double-exports-helped-by-boeing-787-parts.html

  45. "Boeing Completes Acquisition of Vought Operations in South Carolina" (Press release). Boeing. July 30, 2009. Retrieved September 2, 2011. http://boeing.mediaroom.com/index.php?s=43&item=775

  46. Gates, D. (September 11, 2005). "Boeing 787: Parts from around world will be swiftly integrated". The Seattle Times. Retrieved September 2, 2011. http://seattletimes.nwsource.com/html/businesstechnology/2002486348_787global11.html

  47. "Korean Air to Buy 10 '787 Dreamliners'". The Korea Times. July 12, 2007. https://www.koreatimes.co.kr/www/news/nation/2008/04/119_6376.html

  48. "Boeing" (PDF). HCL Technologies. Retrieved January 20, 2013. http://www.hcltech.com/pdf/boeing.pdf

  49. "India's Tata Group to supply parts for Boeing Dreamliner". Agence France-Presse. February 6, 2008. Retrieved February 7, 2008. http://afp.google.com/article/ALeqM5hPLDpu6bLmTgk5mXHXMgUR0moZSw

  50. Bhagwat, Ramu (February 7, 2008). "Tatas to make Boeing 787 parts at Mihan". The Times of India. Archived from the original on October 16, 2013. Retrieved September 2, 2011. https://timesofindia.indiatimes.com/city/nagpur/Tatas-to-make-Boeing-787-parts-at-Mihan/articleshow/2763086.cms

  51. "787 Dreamliner International team facts" (Press release). Boeing. Retrieved June 10, 2010. http://www.boeing.com/commercial/787family/dev_team.html

  52. "Korean Air ready for 787 ramp up". The Brisbane Times. September 30, 2010. Retrieved September 3, 2011. http://news.brisbanetimes.com.au/breaking-news-business/korean-air-ready-for-787-ramp-up-20100930-15y0k.html

  53. "Boeing's Big Dream". Fortune. May 5, 2008. p. 189.

  54. Kennedy, Bill. "Wheels up", Cutting Tool Engineering, March 2009. Retrieved January 14, 2014. https://archive.today/20130820070734/http://www.ctemag.com/aa_pages/2009/0903_Aerospace.html

  55. "787 Dreamliner International team facts" (Press release). Boeing. Retrieved June 10, 2010. http://www.boeing.com/commercial/787family/dev_team.html

  56. Coulom, Dan (August 20, 2007). "Hamilton Sundstrand delivers first cabin air conditioning packs for Boeing 787 Dreamliner" (press release). Hamilton Sundstrand. Archived from the original on August 28, 2007. Retrieved August 21, 2007. https://web.archive.org/web/20070828032108/http://www.hamiltonsundstrandcorp.com/hsc/news_index/1%2C10392%2CCLI1_DIV22_ETI2807_PID25168%2C00.html

  57. Gates, Dominic (May 15, 2007). "Boeing shares work, but guards its secrets". The Seattle Times. Retrieved September 2, 2011. http://seattletimes.nwsource.com/html/businesstechnology/2003707208_787globalbuild15.html

  58. Norris, G; Thomas, G; Wagner, M; Forbes Smith, C (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 978-0-9752341-2-9. 978-0-9752341-2-9

  59. Moores, Victoria. "Pictures: Boeing begins 787 final assembly". Flight International, May 22, 2007. http://www.flightglobal.com/news/articles/pictures-boeing-begins-787-final-assembly-214060/

  60. "Weight remains challenge for Boeing as 787 progresses". Flightglobal. November 6, 2006. Retrieved May 23, 2015. http://www.flightglobal.com/news/articles/weight-remains-challenge-for-boeing-as-787-progresses-303711/

  61. "Boeing Still Working On 787 Weight Issue, Carson Says". Associated Press. December 7, 2006. Archived from the original on October 12, 2016. Retrieved July 22, 2016. https://web.archive.org/web/20161012141348/http://komonews.com/archive/boeing-chief-787-still-on-schedule

  62. "Boeing to deliver test 787s to its customers". Financial Times. July 6, 2007. Archived from the original on December 10, 2022. https://www.ft.com/cms/608e941e-2beb-11dc-b498-000b5df10621.html

  63. Wallace, James (December 7, 2006). "Virtual rollout of the 78". Seattle Post-Intelligencer. Hearst Communications Inc. Retrieved September 2, 2011. http://www.seattlepi.com/default/article/Virtual-rollout-of-the-787-1221725.php

  64. Dominic Gates (December 23, 2009). "Boeing's 787 Dreamliner is no lightweight". Los Angeles Times. Retrieved January 21, 2013. https://www.latimes.com/archives/la-xpm-2009-dec-23-la-fi-dreamliner23-2009dec23-story.html

  65. Scott, Alwyn (July 24, 2015). "Boeing looks at pricey titanium in bid to stem 787 losses". Reuters. Seattle. Archived from the original on July 27, 2015. Retrieved August 2, 2015. https://www.reuters.com/article/us-boeing-787-titanium-insight-idUSKCN0PY1PL20150724

  66. Johnsson, Julie (February 24, 2015). "Boeing Lining Up Buyers for Early Overweight Dreamliners". Bloomberg. https://www.bloomberg.com/news/articles/2015-02-24/boeing-said-to-line-up-buyers-for-early-overweight-dreamliners

  67. Gates, Dominic (April 20, 2018). "Early 787 test plane is dismantled for reuse, recycling, or scrap". The Seattle Times. Retrieved February 18, 2024. /wiki/Dominic_Gates

  68. "A Boeing 787-9 joins the Terrible Teens". HeraldNet.com. August 28, 2014. Retrieved February 18, 2024. https://www.heraldnet.com/business/a-boeing-787-9-joins-the-terrible-teens/

  69. "Boeing Celebrates the Premiere of the 787 Dreamliner" (Press release). Boeing. July 8, 2007. Retrieved June 14, 2011. http://boeing.mediaroom.com/2007-07-08-Boeing-Celebrates-the-Premiere-of-the-787-Dreamliner

  70. "Boeing Celebrates the Premiere of the 787 Dreamliner" (Press release). Boeing. July 8, 2007. Archived from the original on June 29, 2011. Retrieved January 21, 2011. https://web.archive.org/web/20110629094912/http://www.boeing.com/news/releases/2007/q3/070708b_nr.html

  71. Trimble, Stephen (September 10, 2007). "Boeing 787 first flight suffers two-month delay". Flight International. Retrieved September 2, 2011. http://www.flightglobal.com/articles/2007/09/10/216664/boeing-787-first-flight-suffers-two-month-delay.html

  72. "Boeing Delays 787's First Flight to November–December (Update4)". Bloomberg. September 5, 2007. Retrieved September 3, 2011. https://www.bloomberg.com/apps/news?pid=newsarchive&sid=aUs7S1JX0HuI

  73. Clark, Nicola (October 10, 2007). "Boeing Delays Deliveries of 787". The New York Times. Retrieved December 22, 2007. https://www.nytimes.com/2007/10/10/business/10cnd-boeing.html

  74. "Boeing Reschedules Initial 787 Deliveries and First Flight". Boeing. October 10, 2007. Archived from the original on November 3, 2011. Retrieved September 3, 2011. https://web.archive.org/web/20111103062004/http://www.boeing.com/news/releases/2007/q4/071010d_nr.html

  75. "787 Program Chief Replaced at Boeing". The New York Times. Associated Press. October 17, 2007. Retrieved November 24, 2007. https://www.nytimes.com/2007/10/17/business/17boeing.html

  76. "Boeing Shifts Schedule for 787 First Flight" (Press release). Boeing. January 16, 2008. Archived from the original on January 19, 2008. https://web.archive.org/web/20080119140122/http://www.boeing.com/news/releases/2008/q1/080116a_nr.html

  77. Sanders, Peter (July 8, 2009). "Boeing Sets Deal to Buy a Dreamliner Plant". The Wall Street Journal. https://www.wsj.com/articles/SB124696971307105465

  78. Trimble, Stephen (April 11, 2008). "787 variants delayed to at least 2012". Flight International. Archived from the original on October 15, 2008. https://web.archive.org/web/20081015200341/http://www.flightglobal.com/articles/2008/04/11/222930/787-variants-delayed-to-at-least-2012.html

  79. Gates, Dominic (November 5, 2008). "Fasteners incorrectly installed". The Seattle Times. Retrieved November 11, 2008. http://seattletimes.nwsource.com/html/businesstechnology/2008351743_boeing05.html

  80. "Boeing says 787 test flight delayed again". CNN. November 4, 2008. Archived from the original on November 8, 2008. https://web.archive.org/web/20081108074053/http://edition.cnn.com/2008/BUSINESS/11/04/boeing.strike.ap/index.html

  81. "Boeing Reviews Dreamliner Schedule for More Delays (Update2)". Bloomberg. December 4, 2008. Retrieved September 2, 2011. https://www.bloomberg.com/apps/news?pid=newsarchive&sid=aSpIiLLg_Uj8

  82. "Boeing confirms 787 first flight pushed back to 2Q 2009". Flight International. December 11, 2008. Retrieved December 14, 2010. http://www.flightglobal.com/articles/2008/12/11/320030/boeing-confirms-787-first-flight-pushed-back-to-2q-2009.html

  83. "United may seek damages for 787 delays". PSBJ. February 27, 2012. Retrieved March 14, 2012. http://www.bizjournals.com/seattle/morning_call/2012/02/united-may-seek-damages-for-787-delays.html

  84. "Govt approves Air India compensation package for Dreamliner delay". July 25, 2012. Retrieved July 25, 2012. http://profit.ndtv.com/news/corporates/article-govt-approves-air-india-compensation-package-for-dreamliner-delay-308387

  85. Kotha, Suresh (2013). Managing A Global Partnership Model: Lessons from the Boeing 787 'Dreamliner' Program. HOBOKEN: Blackwell Publishing Ltd. pp. 41–66.{{cite book}}: CS1 maint: publisher location (link) /wiki/Template:Cite_book

  86. "Boeing performs crash test on 787 fuselage section". Komo News. August 23, 2007. Retrieved July 22, 2016. http://komonews.com/archive/boeing-performs-crash-test-on-787-fuselage-section

  87. Snyder, Sean, ed. (August 29, 2007). "Boeing Performs Crash Test on 787 Dreamliner: Tests currently under analysis". Design News. Reed Elsevier. Archived from the original on December 17, 2011. Retrieved September 9, 2011. https://web.archive.org/web/20111217215108/http://www.designnews.com/document.asp?doc_id=216921

  88. Gillespie, Elizabeth M (September 6, 2007). "Boeing Says 787 Fuselage Test a Success". Forbes. Retrieved September 7, 2007. [dead link] Alt URL https://www.forbes.com/feeds/ap/2007/09/06/ap4091000.html

  89. Snyder, Sean, ed. (September 6, 2007). "Announcement of Boeing Fuselage Crash Test Results". Design News. Archived from the original on December 17, 2011. Retrieved September 9, 2011. https://web.archive.org/web/20111217215519/http://www.designnews.com/document.asp?doc_id=225409

  90. Gates, Dominic (September 18, 2007). "Fired engineer calls 787's plastic fuselage unsafe". The Seattle Times. Retrieved November 24, 2007. http://seattletimes.nwsource.com/html/boeingaerospace/2003889663_boeing180.html

  91. Matlack, Carol (June 26, 2009). "More Boeing 787 Woes as Qantas Drops Order". Bloomberg BusinessWeek. Bloomberg. Archived from the original on June 29, 2009. Retrieved December 14, 2010. https://web.archive.org/web/20090629051805/http://www.businessweek.com/globalbiz/content/jun2009/gb20090626_089756.htm

  92. Snyder, Sean, ed. (August 29, 2007). "Boeing Performs Crash Test on 787 Dreamliner: Tests currently under analysis". Design News. Reed Elsevier. Archived from the original on December 17, 2011. Retrieved September 9, 2011. https://web.archive.org/web/20111217215108/http://www.designnews.com/document.asp?doc_id=216921

  93. Gates, Dominic. (September 18, 2007) "Boeing news |Fired engineer calls 787's plastic fuselage unsafe". The Seattle Times. Retrieved March 13, 2014. http://seattletimes.com/html/boeingaerospace/2003889663_boeing180.html

  94. "European and US regulators certify Trent 1000 for Boeing 787". Flight International. Retrieved December 14, 2010. http://www.flightglobal.com/articles/2007/08/07/215951/european-and-us-regulators-certify-trent-1000-for-boeing-787.html

  95. "GEnx-1B Engine Receives FAA Certification" (press release). GE Aviation. March 31, 2008. Archived from the original on April 5, 2008. Retrieved April 4, 2008. https://web.archive.org/web/20080405223719/http://www.geae.com/aboutgeae/presscenter/genx/genx_20080331.html

  96. "PowerOn Interactive Site". TPN interactive. Archived from the original on July 27, 2011. Retrieved December 14, 2010. https://web.archive.org/web/20110727220342/http://poweron.tpninteractive.com/

  97. "Boeing Completes 787 Dreamliner 'High Blow' Test" (Press release). Boeing. September 27, 2008. Retrieved September 2, 2011. http://www.boeing.com/news/releases/2008/q3/080927a_nr.html

  98. "FAA Approves Boeing 787 Dreamliner Maintenance Program" (Press release). Boeing. December 22, 2008. Retrieved September 2, 2011. http://www.boeing.com/news/releases/2008/q4/081222b_nr.html

  99. "Boeing 787 Dreamliner Moves to Flight Line for Testing" (Press release). Boeing. May 3, 2009. Archived from the original on May 5, 2009. Retrieved May 3, 2009. https://web.archive.org/web/20090505154141/http://www.boeing.com/news/releases/2009/q2/090503a_nr.html

  100. "Bernstein Research sees further 787 delays, bigger range shortfall". ATW Daily News. May 4, 2009. Retrieved September 9, 2011. http://atwonline.com/aircraftenginescomponents/news/bernstein-research-sees-further-787-delays-bigger-range-shortfall-03-0

  101. Ostrower, Jon. "Boeing confirms 787 weight issues". Flight International, May 7, 2009. Retrieved September 2, 2011. http://www.flightglobal.com/articles/2009/05/07/326087/boeing-confirms-787-weight-issues.html

  102. Ostrower, Jon. "Concerns raised over expected 787 range shortfall". Flight International, March 9, 2009. Retrieved September 2, 2011. http://www.flightglobal.com/articles/2009/03/09/323414/concerns-raised-over-expected-787-range-shortfall.html

  103. Ostrower, Jon. "Shanghai casts doubt over early 787 delivery slots". Flight International, March 14, 2009. Retrieved September 2, 2011. http://www.flightglobal.com/articles/2009/03/14/323853/shanghai-casts-doubt-over-early-787-delivery-slots.html

  104. "Boeing Postpones 787 First Flight" (Press release). Boeing. June 23, 2009. http://boeing.mediaroom.com/index.php?s=43&item=720

  105. "Dreamliner 787 Composites Approach Takes Another Big Hit". Design News. September 10, 2009. Archived from the original on September 24, 2009. Retrieved September 11, 2009. https://web.archive.org/web/20090924190951/http://www.designnews.com/blog/Engineering_Materials/22707-Dreamliner_787_Composites_Approach_Takes_Another_Big_Hit.php

  106. "Boeing Announces New 787 Schedule and Third-Quarter Charge" (Press release). Boeing. August 27, 2009. http://boeing.mediaroom.com/index.php?s=43&item=812

  107. Gates, Dominic (August 28, 2009). "Boeing still sure delayed 787 will be profitable". The Seattle Times. Retrieved September 23, 2009. http://seattletimes.nwsource.com/html/boeingaerospace/2009760894_boeingdelay28.html

  108. Cohen, Aubrey (April 20, 2011). "Boeing illegally put second 787 line in S.C., complaint says". Seattle Post-Intelligencer. http://www.seattlepi.com/default/article/Boeing-illegally-put-second-787-line-in-S-C-1345345.php

  109. "Boeing Completes 787 Dreamliner High-Speed Taxi Test" (Press release). Boeing. December 12, 2009. Retrieved September 3, 2011. http://boeing.mediaroom.com/index.php?s=43&item=991

  110. "787 approaches final gauntlet testing". Flight International. December 8, 2009. Retrieved December 15, 2009. http://www.flightglobal.com/articles/2009/12/08/335914/787-approaches-final-gauntlet-testing.html

  111. "Boeing 787 Dreamliner Completes First Flight" (Press release). Boeing. December 15, 2009. http://boeing.mediaroom.com/2009-12-15-Boeing-787-Dreamliner-Completes-First-Flight

  112. Dominic Gates (December 16, 2009). "Rain shortens 787 first flight, fails to dampen optimism". The Seattle Times. Archived from the original on November 19, 2018. Retrieved June 8, 2017. https://web.archive.org/web/20181119092158/http://old.seattletimes.com/html/boeingaerospace/2010517316_787firstflight16.html

  113. Jon Ostrower (December 22, 2009). "787 first flight is just the start for gruelling programme". Flight International. https://www.flightglobal.com/news/articles/787-first-flight-is-just-the-start-for-gruelling-pro-336319/

  114. "Boeing Commercial Airplane Group No.2". FlightAware. December 22, 2009. http://flightaware.com/live/flight/BOE2/history/20091222/1710Z/KPAE/KBFI

  115. "Second Boeing 787 Dreamliner Completes First Flight". Boeing, December 22, 2009. Retrieved September 2011. http://boeing.mediaroom.com/index.php?s=43&item=1010

  116. "787 Dreamliner Flight Test site". Boeing. Retrieved August 15, 2011. http://787flighttest.com

  117. Ostrower, Jon. "Boeing completes 787 flutter and ground effects testing". Flight International, March 24, 2010. Retrieved September 3, 2011. http://www.flightglobal.com/articles/2010/03/24/339861/boeing-completes-787-flutter-and-ground-effects-testing.html

  118. "Boeing Completes Ultimate-Load Wing Test on 787" (Press release). Boeing. March 28, 2010. Archived from the original on April 7, 2012. Retrieved March 30, 2010. https://web.archive.org/web/20120407055438/http://boeing.mediaroom.com/index.php?s=43&item=1138%2F

  119. Sanders, Peter (March 30, 2010). "Boeing's Dreamliner Lags Testing Schedule". The Wall Street Journal. Retrieved September 2, 2011. https://www.wsj.com/articles/SB10001424052702303410404575152123922009294

  120. Paur, Jason (March 29, 2010). "Boeing 787 Passes Incredible Wing Flex Test". Wired. https://www.wired.com/autopia/2010/03/boeing-787-passes-incredible-wing-flex-test/

  121. "Boeing Confirms Success on 787 Wing, Fuselage Ultimate Load Test" (Press release). Boeing. April 7, 2010. http://boeing.mediaroom.com/index.php?s=43&item=1151

  122. "Boeing 787 in hot/cold testing in Florida". UPI, April 23, 2010. Retrieved September 3, 2011. http://www.upi.com/Business_News/Security-Industry/2010/04/23/Boeing-787-in-hotcold-testing-in-Florida/UPI-83021272046892/

  123. "First 787 GEnx Engine Runs Complete". Boeing, May 12, 2010. http://787flighttest.com/2010/05/

  124. "VIDEO: GEnx powered 787 completes maiden flight". Flight International. Retrieved July 21, 2010. http://www.flightglobal.com/articles/2010/06/17/343366/video-genx-powered-787-completes-maiden-flight.html

  125. "Horizontal stabiliser gaps force 787 inspections and reduced flight envelope". Flight International. June 25, 2010. Retrieved June 26, 2010. http://www.flightglobal.com/articles/2010/06/25/343682/horizontal-stabiliser-gaps-force-787-inspections-and-reduced-flight.html

  126. Jason Paur (June 17, 2010). "Boeing 787 Withstands Lightning Strike". Wired. https://www.wired.com/autopia/2010/06/boeing-787-withstands-lightning-strike/

  127. Gates, Dominic (September 18, 2007). "Fired engineer calls 787's plastic fuselage unsafe". The Seattle Times. Retrieved November 24, 2007. http://seattletimes.nwsource.com/html/boeingaerospace/2003889663_boeing180.html

  128. "FAA Probes American's Inspections". The Wall Street Journal, May 16, 2008, p. B1.

  129. Gates, Dominic. "Building the 787, When lightning strikes". The Seattle Times, March 5, 2006. Retrieved September 3, 2011. http://seattletimes.nwsource.com/html/businesstechnology/2002844619_boeing05.html

  130. Gates, Dominic (February 8, 2009). "FAA to loosen fuel-tank safety rules, benefiting Boeing's 787". The Seattle Times. Retrieved September 2, 2011. http://seattletimes.nwsource.com/html/boeingaerospace/2008719843_lightning08.html

  131. "FAA engineers objected to Boeing's removal of some 787 lightning protection measures". The Seattle Times. December 2019. Retrieved January 5, 2020. https://www.seattletimes.com/business/boeing-aerospace/faa-engineers-objected-to-boeings-removal-of-some-787-lightning-protection-measures

  132. "Boeing discarded 787 lightning protection, despite FAA objections". Aerotime Hub. December 11, 2019. Archived from the original on September 15, 2020. Retrieved February 9, 2020. https://web.archive.org/web/20200915184120/https://www.aerotime.aero/rytis.beresnevicius/24324-boeing-787-lightning-protection-faa-objection

  133. "Dreamliner lands at Farnborough". BBC News, July 18, 2010. Retrieved July 18, 2010. https://www.bbc.co.uk/news/business-10676791

  134. Mustoe, Howard (August 24, 2010). "Rolls-Royce Blowout Shutters Boeing, Airbus Test Bed". Bloomberg. Archived from the original on January 18, 2013. Retrieved August 29, 2010. https://archive.today/20130118124821/http://noir.bloomberg.com/apps/news?pid=newsarchive&sid=ae3AMBTC3nlg

  135. "Boeing delays delivery of 787 aircraft until next year". BBC. August 27, 2010. Retrieved August 27, 2010. https://www.bbc.co.uk/news/business-11106378

  136. Ostrower, Jon (August 28, 2010). "Lack of production engine for Airplane Nine drives 787 delay". Flight International. Retrieved August 29, 2010. http://www.flightglobal.com/articles/2010/08/28/346766/lack-of-production-engine-for-airplane-nine-drives-787.html

  137. "Boeing faces claim on 787 delays; sixth flight test aircraft won't fly until September". ATW Online. August 16, 2010. Retrieved August 16, 2010. http://atwonline.com/aircraft-engines-components/news/boeing-faces-claim-787-delays-sixth-flight-test-aircraft-wont-fly-u

  138. "787 flight test fleet to expand". ATW Online. September 10, 2010. Retrieved September 9, 2010. http://atwonline.com/aircraft-engines-components/news/787-flight-test-fleet-expand-0902

  139. Norris, Guy (September 16, 2010). "Boeing 787 Suffers Engine Surge During Tests; Deliveries May Slip Again". Aviation Week. http://aviationweek.com/awin/boeing-787-suffers-engine-surge-during-flight-tests-deliveries-may-slip-again

  140. "Sixth Boeing 787 Makes First Flight, Testing Program Making Good Progress". Boeing, October 4, 2010. http://boeing.mediaroom.com/index.php?s=43&item=1455

  141. Gates, Dominic (November 9, 2010). "Electrical fire forces emergency landing of 787 test plane". The Seattle Times. Retrieved November 9, 2010. http://seattletimes.nwsource.com/html/businesstechnology/2013387936_787emergency10.html

  142. "Boeing 787 Makes Emergency Landing On Test Flight". NPR. Associated Press. November 9, 2010. Archived from the original on November 14, 2010. Retrieved November 9, 2010. https://web.archive.org/web/20101114032902/http://www.npr.org/templates/story/story.php?storyId=131204675

  143. "787 electrical fire raises prospect of further delay". Flightglobal. November 15, 2010. Retrieved November 15, 2010. http://www.flightglobal.com/articles/2010/11/15/349637/787-electrical-fire-raises-prospect-of-further-delay.html

  144. Norris, Guy. "787s Grounded After Emergency Landing". Aviation Week, November 10, 2010. Retrieved June 14, 2011.

  145. Norris, Guy (November 11, 2010). "787s Remain Grounded As Investigation Continues". Aviation Week. http://aviationweek.com/awin/787s-remain-grounded-investigation-continues

  146. Rothman, Andrea. "Boeing 787 Fire Sparked by Stray Tool". Bloomberg, November 25, 2010. https://www.bloomberg.com/news/2010-11-22/boeing-787-fire-sparked-by-stray-tool-la-tribune-says.html

  147. Ostrower, Jon. "787 flight tests resume, final schedule unclear". Air Transport Intelligence, December 23, 2010. Retrieved September 2, 2011. http://www.flightglobal.com/articles/2010/12/23/351332/787-flight-tests-resume-final-schedule-unclear.html

  148. "Boeing Resumes 787 Flight Testing". Boeing, December 23, 2010. http://boeing.mediaroom.com/index.php?s=43&item=1571

  149. "Boeing faces prospect of further 787 delay". Flight International. November 5, 2010. Retrieved November 6, 2010. http://www.flightglobal.com/articles/2010/11/05/349334/boeing-faces-prospect-of-further-787-delay.html

  150. "JAL hit by further 787 delivery delay". Air Transport Intelligence. November 4, 2010. Retrieved November 6, 2010. http://www.flightglobal.com/articles/2010/11/04/349310/jal-hit-by-further-787-delivery-delay.html

  151. "Boeing Sets 787 First Delivery for Third Quarter" (Press release). Boeing. January 18, 2011. Retrieved September 2, 2011. http://boeing.mediaroom.com/index.php?s=43&item=1584

  152. "Boeing expects first 787 delivery in the third quarter". Flight International. January 18, 2011. http://www.flightglobal.com/articles/2011/01/18/351976/boeing-expects-first-787-delivery-in-the-third-quarter.html

  153. Ostrower, Jon (February 24, 2011). "Boeing passes 1,000 787 flights". Air Transport Intelligence. Retrieved September 2, 2011. http://www.flightglobal.com/articles/2011/02/24/353640/picture-boeing-passes-1000-787-flights.html

  154. Koh, Quintella (July 4, 2011). "All Nippon Airways starts week-long 787 validation". Air Transport Intelligence. Retrieved July 6, 2011. http://www.flightglobal.com/articles/2011/07/04/359077/all-nippon-airways-starts-week-long-787-validation.html

  155. "787 Dreamliner Flight Test site". Boeing. Retrieved August 15, 2011. http://787flighttest.com

  156. Ostrower, Jon (August 15, 2011). "Certification flight testing complete, the 787 fleet is still busy". Flightblogger on Flightglobal.com. Archived from the original on December 21, 2011. https://web.archive.org/web/20111221105122/http://www.flightglobal.com/blogs/flightblogger/2011/08/certification-flight-testing-c.html

  157. Ostrower, Jon. "Boeing confirms 787 certification flight test completion". Air Transport Intelligence, August 17, 2011. Retrieved September 2, 2011. http://www.flightglobal.com/articles/2011/08/17/360898/boeing-confirms-787-certification-flight-test-completion.html

  158. "787 wins certification from FAA and EASA". Air Transport Intelligence. August 26, 2011. Retrieved August 26, 2011. http://www.flightglobal.com/articles/2011/08/26/361346/787-wins-certification-from-faa-and-easa.html

  159. "FAA Approves Production of Boeing 787 Dreamliner" (press release). FAA. August 26, 2011. Archived from the original on September 8, 2011. Retrieved August 29, 2011. https://web.archive.org/web/20110908035536/http://www.faa.gov/news/press_releases/news_story.cfm?newsId=13064

  160. "FAA Approves Production of Boeing 787 Dreamliner" (press release). FAA. August 26, 2011. Archived from the original on September 8, 2011. Retrieved August 29, 2011. https://web.archive.org/web/20110908035536/http://www.faa.gov/news/press_releases/news_story.cfm?newsId=13064

  161. Cohen, Aubrey (April 20, 2011). "Boeing illegally put second 787 line in S.C., complaint says". Seattle Post-Intelligencer. http://www.seattlepi.com/default/article/Boeing-illegally-put-second-787-line-in-S-C-1345345.php

  162. Hananel, Sam (December 9, 2011). "Labor board drops high-profile Boeing complaint". Boston Globe. Associated Press. https://www.boston.com/business/articles/2011/12/09/labor_board_withdraws_boeing_complaint/

  163. Peterson, Kyle (April 27, 2012). "Boeing Debuts First 787 Dreamliner in South Carolina". Reuters. Archived from the original on May 2, 2012. Retrieved June 30, 2017. https://www.reuters.com/article/us-boeing-idUSBRE83Q15Q20120427

  164. Ostrower, Jon (September 25, 2011). "Boeing formally delivers first 787 to ANA". Flight International. http://www.flightglobal.com/news/articles/boeing-formally-delivers-first-787-to-ana-362515

  165. "Boeing, ANA Complete Contractual Delivery of First 787 Dreamliner" (Press release). Boeing. September 25, 2011. http://boeing.mediaroom.com/2011-09-25-Boeing-ANA-Complete-Contractual-Delivery-of-First-787-Dreamliner

  166. Tim Hepher (September 27, 2011). "First delivered Boeing 787 takes off for Japan". Reuters. Archived from the original on September 27, 2011. Retrieved June 30, 2017. https://www.reuters.com/article/us-boeing-idUSTRE78Q2O220110927

  167. "Boeing delivers first 787". Associated Press. September 26, 2011. http://www.cbc.ca/news/business/boeing-delivers-first-787-1.1112430

  168. "Boeing delivers its second 787 and jumbo freighter". The Seattle Times. October 13, 2011. http://www.seattletimes.com/business/boeing-delivers-its-second-787-and-jumbo-freighter/

  169. Tim Kelly (October 26, 2011). "Dreamliner carries its first passengers and Boeing's hopes". Reuters. Archived from the original on October 27, 2011. Retrieved June 30, 2017. https://www.reuters.com/article/us-dreamliner-idUSTRE79P02Q20111026

  170. "Boeing's Dreamliner completes first commercial flight". BBC News. October 26, 2011. https://www.bbc.co.uk/news/business-15456914

  171. "ANA launches first long-haul service to Europe on 787 Dreamliner" (PDF) (Press release). ANA. October 5, 2011. http://www.ana.co.jp/wws/us/e/local/about_ana/corp_info/pr/2011/pdf/111005.pdf

  172. Hamilton, Scott (June 16, 2022). "FAA adopts ICAO 2027 emissions, noise rules; death knell for new production 767F, 777F". Leeham News and Analysis. Retrieved February 26, 2024. https://leehamnews.com/2022/06/16/faa-adopts-icao-2027-emissions-noise-rules-death-knell-for-new-production-767f-777f/

  173. Hamilton, Scott (September 20, 2022). "Boeing shows FedEx concepts for 787F and NMA-F". Leeham News and Analysis. Retrieved May 8, 2024. https://leehamnews.com/2022/09/20/boeing-shows-fedex-concepts-for-787f-and-nma-f/

  174. Kulisch, Eric (September 16, 2022). "Boeing CEO says 787 freighter is frontrunner to succeed 767F". Freight Waves. Retrieved May 8, 2024. https://www.freightwaves.com/news/boeing-ceo-reveals-787-freighter-as-front-runner-to-succeed-767f

  175. Ostrower, Jon; Guisbond, Will (May 7, 2024). "Congress poised to give Boeing five more years to build 767 freighters". The Air Current. Retrieved May 8, 2024. https://theaircurrent.com/aircraft-development/767-787-freighter-faa-reauthorization/

  176. "Boeing 787-3 Dreamliner Fact Sheet". Boeing. Archived from the original on November 19, 2007. Retrieved November 23, 2007. https://web.archive.org/web/20071119171849/http://www.boeing.com/commercial/787family/787-3prod.html

  177. Trimble, Stephen (April 11, 2008). "787 variants delayed to at least 2012". Flight International. Archived from the original on October 15, 2008. https://web.archive.org/web/20081015200341/http://www.flightglobal.com/articles/2008/04/11/222930/787-variants-delayed-to-at-least-2012.html

  178. Rich Breuhaus (May 20, 2008). "787 Dreamliner: A New Airplane for a New World" (PDF). ACI-NA Commissioners Conference. Boeing. Archived from the original (PDF) on March 7, 2017. Retrieved March 6, 2017. https://web.archive.org/web/20170307045010/http://www.aci-na.org/static/entransit/Gen.%20Rich%20Breuhaus.pdf

  179. Norris & Wagner 2009, p. 38. - Norris, Guy; Wagner, Mark (2009). Boeing 787 Dreamliner. Minneapolis: Zenith Press. ISBN 978-0-7603-2815-6.

  180. Jon Ostrower (January 8, 2010). "ANA abandons 787-3". Flight International. http://www.flightglobal.com/news/articles/ana-abandons-787-3-336950/

  181. "Boeing will likely scrap 787-3". The Seattle Times. February 2, 2010. http://seattletimes.nwsource.com/html/businesstechnology/2010963351_boeingbloom03.html

  182. "SINGAPORE 2010: 757 replacement gets new focus as 787-3 dwindles". Flightglobal. February 3, 2010. https://www.flightglobal.com/news/articles/singapore-2010-757-replacement-gets-new-focus-as-787-3-337996/

  183. Susanna Ray (December 13, 2010). "Boeing raises aircraft prices 5.2%, cancels short-haul 787". The Seattle Times. http://seattletimes.nwsource.com/html/boeingaerospace/2013672244_boeingprices14.html

  184. Gates, Dominic (September 24, 2011). "Boeing celebrates 787 delivery as program's costs top $32 billion". The Seattle Times. Retrieved September 26, 2011. /wiki/Dominic_Gates

  185. "The eye of the storm". The Economist. May 14, 2016. ISSN 0013-0613. https://www.economist.com/news/business/21698706-building-new-plane-take-airbus-would-be-huge-risk-boeing-eye-storm

  186. Jonathan R. Laing (April 27, 2013). "Will Boeing's Battery Fix Fly?". Barron's. http://online.barrons.com/articles/SB50001424052748703889404578439060025345082

  187. Ostrower, Jon (June 10, 2014). "Boeing's Key Mission: Cut Dreamliner Cost". The Wall Street Journal. p. B1. Retrieved June 10, 2014. https://www.wsj.com/news/articles/SB10001424052702304361604579292333739357034

  188. Trimble, Stephen (April 22, 2015). "Boeing 787 unit loss declines, but deferred costs rise". Flightglobal. http://www.flightglobal.com/news/articles/boeing-787-unit-loss-declines-but-deferred-costs-rise-411502/

  189. Jon Ostrower (May 4, 2015). "Boeing Pursues Fresh Deal With Spirit AeroSystems". The Wall Street Journal. https://www.wsj.com/articles/boeing-pursues-fresh-deal-with-spirit-aerosystems-1430779586

  190. Dominic Gates (October 17, 2015). "Will 787 program ever show an overall profit? Analysts grow more skeptical". Seattle Times. https://www.seattletimes.com/business/boeing-aerospace/will-787-program-ever-show-an-overall-profit-analysts-grow-more-skeptical/

  191. Dominic Gates (October 17, 2015). "Will 787 program ever show an overall profit? Analysts grow more skeptical". Seattle Times. https://www.seattletimes.com/business/boeing-aerospace/will-787-program-ever-show-an-overall-profit-analysts-grow-more-skeptical/

  192. Walker, Karen (July 21, 2016). "Boeing 787 financial hit underscores cost of launching a new airliner". Air Transport World. http://atwonline.com/blog/boeing-787-financial-hit-underscores-cost-launching-new-airliner

  193. James Albaugh (December 4, 2017). "Opinion: Jim Albaugh's Lessons Of Aerospace Success". Aviation Week & Space Technology. /wiki/James_Albaugh

  194. Trimble, Stephen (September 13, 2017). "Boeing commits to next production-rate increase for 787". Flightglobal. https://www.flightglobal.com/news/articles/boeing-commits-to-next-production-rate-increase-for-441119/

  195. "About Boeing Commercial Airplanes: Prices". Boeing. http://www.boeing.com/company/about-bca/#/prices

  196. Aircraft Value News (June 11, 2018). "Intense A330/B787 Competition Could Impact Values". http://www.aircraftvaluenews.com/intense-a330b787-competition-could-impact-values/

  197. "Boeing displaces Airbus at Hawaiian, wins 787-9 deal; airline cancels A330-800 order". Leeham. February 20, 2018. https://leehamnews.com/2018/02/20/boeing-displaces-airbus-hawaiian-wins-787-9-deal-airline-cancels-a330-800-order/

  198. Guy Norris; Jens Flottau; Bradley Perrett (December 17, 2018). "Boeing And Airbus Hope To Leave Production Glitches Behind In 2019". Aviation Week & Space Technology. http://aviationweek.com/aerospace-2018/boeing-and-airbus-hope-leave-production-glitches-behind-2019

  199. Ostrower, Jon (June 10, 2014). "Boeing's Key Mission: Cut Dreamliner Cost". The Wall Street Journal. p. B1. Retrieved June 10, 2014. https://www.wsj.com/news/articles/SB10001424052702304361604579292333739357034

  200. Bjorn Fehrm (April 23, 2015). "Bjorn's Corner: Boeing's 787 and Airbus' 350 programs, a snapshot". Leeham News and Comment. http://leehamnews.com/2015/04/23/bjorns-corner-boeings-787-and-airbus-350-program-snapshot/

  201. "Boeing to cut 787 production rate, cites global trade environment". Leeham News. October 23, 2019. https://leehamnews.com/2019/10/23/boeing-to-cut-787-production-rate-cites-global-trade-environment/

  202. Julie Johnsson and Siddharth Vikram Philip (January 24, 2020). "Boeing Mulls Another Cut to 787 Output in New Threat to Cash". Bloomberg. https://www.bloomberg.com/news/articles/2020-01-24/boeing-weighs-another-cut-to-787-output-in-new-threat-to-cash

  203. "Boeing to Consolidate 787 Production in South Carolina in 2021" (Press release). Boeing. October 1, 2020. https://boeing.mediaroom.com/2020-10-01-Boeing-to-Consolidate-787-Production-in-South-Carolina-in-2021

  204. Scott Hamilton (December 4, 2020). "Boeing further trims 787 production; now sees 5/mo in 2021". Leeham News. https://leehamnews.com/2020/12/04/boeing-further-trims-787-production-now-sees-5-mo-in-2021/

  205. Kiersz, Andy (April 21, 2019). "'I never plan to fly on it': Workers reportedly recount poor practices at a Boeing factory in South Carolina that could spell trouble for Dreamliner plane". New York: Axel Springer SE. Retrieved July 16, 2021. https://www.businessinsider.com/boeing-787-dreamliner-south-carolina-factory-production-problems-2019-4

  206. Kitroeff, Natalie; Gelles, David (April 20, 2019). "Claims of Shoddy Production Draw Scrutiny to a Second Boeing Jet". The New York Times. Charleston. https://www.nytimes.com/2019/04/20/business/boeing-dreamliner-production-problems.html

  207. Slotnick, David (August 5, 2019). "Airlines flying Boeing's 787-10 Dreamliner are complaining about quality they say is 'way below acceptable standards'". Business Insider. New York: Axel Springer SE. Retrieved July 16, 2021. https://www.businessinsider.com/boeing-787-dreamliner-airline-complaints-quality-production-2019-8

  208. Tangel, Andrew; Pasztor, Andy (September 7, 2020). "Production Problems Spur Broad FAA Review of Boeing Dreamliner Lapses". The Wall Street Journal. Charleston: Dow Jones & Company. ISSN 0099-9660. Retrieved September 7, 2020. https://www.wsj.com/articles/production-problems-prompt-broad-faa-review-of-boeing-dreamliner-lapses-11599498118

  209. Ostrower, Jon (August 27, 2020). "Boeing pulls eight 787s from service over structural issue". Air Current. Retrieved September 7, 2020. https://theaircurrent.com/aviation-safety/boeing-pulls-eight-787s-from-service-over-structural-issue/

  210. Tangel, Andrew; Pasztor, Andy (September 7, 2020). "Production Problems Spur Broad FAA Review of Boeing Dreamliner Lapses". The Wall Street Journal. Charleston: Dow Jones & Company. ISSN 0099-9660. Retrieved September 7, 2020. https://www.wsj.com/articles/production-problems-prompt-broad-faa-review-of-boeing-dreamliner-lapses-11599498118

  211. Ostrower, Jon (September 8, 2020). "Scarce quality data on 787 skins as FAA peels back onion on Boeing". Air Current. Retrieved September 8, 2020. https://theaircurrent.com/aviation-safety/scarce-data-on-787-quality-as-faa-peels-back-onion-on-boeing/

  212. Shepardson, David (September 10, 2020). "Boeing in talks with FAA about new reported 787 production issue". Reuters. Seattle. Retrieved September 10, 2020. https://www.reuters.com/article/us-boeing-787/boeing-in-talks-with-faa-about-new-reported-787-production-issue-idUSKBN26200P

  213. Harger, Charlie (September 10, 2020). "Report raises new questions about structural integrity of Boeing 787 Dreamliner". KOMO News. Retrieved September 10, 2020. https://komonews.com/news/local/report-raises-new-questions-about-structural-integrity-of-boeing-787-dreamliner

  214. Cameron, Doug; Pasztor, Andy (September 8, 2020). "Boeing Flags Additional 787 Production Problem". The Wall Street Journal. Salt Lake City: Dow Jones & Company. Retrieved September 8, 2020. https://www.wsj.com/articles/boeing-flags-additional-787-production-problem-11599577936

  215. Jon Hemmerdinger (January 28, 2021). "Boeing to resume 787 deliveries no sooner than February". FlightGlobal. DVV Media Group. Retrieved February 22, 2021. https://www.flightglobal.com/airframers/boeing-to-resume-787-deliveries-no-sooner-than-february/142159.article

  216. Tangel, Andrew (March 18, 2021). "Boeing Faces New Hurdle in Delivering Dreamliners". The Wall Street Journal. Washington, D.C.: Dow Jones & Company. ISSN 0099-9660. Retrieved March 18, 2021. https://www.wsj.com/articles/boeing-faces-new-hurdle-in-delivering-dreamliners-11616018860

  217. Johnsson, Julie; Bachman, Justin (March 26, 2021). "Boeing Delivers First 787 in Months as Inspections Continue". New York: Bloomberg L.P. Bloomberg News. Retrieved April 2, 2021. https://www.bloomberg.com/news/articles/2021-03-26/boeing-delivers-first-787-since-october-as-inspections-continue

  218. Gates, Dominic (October 12, 2021). "As orders trickle in, Boeing ramps up 737 MAX but 787 deliveries are still blocked". The Seattle Times. Seattle. https://www.seattletimes.com/business/boeing-aerospace/as-orders-trickle-in-boeing-ramps-up-737-max-but-787-deliveries-are-still-blocked/

  219. Tangel, Andrew (September 6, 2021). "Boeing's Delivery of New 787 Dreamliners Likely Delayed Until at Least Late October". Wall Street Journal. Chicago: Dow Jones & Company. https://www.wsj.com/articles/boeings-delivery-of-new-787-dreamliners-likely-delayed-until-at-least-late-october-11630783728

  220. Josephs, Leslie (October 27, 2021). "Boeing posts loss as Dreamliner flaws drive up costs, but airplane sales rise". CNBC. Chicago: NBCUniversal News Group. https://www.cnbc.com/2021/10/27/boeing-ba-3q-2021-earnings-report-cut-to-dreamliner-production.html

  221. Jones, Callum (July 14, 2021). "Boeing cuts 787 production after structural fault found". The Times of London. Chicago. https://www.thetimes.com/business-money/companies/article/boeing-cuts-787-production-after-structural-fault-found-n65x56ggf

  222. Isidore, Chris (July 13, 2021). "Boeing discloses a new problem with the 787 Dreamliner". CNN Business. CNN. New York: Warner Bros. Discovery. https://www.cnn.com/2021/07/13/business/boeing-787-dreamliner-faa/index.html

  223. "Boeing's Delivery of New 787 Dreamliners Likely Delayed Until at Least Late October". The Wall Street Journal. September 4, 2021. https://www.wsj.com/articles/boeings-delivery-of-new-787-dreamliners-likely-delayed-until-at-least-late-october-11630783728

  224. Gates, Dominic (November 19, 2021). "FAA memo reveals more Boeing 787 manufacturing defects, including contamination of carbon fiber composites". The Seattle Times. Seattle. https://www.seattletimes.com/business/boeing-aerospace/faa-memo-reveals-more-boeing-787-manufacturing-defects-including-contamination-of-carbon-fiber-composites/

  225. Johnsson, Julie; Levin, Alan (November 20, 2021). "Boeing Buyers' Ire Builds as 787 Disruptions Pass 13-Month Mark". New York: Bloomberg L.P. Bloomberg News. Retrieved February 26, 2022. https://www.bloomberg.com/news/articles/2021-11-20/boeing-buyers-ire-builds-as-787-disruptions-pass-13-month-mark

  226. "U.S. House panel wants answers on Boeing 787". Yahoo News. Reuters. November 19, 2021 – via Yahoo! News UK. https://uk.news.yahoo.com/u-house-panel-wants-answers-211418557.html

  227. Nall, Marissa (December 13, 2021). "Region's Boeing 787 suppliers could see production delays into spring". Puget Sound Business Journal. Seattle: American City Business Journals. https://www.bizjournals.com/seattle/news/2021/12/12/dreamliner-slowdown-to-extend-into-april.html

  228. Hemmerdinger, Jon (February 15, 2022). "FAA to issue 787 airworthiness certificates, taking authority from Boeing". FlightGlobal. DVV Media GROUP. https://www.flightglobal.com/airframers/faa-to-issue-787-airworthiness-certificates-taking-authority-from-boeing/147537.article

  229. "Exclusive-Boeing tests suppliers on 787 output hikes -sources". MarketScreener.com. March 11, 2022. Retrieved April 20, 2022. https://m.marketscreener.com/news/latest/Exclusive-Boeing-tests-suppliers-on-787-output-hikes-sources--39733596/

  230. "Vistara takes Dreamliner aircraft on lease to boost international ops". Business Standard. August 6, 2022. Retrieved January 6, 2024 – via Press Trust of India. https://www.business-standard.com/article/companies/vistara-takes-dreamliner-aircraft-on-lease-to-boost-international-ops-122080600692_1.html

  231. Tangel, Andrew (April 27, 2022). "Boeing Looked for Flaws in Its Dreamliner and Couldn't Stop Finding Them". The Wall Street Journal. Chicago: Dow Jones & Company. Retrieved April 28, 2022. https://www.wsj.com/amp/articles/boeing-dreamliner-delays-faa-defects-11651067545

  232. Johnson, Eric M.; Shepardson, David (May 13, 2022). "Exclusive: U.S. FAA finds Boeing 787 certification documents incomplete -sources". Reuters. https://www.reuters.com/business/aerospace-defense/exclusive-us-faa-finds-boeing-787-certification-documents-incomplete-sources-2022-05-13/

  233. "U.S. Approves Boeing inspection, rework plan to resume 787 deliveries". CNBC. July 30, 2022. https://www.cnbc.com/2022/07/30/us-approves-boeing-inspection-rework-plan-to-resume-787-deliveries.html

  234. Josephs, Leslie (August 10, 2022). "Boeing delivers first 787 Dreamliner since 2021 ending pause over manufacturing flaws". CNBC. Retrieved August 10, 2022. https://www.cnbc.com/2022/08/10/boeing-delivers-first-787-dreamliner-since-2021-after-manufacturing-flaws.html

  235. Ganapavaram, Abhijith; Insinna, Valerie (February 24, 2023). "Boeing shares fall after new Dreamliner delivery halt". Reuters – via reuters.com. https://www.reuters.com/business/aerospace-defense/boeing-shares-fall-after-new-dreamliner-delivery-halt-2023-02-24/

  236. "FAA Approves Resumption of B787 Dreamliner Deliveries". March 13, 2023. Retrieved March 17, 2023. https://www.airlinerwatch.com/2023/03/faa-approves-resumption-of-b787.html

  237. "F.A.A. Investigates Claims by Boeing Whistle-Blower About Flaws in 787 Dreamliner". The New York Times. April 9, 2024. Retrieved April 12, 2024. https://www.nytimes.com/2024/04/09/us/politics/boeing-787-dreamliner-whistle-blower.html

  238. Senanayake, Natalia (April 12, 2024). "Boeing Whistleblower Reportedly Claims 787 Planes Could Break Apart Mid-Air Due to Construction Flaws". Peoplemag. Retrieved April 12, 2024. https://people.com/boeing-whistleblower-787-dreamliner-safety-flaws-claims-8629562

  239. Gates, Dominic (April 9, 2024). "New Boeing whistleblower alleges serious structural flaws on 787 and 777 jets". The Seattle Times. Retrieved April 12, 2024. https://www.seattletimes.com/business/boeing-aerospace/new-boeing-whistleblower-alleges-serious-structural-flaws-on-787-and-777-jets/

  240. Rose, Joel (April 12, 2024). "Another Boeing whistleblower says he faced retaliation for reporting 'shortcuts'". National Public Radio. Retrieved April 12, 2024. https://www.npr.org/2024/04/12/1244147895/boeing-whistleblower-retaliation-shortcuts-787-dreamliner

  241. "Boeing's Dreamliner Turning into Nightmares Due to Repeated Quality and Production Issues". March 17, 2025. https://www.aeronewsjournal.com/2025/03/boeings-dreamliner-turning-into.html?m=1

  242. "More than 500 Boeing 787s with faulty parts cleared audits during Italian fraud". March 14, 2025. https://www.aeronewsjournal.com/2025/03/more-than-500-boeing-787s-with-faulty.html?m=1

  243. "Boeing 787: A Matter of Materials – Special Report: Anatomy of a Supply Chain". IndustryWeek.com, December 1, 2007. https://www.industryweek.com/leadership/companies-executives/article/21942033/boeing-787-a-matter-of-materials-special-report-anatomy-of-a-supply-chain

  244. "787 Dreamliner Program Fact Sheet". Boeing web page. The Boeing Company. Retrieved July 10, 2007. http://www.boeing.com/commercial/787family/programfacts.html

  245. Hawk, Jeff (May 25, 2005). The Boeing 787 Dreamliner: More Than an Airplane (PDF). AIAA/AAAF Aircraft Noise and Emissions Reduction Symposium. American Institute of Aeronautics and Astronautics. Archived from the original (PDF) on August 8, 2007. Retrieved July 15, 2007. https://web.archive.org/web/20070808001501/http://www.aiaa.org/events/aners/Presentations/ANERS-Hawk.pdf

  246. Hawk, Jeff (May 25, 2005). The Boeing 787 Dreamliner: More Than an Airplane (PDF). AIAA/AAAF Aircraft Noise and Emissions Reduction Symposium. American Institute of Aeronautics and Astronautics. Archived from the original (PDF) on August 8, 2007. Retrieved July 15, 2007. https://web.archive.org/web/20070808001501/http://www.aiaa.org/events/aners/Presentations/ANERS-Hawk.pdf

  247. Zaman, K. B. M. Q.; Bridges, J. E.; Huff, D. L. "Evolution from 'Tabs' to 'Chevron Technology' – a Review" (PDF). Proceedings of the 13th Asian Congress of Fluid Mechanics December 17–21, 2010, Dhaka, Bangladesh. NASA Glenn Research Center. Cleveland, Ohio, US: 47–63. Archived from the original (PDF) on November 20, 2012. 1.34 MB. https://web.archive.org/web/20121120185702/http://www.afmc.org.cn/13thacfm/invited/201.pdf

  248. "787 performance summary". Boeing. http://www.boeing.com/commercial/787/by-design/#/all-model-performance-summary

  249. "Boeing 787 program background". Retrieved May 4, 2007. http://www.boeing.com/commercial/787family/background.html

  250. Ostrower, Jon. "FARNBOROUGH: Boeing presses on with 787 flight-testing (Jul 11, 2010)". FlightGlobal. Retrieved April 2, 2017. https://www.flightglobal.com/news/articles/farnborough-boeing-presses-on-with-787-flight-testi-343871/

  251. "Boeing 787 from the Ground Up". Boeing, Aero magazine, QTR_04/06. http://www.boeing.com/commercial/aeromagazine/articles/qtr_4_06/AERO_Q406_article4.pdf

  252. Sinnet, Mike (2007). "Saving Fuel and enhancing operational efficiencies" (PDF). Boeing. Retrieved January 17, 2013. http://www.boeing.com/commercial/aeromagazine/articles/qtr_4_07/AERO_Q407_article2.pdf

  253. Boeing 787-8 Critical System Review Team (March 19, 2014). "Boeing 787-8 Design, Certification, and Manufacturing Systems Review" (PDF). Federal Aviation Administration.{{cite web}}: CS1 maint: numeric names: authors list (link) https://www.faa.gov/about/plans_reports/media/787_Report_Final.pdf

  254. Susanna Ray, Thomas Black & Mary Jane Credeur. "Boeing 787 Groundings Traced to One-of-a-Kind Technology" Bloomberg, January 17, 2013. Retrieved January 17, 2013. https://www.bloomberg.com/news/2013-01-17/boeing-787-groundings-trace-to-one-of-a-kind-technology.html

  255. "Taking to the skies", p. 47. Aviation Week & Space Technology, December 10, 2012. /wiki/Aviation_Week_%26_Space_Technology

  256. "787 No Bleed Systems". Boeing Aero magazine, Quarter 4, 2007. http://www.boeing.com/commercial/aeromagazine/articles/qtr_4_07/article_02_4.html

  257. 787 integrates new composite wing deicing system. Composites World, December 30, 2008. http://www.compositesworld.com/articles/787-integrates-new-composite-wing-deicing-system

  258. Croft, John (July 2006). "Airbus and Boeing spar for middleweight" (PDF). American Institute of Aeronautics and Astronautics. Archived from the original (PDF) on July 10, 2007. Retrieved July 8, 2007. https://web.archive.org/web/20070710095616/http://www.aiaa.org/aerospace/images/articleimages/pdf/AA_July05_CRO1.pdf

  259. Universal-type gust alleviation system for aircraft, United States Patent 4905934. Free patents online, original publication March 6, 1990. Retrieved December 9, 2009. http://www.freepatentsonline.com/4905934.html

  260. "Taking to the skies". Aviation Week & Space Technology. December 10, 2012. p. 48.

  261. Ramsey, James W. (June 1, 2005). "Boeing 787: Integration's Next Step". Aviation Today. https://www.aviationtoday.com/2005/06/01/boeing-787-integrations-next-step/

  262. "What is ARINC 661?" Web archive of Engenuity Technologies page. https://web.archive.org/web/20041023221505/http://www.engenuitytech.com/products/VAPS/XT_661/faq.shtml

  263. "Boeing Unveils 787 Dreamliner Flight Deck Archived April 9, 2007, at the Wayback Machine Boeing, August 31, 2005. Retrieved September 2, 2011. http://www.boeing.com/news/releases/2005/q3/nr_050831g.html

  264. Norris, G; Thomas, G; Wagner, M; Forbes Smith, C (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 978-0-9752341-2-9. 978-0-9752341-2-9

  265. Coppinger, Rob (October 6, 2006). "NASA Orion crew vehicle will use voice controls in Boeing 787-style Honeywell smart cockpit". Flight International. Retrieved October 6, 2006. http://www.flightglobal.com/articles/2006/10/06/209724/nasa-orion-crew-vehicle-will-use-voice-controls-in-boeing-787-style-honeywell-smart.html

  266. Norris, G; Thomas, G; Wagner, M; Forbes Smith, C (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 978-0-9752341-2-9. 978-0-9752341-2-9

  267. Norris, G; Thomas, G; Wagner, M; Forbes Smith, C (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 978-0-9752341-2-9. 978-0-9752341-2-9

  268. Brewin, Bob (January 22, 2013). "A 2006 battery fire destroyed Boeing 787 supplier's facility". nextgov.com. Retrieved January 23, 2013. http://www.nextgov.com/emerging-tech/2013/01/2006-battery-fire-destroyed-boeing-787-suppliers-facility/60809/

  269. "Power conversion". Meggitt/Securaplane. Retrieved January 30, 2013. http://www.securaplane.com/products/power-conversion

  270. "Lithium Power". GS Yuasa. Archived from the original on January 16, 2013. Retrieved January 20, 2013. https://web.archive.org/web/20130116222539/http://www.gsyuasa-lp.com/aviation-lithium-ion-markets

  271. "Thales selects GS Yuasa for Lithium ion battery system in Boeing's 787 Dreamliner" (PDF). GS Yuasa. Retrieved January 18, 2013. http://www.s399157097.onlinehome.us/PDFS/BoeingPR_06_12_2005.pdf

  272. "Development of Large-sized Lithium-ion Battery for Aviation Applications" (PDF). GS Yuasa. Archived from the original (PDF) on February 3, 2013. Retrieved January 20, 2012. https://web.archive.org/web/20130203145213/http://www.gs-yuasa.com/us/technic/vol7/pdf/007_01_014.pdf

  273. "Boeing: 787 battery blew up in '06 lab test, burned down building". Seattle Times. January 24, 2013. Retrieved January 24, 2013. http://seattletimes.com/html/businesstechnology/2020199686_787batterysafetyxml.html

  274. "FAA Statement". Federal Aviation Administration. January 16, 2013. Retrieved January 17, 2013. http://www.faa.gov/news/press_releases/news_story.cfm?newsId=14233

  275. McHale, John (April 2005). "AFDX technology to improve communications on Boeing 787". mae.pennet.com. mae.pennnet.com. Archived from the original on August 3, 2004. Retrieved July 8, 2007. https://web.archive.org/web/20040803173325/http://mae.pennnet.com/Articles/Article_Display.cfm?Section=Articles

  276. Zetter, Kim (January 4, 2008). "FAA: Boeing's New 787 May Be Vulnerable to Hacker Attack". Wired. Retrieved January 6, 2008. https://www.wired.com/politics/security/news/2008/01/dreamliner_security

  277. Zetter, Kim (January 4, 2008). "FAA: Boeing's New 787 May Be Vulnerable to Hacker Attack". Wired. Retrieved January 6, 2008. https://www.wired.com/politics/security/news/2008/01/dreamliner_security

  278. "Special Conditions: Boeing Model 787-8 Airplane; Systems and Data Networks Security—Isolation or Protection From unauthorized Passenger Domain Systems Access". Federal Aviation Administration. U.S. Government Printing Office (GPO). January 3, 2008. Retrieved November 1, 2012. For these design features, the applicable airworthiness regulations do not contain adequate or appropriate safety standards for protection and security of airplane systems and data networks against unauthorized access. https://www.gpo.gov/fdsys/pkg/FR-2008-01-02/html/E7-25467.htm

  279. Zetter, Kim (January 4, 2008). "FAA: Boeing's New 787 May Be Vulnerable to Hacker Attack". Wired. Retrieved January 6, 2008. https://www.wired.com/politics/security/news/2008/01/dreamliner_security

  280. Trimble, Stephen (March 28, 2018). "Boeing 787-10 technical description and cutaway". Flightglobal. https://www.flightglobal.com/news/articles/analysis-boeing-787-10-technical-description-and-cu-446856/

  281. Marsh, George (April 8, 2014). "Composites flying high (Part 1)". Materials Today. Archived from the original on September 16, 2015. Retrieved May 23, 2015. https://web.archive.org/web/20150916181258/http://www.materialstoday.com/composite-applications/features/composites-flying-high-part-1/

  282. "Market Research Report: Strategic Business Expansion of Carbon Fiber, Torayca" (PDF) (press release). Toray Industries. April 12, 2005. Archived from the original (PDF) on February 4, 2007. Retrieved July 9, 2007. https://web.archive.org/web/20070204052035/http://www.toray.com/ir/press/pdf/050412press.pdf

  283. Hawk, Jeff (May 25, 2005). The Boeing 787 Dreamliner: More Than an Airplane (PDF). AIAA/AAAF Aircraft Noise and Emissions Reduction Symposium. American Institute of Aeronautics and Astronautics. Archived from the original (PDF) on August 8, 2007. Retrieved July 15, 2007. https://web.archive.org/web/20070808001501/http://www.aiaa.org/events/aners/Presentations/ANERS-Hawk.pdf

  284. Wallace, James (June 29, 2007). "How the 787 'Dream' was born". Seattle Post-Intelligencer. http://www.seattlepi.com/business/321719_dreamliner29.html

  285. William G. Roeseler; Branko Sarh; Max U. Kismarton (July 9, 2007). "COMPOSITE STRUCTURES: THE FIRST 100 YEARS" (PDF). 16TH INTERNATIONAL CONFERENCE ON COMPOSITE MATERIALS. http://www.iccm-central.org/Proceedings/ICCM16proceedings/contents/pdf/MonA/MoAM1-01sp_roeselerw228184p.pdf

  286. "Boeing Testing Sample Sonic Cruiser Fuselage". Boeing. July 24, 2002. Archived from the original on December 5, 2008. https://web.archive.org/web/20081205020633/http://www.boeing.com/news/releases/2002/photorelease/q3/pr_020724h2.html

  287. "Development Work on Boeing 787 Noses Ahead". Boeing. July 13, 2005. Archived from the original on May 5, 2010. Retrieved June 14, 2011. https://web.archive.org/web/20100505031408/http://www.boeing.com/news/releases/2005/photorelease/q2/pr_050613h2.html

  288. Matlack, Carol (June 26, 2009). "More Boeing 787 Woes as Qantas Drops Order". Bloomberg BusinessWeek. Bloomberg. Archived from the original on June 29, 2009. Retrieved December 14, 2010. https://web.archive.org/web/20090629051805/http://www.businessweek.com/globalbiz/content/jun2009/gb20090626_089756.htm

  289. Haines, Lester (September 19, 2007). "787 unsafe, claims former Boeing engineer". The Register. https://www.theregister.co.uk/2007/09/19/dreamliner_allegations/

  290. Gates, Dominic (September 18, 2007). "Fired engineer calls 787's plastic fuselage unsafe". The Seattle Times. Retrieved November 24, 2007. http://seattletimes.nwsource.com/html/boeingaerospace/2003889663_boeing180.html

  291. Haines, Lester (September 19, 2007). "787 unsafe, claims former Boeing engineer". The Register. https://www.theregister.co.uk/2007/09/19/dreamliner_allegations/

  292. Wallace, James (January 9, 2006). "Airbus to use composites". Seattle Post-Intelligencer. Hearst Communications Inc. http://www.seattlepi.com/default/article/Airbus-to-use-composites-1192234.php

  293. Bickers, Chaz (July 2006). "Good as GoldCare: Revolutionary 787 fleet support program complements airplane's technical achievements" (PDF). Boeing Frontiers. Boeing. Retrieved September 2, 2011. http://www.boeing.com/news/frontiers/archive/2006/july/i_ca02.pdf

  294. Johnsson, Julie (September 2, 2007). "Boeing coining plan for composite parts". Chicago Tribune. Tribune Interactive. https://www.chicagotribune.com/2007/09/02/boeing-coining-plan-for-composite-parts/

  295. "Section 2.4 Interior Arrangements; Section 2.5 Cabin Cross–Sections" (PDF). D6-58331, Boeing 787 Airplane Characteristics for Airport Planning. Boeing Commercial Aircraft. December 2015. pp. 10, 13. http://www.boeing.com/assets/pdf/commercial/airports/acaps/787.pdf

  296. Flynn, David (December 12, 2012). "BA reveals Airbus A380, Boeing 787 Dreamliner seatmaps". Australian Business Traveller. Retrieved December 21, 2012. http://www.ausbt.com.au/ba-british-airways-reveals-airbus-a380-boeing-787-dreamliner-seatmaps

  297. "Section 2.4 Interior Arrangements; Section 2.5 Cabin Cross–Sections" (PDF). D6-58331, Boeing 787 Airplane Characteristics for Airport Planning. Boeing Commercial Aircraft. December 2015. pp. 10, 13. http://www.boeing.com/assets/pdf/commercial/airports/acaps/787.pdf

  298. Wallace, James (November 18, 2005). "Boeing details 787 improvements". Seattle Post-Intelligencer. Hearst Communications. Retrieved September 2, 2011. http://www.seattlepi.com/default/article/Boeing-details-787-improvements-1187786.php

  299. "A330 and A340 family specifications". Airbus. Archived from the original on March 4, 2008. https://web.archive.org/web/20080304140424/http://www.airbus.com/en/aircraftfamilies/a330a340/a330-200/specifications.html

  300. "A350 XWB Xtra comfort". Airbus. Archived from the original on February 5, 2008. https://web.archive.org/web/20080205041546/http://www.airbus.com/en/aircraftfamilies/a350/comfort.html

  301. "Airbus unveils widebody, says A350 XWB will top 787 and 777". Seattle Post-Intelligencer. July 18, 2006. Archived from the original on June 11, 2007. https://web.archive.org/web/20070611110609/http://seattlepi.nwsource.com/business/277877_airshow18.html

  302. "British Airways 787-8 Seat Map". SeatGuru. Retrieved August 28, 2014. http://www.seatguru.com/airlines/British_Airways/British_Airways_Boeing_787-8.php

  303. Wallace, James (February 22, 2006). "Aerospace Notebook: More seats sought on 787". Seattle-PI. Retrieved February 12, 2012. http://www.seattlepi.com/default/article/Aerospace-Notebook-More-seats-sought-on-787-1196487.php

  304. Verghese, Vijay. "A survey of the best airline economy seats". Smart travel Asia. Retrieved February 12, 2012. http://www.smarttravelasia.com/economy.htm

  305. "Why I tell people to avoid flying on a 787". January 22, 2015. Retrieved September 5, 2016. https://www.runwaygirlnetwork.com/2015/01/22/opinion-why-i-tell-people-to-avoid-flying-on-a-787/

  306. "Why I tell people to avoid flying on a 787". January 22, 2015. Retrieved September 5, 2016. https://www.runwaygirlnetwork.com/2015/01/22/opinion-why-i-tell-people-to-avoid-flying-on-a-787/

  307. "Negative feedback prompts British Airways to widen seats for 787-9". August 23, 2015. Retrieved September 5, 2016. https://www.runwaygirlnetwork.com/2015/08/23/negative-feedback-prompts-british-airways-to-widen-seats-for-787-9/

  308. Morrison, Geoffrey. "15 hours on a Boeing 787 Dreamliner, in coach". Retrieved September 5, 2016. https://www.cnet.com/news/15-hours-on-a-boeing-787-dreamliner-in-coach/

  309. Wallace, James (June 5, 2007). "Aerospace Notebook: In Airbus, Boeing duel, jet windows a shut case". Seattle Post-Intelligencer. Retrieved September 2, 2011. http://www.seattlepi.com/default/article/Aerospace-Notebook-In-Airbus-Boeing-duel-jet-1239599.php

  310. Wallace, James (November 26, 2008). "Continental plans Dreamliner seats to be roomy, with a view". Seattle Post-Intelligencer. Retrieved November 28, 2008. [dead link] Alt URL Archived September 28, 2015, at the Wayback Machine http://www.seattlepi.com/business/389650_dreamwindows27.html

  311. Norris & Wagner 2009, p. 49. - Norris, Guy; Wagner, Mark (2009). Boeing 787 Dreamliner. Minneapolis: Zenith Press. ISBN 978-0-7603-2815-6.

  312. Norris, Guy (December 20, 2005). "Qantas deal sees launch of 787-9". Flight International. Reed Elsevier. http://www.flightglobal.com/articles/2005/12/20/203644/qantas-deal-sees-launch-of-787-9.html

  313. Schofield, Adrian (June 24, 2012). "The 787 windows issue (with pics)". Aviation Week. Archived from the original on January 20, 2013. Retrieved January 29, 2013. https://web.archive.org/web/20130120200621/http://www.aviationweek.com/Blogs.aspx?plckBlogId=Blog:7a78f54e-b3dd-4fa6-ae6e-dff2ffd7bdbb

  314. Parker Brown, David (June 21, 2012). "ANA is NOT Looking to Install Sunshades on their Boeing 787s — No Complaints Were Received". Airline Reporter. Retrieved January 27, 2013. http://www.airlinereporter.com/2012/06/do-boeing-787-dreamliner-windows-dim-enough/

  315. Wallace, James (November 26, 2008). "Continental plans Dreamliner seats to be roomy, with a view". Seattle Post-Intelligencer. Retrieved November 28, 2008. [dead link] Alt URL Archived September 28, 2015, at the Wayback Machine http://www.seattlepi.com/business/389650_dreamwindows27.html

  316. Turner, Edgar (2010). The Birth of the 787 Dreamliner. Kansas City, MO: Andrews McMeel. p. 220. ISBN 978-0-7407-9667-8. 978-0-7407-9667-8

  317. Schofield, Adrian (June 24, 2012). "The 787 windows issue (with pics)". Aviation Week. Archived from the original on January 20, 2013. Retrieved January 29, 2013. https://web.archive.org/web/20130120200621/http://www.aviationweek.com/Blogs.aspx?plckBlogId=Blog:7a78f54e-b3dd-4fa6-ae6e-dff2ffd7bdbb

  318. Flynn, David (October 26, 2011). "Light fantastic: Boeing 787 Dreamliner's digital window tinting". Australian Business Traveller. Retrieved January 27, 2013. http://www.ausbt.com.au/light-fantastic-boeing-787-dreamliner-s-digital-window-tinting

  319. Parker Brown, David (June 21, 2012). "ANA is NOT Looking to Install Sunshades on their Boeing 787s — No Complaints Were Received". Airline Reporter. Retrieved January 27, 2013. http://www.airlinereporter.com/2012/06/do-boeing-787-dreamliner-windows-dim-enough/

  320. "Interior Lighting Systems, Mood Lighting". Germany: Diehl Aerospace. Archived from the original on March 17, 2012. Retrieved May 1, 2007. https://web.archive.org/web/20120317051452/http://www.diehl.com/en/diehl-aerosystems/aircraft-systems/interior-lighting-systems.html

  321. "Mood Lighting System". Diehl Aerospace. 2012. Archived from the original on January 20, 2012. Retrieved January 1, 2012. https://web.archive.org/web/20120120155631/http://www.diehl-aerospace.de/index.php?id=3638&L=1

  322. Gubisch, Michael (December 20, 2005). "In Focus: Cabin interior advances beyond seats and IFE". Flight International. Reed Elsevier. http://www.flightglobal.com/news/articles/in-focus-cabin-interior-advances-beyond-seats-and-ife-369430/

  323. "Interior Lighting Systems, Mood Lighting". Germany: Diehl Aerospace. Archived from the original on March 17, 2012. Retrieved May 1, 2007. https://web.archive.org/web/20120317051452/http://www.diehl.com/en/diehl-aerosystems/aircraft-systems/interior-lighting-systems.html

  324. Cram, Jennifer (March 26, 2007). "Boeing Unveils Improved Access Features on the 787". Boeing press release. Boeing. Archived from the original on October 11, 2007. Retrieved July 10, 2007. https://web.archive.org/web/20071011230241/http://boeing.com/commercial/787family/news/2007/q1/070326c_nr.html

  325. Adams, Marilyn (November 1, 2006). "Breathe easy, Boeing says". USA Today. https://www.usatoday.com/money/biztravel/2006-10-30-boeing-air-usat_x.htm

  326. Croft, John (July 2006). "Airbus and Boeing spar for middleweight" (PDF). American Institute of Aeronautics and Astronautics. Archived from the original (PDF) on July 10, 2007. Retrieved July 8, 2007. https://web.archive.org/web/20070710095616/http://www.aiaa.org/aerospace/images/articleimages/pdf/AA_July05_CRO1.pdf

  327. "Boeing 7E7 Offers Preferred Cabin Environment, Study Finds" (Press release). Boeing. July 19, 2004. Archived from the original on November 6, 2011. Retrieved June 14, 2011. https://web.archive.org/web/20111106180815/http://www.boeing.com/news/releases/2004/q3/nr_040719i.html

  328. Ogando, Joseph, ed. (June 4, 2007). "Boeing's 'More Electric' 787 Dreamliner Spurs Engine Evolution: On the 787, Boeing eliminated bleed air and relied heavily on electric starter generators". Design News. Archived from the original on April 6, 2012. Retrieved September 9, 2011. https://web.archive.org/web/20120406062451/http://www.designnews.com/document.asp?doc_id=222308

  329. Dornheim, Michael (March 27, 2005). "Massive 787 Electrical System Pressurizes Cabin". Aviation Week & Space Technology. http://aviationweek.com/awin/massive-787-electrical-system-pressurizes-cabin

  330. Adams, Marilyn (November 1, 2006). "Breathe easy, Boeing says". USA Today. https://www.usatoday.com/money/biztravel/2006-10-30-boeing-air-usat_x.htm

  331. Adams, Marilyn (November 1, 2006). "Breathe easy, Boeing says". USA Today. https://www.usatoday.com/money/biztravel/2006-10-30-boeing-air-usat_x.htm

  332. Hawk, Jeff (May 25, 2005). The Boeing 787 Dreamliner: More Than an Airplane (PDF). AIAA/AAAF Aircraft Noise and Emissions Reduction Symposium. American Institute of Aeronautics and Astronautics. Archived from the original (PDF) on August 8, 2007. Retrieved July 15, 2007. https://web.archive.org/web/20070808001501/http://www.aiaa.org/events/aners/Presentations/ANERS-Hawk.pdf

  333. Turner, Edgar (2010). The Birth of the 787 Dreamliner. Kansas City, MO: Andrews McMeel. p. 220. ISBN 978-0-7407-9667-8. 978-0-7407-9667-8

  334. Kingsley-Jones, Max (February 26, 2020). "Can Rolls-Royce win back confidence in 787 engine market?". Flight Global. Retrieved November 1, 2020. https://www.flightglobal.com/engines/can-rolls-royce-win-back-confidence-in-787-engine-market/136946.article

  335. Norris, G; Thomas, G; Wagner, M; Forbes Smith, C (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 978-0-9752341-2-9. 978-0-9752341-2-9

  336. Corliss, Bryan (June 21, 2009). "What's new, different about the 787". The Daily Herald. Retrieved January 22, 2011. http://www.heraldnet.com/article/20090621/BIZ/701299594

  337. ""787 Isn't Meeting 24-hour Engine Change Promo, lessor says" (PDF). Leeham News and Analysis. July 18, 2005. Archived from the original (PDF) on September 23, 2006. https://web.archive.org/web/20060923145748/http://www.leeham.net/filelib/SCOTTSCOLUMN071805.pdf

  338. ""787 Isn't Meeting 24-hour Engine Change Promo, lessor says" (PDF). Leeham News and Analysis. July 18, 2005. Archived from the original (PDF) on September 23, 2006. https://web.archive.org/web/20060923145748/http://www.leeham.net/filelib/SCOTTSCOLUMN071805.pdf

  339. Norris, G; Thomas, G; Wagner, M; Forbes Smith, C (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 978-0-9752341-2-9. 978-0-9752341-2-9

  340. Wallace, James (June 29, 2007). "How the 787 'Dream' was born". Seattle Post-Intelligencer. http://www.seattlepi.com/business/321719_dreamliner29.html

  341. Zaman, K. B. M. Q.; Bridges, J. E.; Huff, D. L. "Evolution from 'Tabs' to 'Chevron Technology' – a Review" (PDF). Proceedings of the 13th Asian Congress of Fluid Mechanics December 17–21, 2010, Dhaka, Bangladesh. NASA Glenn Research Center. Cleveland, Ohio, US: 47–63. Archived from the original (PDF) on November 20, 2012. 1.34 MB. https://web.archive.org/web/20121120185702/http://www.afmc.org.cn/13thacfm/invited/201.pdf

  342. "GR & Boeing Demo. Quiet Technology" (press release). Goodrich. August 16, 2005. Archived from the original on October 19, 2007. Retrieved July 10, 2007. https://web.archive.org/web/20071019053358/http://www.goodrich.com/Feature/SingleStory/0%2C1285%2C67%2C00.html

  343. Hawk, Jeff (May 25, 2005). The Boeing 787 Dreamliner: More Than an Airplane (PDF). AIAA/AAAF Aircraft Noise and Emissions Reduction Symposium. American Institute of Aeronautics and Astronautics. Archived from the original (PDF) on August 8, 2007. Retrieved July 15, 2007. https://web.archive.org/web/20070808001501/http://www.aiaa.org/events/aners/Presentations/ANERS-Hawk.pdf

  344. "Trent 1000". Rolls-Royce. Retrieved May 2, 2025. https://www.rolls-royce.com/products-and-services/civil-aerospace/widebody/trent-1000.aspx

  345. "Boeing 787 Dreamliner Sets Speed, Distance Records" (Press release). Boeing. December 8, 2011. http://boeing.mediaroom.com/2011-12-08-Boeing-787-Dreamliner-Sets-Speed-Distance-Records

  346. "Boeing Announces 787 Dream Tour". Boeing. November 23, 2011. http://boeing.mediaroom.com/2011-11-23-Boeing-Announces-787-Dream-Tour

  347. "Boeing, ANA Celebrate First 787 Biofuel Flight" (Press release). Boeing. April 17, 2012. http://boeing.mediaroom.com/2012-04-16-Boeing-ANA-Celebrate-First-787-Biofuel-Flight

  348. Steve Creedy (June 12, 2012). "Rave reviews for Boeing's 787". The Australian. http://www.theaustralian.com.au/business/aviation/rave-reviews-for-boeings-787/news-story/070f6492c47f34db0e36432897931128

  349. Guy Norris (June 26, 2012). "Operators Reporting Positive 787 Fuel-Burn Results". Aviation Week. http://aviationweek.com/awin/operators-reporting-positive-787-fuel-burn-results

  350. Guy Norris; Cathy Buyck; Adrian Schofield; Madhu Unnikrishnan; Jeremy Torr (July 14, 2014). "Airlines Singing Praises of 787". Aviation Week and Space Technology. Archived from the original on April 17, 2015. http://aviationweek.com/commercial-aviation/airlines-singing-praises-787

  351. Ostrower, Jon (June 10, 2014). "Boeing's Key Mission: Cut Dreamliner Cost". The Wall Street Journal. p. B1. Retrieved June 10, 2014. https://www.wsj.com/news/articles/SB10001424052702304361604579292333739357034

  352. David Kaminski Morrow (November 6, 2017). "IAG lauds ownership-cost benefit of Level A330s". Flightglobal. https://www.flightglobal.com/news/articles/iag-lauds-ownership-cost-benefit-of-level-a330s-442905/

  353. "Boeing tackles 787 APU overheating issue". Aviation Week. May 27, 2013. Retrieved December 8, 2014. http://aviationweek.com/awin/boeing-tackles-787-apu-overheating-issue

  354. "NTSB urges grounding for certain GEnx-powered 787 and 747-8s". Flight International. September 15, 2012. http://www.flightglobal.com/news/articles/ntsb-urges-grounding-for-certain-genx-powered-787-and-747-8s-376525/

  355. "Boeing: Problems with 787 Dreamliner "Normal"". frequentbusinesstraveler.com. December 16, 2012. Archived from the original on December 30, 2012. Retrieved December 16, 2012. https://web.archive.org/web/20121230210252/http://www.frequentbusinesstraveler.com/2012/12/boeing-problems-with-787-dreamliner-normal/

  356. "Boeing 787 Dreamliner: a timeline of problems". The Telegraph. London. July 28, 2013. Archived from the original on January 11, 2022. Retrieved August 14, 2013. https://www.telegraph.co.uk/travel/travelnews/10207415/Boeing-787-Dreamliner-a-timeline-of-problems.html

  357. Ostrower, Jon (March 8–9, 2014). "New Boeing woe: 787 wing defect". The Wall Street Journal. pp. B1, B4.

  358. Wyndham, David (October 1, 2012). "Aircraft Reliability". AvBuyer. World Aviation Communication Ltd. http://www.avbuyer.com/articles/business-aviation-and-the-boardroom/aircraft-reliability/

  359. Guy Norris (November 24, 2015). "With Better Dispatch Reliability, Boeing 787 Deliveries Reach 350". Aviation Week & Space Technology. http://aviationweek.com/commercial-aviation/better-dispatch-reliability-boeing-787-deliveries-reach-350

  360. Bjorn Fehrm (May 11, 2017). "ISTAT Asia 2017: The fight for the lead". Leeham. https://leehamnews.com/2017/05/11/istat-asia-2017-fight-lead/

  361. Brian Sumers (January 22, 2016). "Air Canada's 787 Expansion Plans Still In Play". Aviation Week & Space Technology. http://aviationweek.com/commercial-aviation/air-canada-s-787-expansion-plans-still-play

  362. "787: Living the dream with amazing new routes? (Or just another great replacement aircraft?)". Airline Network News & Analysis. August 9, 2017. http://www.anna.aero/2017/08/09/boeing-delivered-565-787s-since-introduction-2011/

  363. "Jet makes history on flight from Australia". BBC News. March 25, 2018. Retrieved March 26, 2018. https://www.bbc.com/news/world-australia-43530332

  364. Street, Francesca (March 17, 2020). "Virus creates world's longest passenger flight". CNN. Retrieved March 17, 2020. https://edition.cnn.com/travel/article/coronavirus-worlds-longest-flight/index.html

  365. Howard Hardee (June 1, 2023). "Advanced materials emerge as challenging new frontier for aircraft recycling". Flightglobal. https://www.flightglobal.com/airframers/advanced-materials-emerge-as-challenging-new-frontier-for-aircraft-recycling/153420.article

  366. Howard Hardee (June 1, 2023). "Advanced materials emerge as challenging new frontier for aircraft recycling". Flightglobal. https://www.flightglobal.com/airframers/advanced-materials-emerge-as-challenging-new-frontier-for-aircraft-recycling/153420.article

  367. Howard Hardee (June 1, 2023). "Advanced materials emerge as challenging new frontier for aircraft recycling". Flightglobal. https://www.flightglobal.com/airframers/advanced-materials-emerge-as-challenging-new-frontier-for-aircraft-recycling/153420.article

  368. "aircraft type designators" (PDF). International Civil Aviation Organization. http://cfapp.icao.int/Doc8643/reports/Part2-By%20Type%20Designator(Decode).pdf

  369. "787 performance summary". Boeing. http://www.boeing.com/commercial/787/by-design/#/all-model-performance-summary

  370. "The ultimate guide to aircraft variants". Key Publishing. October 6, 2020. Retrieved January 6, 2024. https://www.key.aero/article/ultimate-guide-aircraft-variants

  371. "Boeing to implement structural design change in 787-8 for production commonality". Leeham News. April 17, 2018. https://leehamnews.com/2018/04/17/boeing-to-implement-structural-design-change-in-787-8-for-production-commonality

  372. "B767-300ER Historical Value Behavior Defy Expectations". Aircraft Value News. October 29, 2018. http://www.aircraftvaluenews.com/b767-300er-historical-value-behavior-defy-expectations/

  373. "787 performance summary". Boeing. http://www.boeing.com/commercial/787/by-design/#/all-model-performance-summary

  374. Kingsley-Jones, Max (July 18, 2014). "Aero secrets of Boeing's new Dreamliner". Flightglobal. Archived from the original on July 24, 2014. Retrieved July 24, 2014. http://www.flightglobal.com/news/articles/farnborough-aero-secrets-of-boeings-new-dreamliner-401784/

  375. "Boeing clears firm configuration hurdle for 787-9". Flight International. July 1, 2010. Retrieved July 2, 2010. http://www.flightglobal.com/articles/2010/07/01/343969/boeing-clears-firm-configuration-hurdle-for-787-9.html

  376. "Boeing delays first 747-8I and 787-9 deliveries". Flightglobal. October 27, 2011. Retrieved January 20, 2013. http://www.flightglobal.com/news/articles/boeing-delays-first-747-8i-and-787-9-deliveries-363941/

  377. "Boeing 787-9 takes off for maiden flight". Flightglobal. September 17, 2013. http://www.flightglobal.com/news/articles/boeing-787-9-takes-off-for-maiden-flight-390652/

  378. "Boeing completes first flight of 2nd 787-9". Flight Global. November 8, 2013. http://www.flightglobal.com/news/articles/boeing-completes-first-flight-of-2nd-787-9-392727/

  379. Stake, Tim (July 7, 2014). "Air NZ 787-9 To Be Showcased at Famous Airshow". Fairfax New Zealand. Retrieved July 12, 2014. http://www.stuff.co.nz/travel/news/10241024/Air-NZ-787-9-to-be-showcased-at-famous-airshow

  380. Durston, James (July 9, 2014). "Air New Zealand shows off stunning, all-black Dreamliner". CNN. Retrieved July 9, 2014. https://edition.cnn.com/travel/article/air-new-zealand-787-9-dreamliner/index.html

  381. "Air New Zealand operates first 787 service". Australian Aviation. August 9, 2014. Retrieved August 10, 2014. http://australianaviation.com.au/2014/08/air-new-zealand-operates-first-787-service

  382. "ANA sets date for first scheduled flights with Boeing 787-9". All Nippon Airways. Retrieved November 6, 2014. http://www.ana.co.jp/eng/aboutana/press/2014/140731.html

  383. "United Airlines to Launch Nonstop Service Between Los Angeles and Melbourne, Australia". United Airlines. February 20, 2014. Archived from the original on October 15, 2014. Retrieved March 1, 2014. https://web.archive.org/web/20141015160240/http://newsroom.unitedcontinentalholdings.com/2014-02-20-United-Airlines-to-Launch-Nonstop-Service-Between-Los-Angeles-and-Melbourne-Australia

  384. "Air China Brings China's First Boeing 787-9 Home". China Aviation Daily. Retrieved July 8, 2016. http://www.chinaaviationdaily.com/news/52/52558.html

  385. Aircraft Value News (May 14, 2018). "A350-900 Lease Rentals Hold Steady". http://www.aircraftvaluenews.com/a350-900-lease-rentals-hold-steady/

  386. Guy Norris (December 19, 2016). "Simplicity Is Vital To Boeing 787-10 Execution". Aviation Week & Space Technology. http://aviationweek.com/commercial-aviation/simplicity-vital-boeing-787-10-execution

  387. "Australia-UK: First non-stop flight arrives in London from Perth". BBC News. March 25, 2018. Retrieved March 25, 2018. https://www.bbc.com/news/world-australia-43530332

  388. "Le plus long vol direct de l'histoire a duré plus de 19 heures". La Presse. Agence France-Presse. October 20, 2019. Retrieved October 20, 2019. https://www.lapresse.ca/voyage/201910/20/01-5246153-le-plus-long-vol-direct-de-lhistoire-a-dure-plus-de-19-heures.php

  389. "New Record For World's Longest Flight". Air Tahiti Nui (Press release). March 20, 2020. https://www.airtahitinui.com/us-en/air-tahiti-nui-new-record-worlds-longest-flight-tahiti-paris-working

  390. James Wallace (December 21, 2005). "Everett work force for 787 pegged at 1,000". Seattle Post-Intelligencer. http://www.seattlepi.com/business/article/Everett-work-force-for-787-pegged-at-1-000-1190602.php

  391. Baseler, Randy (February 8, 2006). "Dash 10". Boeing Blog. http://www.boeingblogs.com/randy/archives/2006/02/dash_10.html

  392. Lunsford, J. Lynn (March 28, 2006). "Boeing to Offer Larger Version of 787 Dreamliner". The Wall Street Journal. https://www.wsj.com/articles/SB114349310320609340

  393. Kaminski-Morrow, David (May 30, 2013). "Singapore to launch 787-10X with order for 30". Flight International. http://www.flightglobal.com/news/articles/singapore-to-launch-787-10x-with-order-for-30-386486/

  394. Flynn, David (May 30, 2013). "Singapore Airlines signs up for Boeing's 787-10X Dreamliner". Australian Business Traveller. http://www.ausbt.com.au/singapore-airlines-signs-up-for-boeing-s-787-10x-dreamliner

  395. "Boeing Launches 787-10 Dreamliner". Boeing. June 18, 2013. http://boeing.mediaroom.com/index.php?s=43&item=2711

  396. "787 Model Summary Through June 2018". Boeing. Archived from the original on July 19, 2018. https://web.archive.org/web/20180719132838/http://active.boeing.com/commercial/orders/displaystandardreport.cfm?cboCurrentModel=787&optReportType=AllModels&cboAllModel=787&ViewReportF=View+Report

  397. Trimble, Stephen (June 18, 2013). "PARIS: Boeing launches 787-10 with five customers". Flight International. Retrieved June 29, 2013. http://www.flightglobal.com/news/articles/paris-boeing-launches-787-10-with-five-customers-387321/

  398. Metcalf, Eddy (June 19, 2013). "Boeing To Launch 787-10 Dreamliner The Most Efficient Jetliner In History". Aviation Online Magazine. Archived from the original on August 9, 2013. Retrieved July 6, 2013. https://web.archive.org/web/20130809140043/http://avstop.com/june_2013/boeing_to_launch_787_10_dreamliner_the_most_efficient_jetliner_in_history.htm

  399. "Air Lease's Hazy Says Boeing 787-10 Beats Airbus on Fuel". Bloomberg. June 18, 2013. https://www.bloomberg.com/news/articles/2013-06-18/air-lease-s-hazy-says-boeing-787-10-beats-airbus-on-fuel

  400. "Boeing 787 Dreamliner (Technical Specs)". Boeing. February 2022. https://www.boeing.com/commercial/787/

  401. "Boeing Completes Detailed Design for the 787-10 Dreamliner" (Press release). Boeing. December 2, 2015. http://boeing.mediaroom.com/2015-12-02-Boeing-Completes-Detailed-Design-for-the-787-10-Dreamliner

  402. "Boeing 787-10 Dreamliner Begins Major Assembly" (Press release). Boeing. March 15, 2016. http://boeing.mediaroom.com/2016-03-15-Boeing-787-10-Dreamliner-Begins-Major-Assembly

  403. Guy Norris (December 19, 2016). "Simplicity Is Vital To Boeing 787-10 Execution". Aviation Week & Space Technology. http://aviationweek.com/commercial-aviation/simplicity-vital-boeing-787-10-execution

  404. David Wren (November 30, 2016). "Boeing's first 787-10 Dreamliner moves into final assembly". Charleston Post and Courier. http://www.postandcourier.com/business/boeing-s-first---dreamliner-moves-into-final-assembly/article_783a3a74-b70e-11e6-a5c8-4be7d9a0bb2d.html

  405. "Civil Aviation Programs To Watch". Aviation Week & Space Technology. June 9, 2017. http://aviationweek.com/paris-air-show-2017/civil-aviation-programs-watch#slide-4-field_images-1639711

  406. "Boeing Debuts 787-10 Dreamliner" (Press release). Boeing. February 17, 2017. http://boeing.mediaroom.com/news-releases-statements?item=129854

  407. Trimble, Stephen (March 31, 2017). "Boeing achieves first flight of Charleston-built 787-10". FlightGlobal. https://www.flightglobal.com/news/articles/boeing-achieves-first-flight-of-charleston-built-787-435771/

  408. "Civil Aviation Programs To Watch". Aviation Week & Space Technology. June 9, 2017. http://aviationweek.com/paris-air-show-2017/civil-aviation-programs-watch#slide-4-field_images-1639711

  409. Max Kingsley-Jones (June 18, 2017). "Boeing completes a third of 787-10 testing". Flightglobal. https://www.flightglobal.com/news/articles/paris-boeing-completes-a-third-of-787-10-testing-438330/

  410. Trimble, Stephen (October 3, 2017). "Boeing rolls out first 787-10 built for customer". Flightglobal. https://www.flightglobal.com/news/articles/picture-boeing-rolls-out-first-787-10-built-for-cus-441773/

  411. Guy Norris (November 22, 2017). "Boeing Targets 787-10 Test Completion In December". Aviation Week & Space Technology. http://aviationweek.com/new-civil-aircraft/boeing-targets-787-10-test-completion-december

  412. David Kaminski Morrow (November 12, 2017). "Emirates set to push 787-10 backlog over 200". Flightglobal. https://www.flightglobal.com/news/articles/dubai-emirates-set-to-push-787-10-backlog-over-200-443163/

  413. Wall, Robert; Parasie, Nicolas (November 12, 2017). "Emirates Airline Orders 40 Boeing 787 Dreamliners". The Wall Street Journal. New York City, New York, United States. Retrieved November 13, 2017. https://www.wsj.com/articles/emirates-airline-orders-40-boeing-787-dreamliners-1510482526

  414. Jens Flottau (November 14, 2017). "Emirates Dismisses A380plus Concept As Negotiations Continue". Aviation Week. http://aviationweek.com/commercial-aviation/emirates-dismisses-a380plus-concept-negotiations-continue

  415. David Kaminski Morrow (November 14, 2017). "Emirates' faith in 787-10 closes window to A350". Flightglobal. https://www.flightglobal.com/news/articles/dubai-emirates-faith-in-787-10-closes-window-to-a3-443270/

  416. Scott Hamilton (February 4, 2019). "787-10 engines too small for Emirates". Leeham News. https://leehamnews.com/2019/02/04/pontifications-787-10-engines-too-small-for-emirates/

  417. Kaminski-Morrow, David (November 20, 2019). "DUBAI: Emirates to take 30 787-9s and trims 777X deal". Flightglobal.com. Retrieved November 27, 2019. https://www.flightglobal.com/news/articles/dubai-emirates-to-take-30-787-9s-and-trims-777x-dea-462424/

  418. Trimble, Stephen (January 22, 2018). "FAA approves 787-10 for airworthiness". Flightglobal. https://www.flightglobal.com/news/articles/faa-approves-787-10-for-airworthiness-445088/

  419. "Boeing receives 787-10 production certificate". Flightglobal. February 16, 2018. https://www.flightglobal.com/news/articles/boeing-receives-787-10-production-certificate-445969/

  420. "Boeing Delivers World's First 787-10 Dreamliner to Singapore Airlines" (Press release). Boeing. March 25, 2018. http://boeing.mediaroom.com/2018-03-25-Boeing-Delivers-Worlds-First-787-10-Dreamliner-to-Singapore-Airlines,1

  421. Firdaus Hashim (February 8, 2018). "SIA 787-10 will make May debut to Osaka". Flightglobal. https://www.flightglobal.com/news/articles/picture-sia-787-10-will-make-may-debut-to-osaka-445713/

  422. "Singapore Airlines takes delivery of its first Boeing 787-10". Australian Aviation. June 3, 2018. Retrieved June 17, 2018. https://australianaviation.com.au/2018/06/singapore-airlines-takes-its-first-boeing-787-10/

  423. Trimble, Stephen (March 28, 2018). "Boeing 787-10 technical description and cutaway". Flightglobal. https://www.flightglobal.com/news/articles/analysis-boeing-787-10-technical-description-and-cu-446856/

  424. Trimble, Stephen (March 28, 2018). "Boeing 787-10 technical description and cutaway". Flightglobal. https://www.flightglobal.com/news/articles/analysis-boeing-787-10-technical-description-and-cu-446856/

  425. Jon Ostrower (May 30, 2019). "Boeing chases range frontier on 787 and 777X to win Air New Zealand, Qantas deals". The air current. https://theaircurrent.com/aircraft-development/boeing-chases-range-frontier-on-787-and-777x-to-win-air-new-zealand-qantas-deals/

  426. "Boeing Business Jets". Boeing. June 2018. https://www.boeing.com/commercial/bbj

  427. "Backgrounder: The Boeing ecoDemonstrator Program (June 2022)" (PDF). Boeing. Retrieved November 21, 2022. https://www.boeing.com/resources/boeingdotcom/principles/environment/pdf/BKG-ecoDemonstrator_2022.pdf

  428. "Boeing ecoDemonstrator 787 Tests Innovations for More Efficient Air Travel" (Press release). Boeing. November 17, 2014. Retrieved January 6, 2024. https://boeing.mediaroom.com/2014-11-17-Boeing-ecoDemonstrator-787-Tests-Innovations-for-More-Efficient-Air-Travel

  429. "Etihad ecoDemonstrator Programme". Etihad Aviation Group. Retrieved November 21, 2022. https://www.etihadaviationgroup.com/en-ae/sustainability/flying-towards-zero-emissions/ecodemonstrator

  430. Hemmerdinger, Jon (April 28, 2023). "Boeing adds 787-10 to 2023 ecoDemonstrator technology programme". FlightGlobal. DVV Media. Retrieved April 29, 2023. https://www.flightglobal.com/airframers/boeing-adds-787-10-to-2023-ecodemonstrator-technology-programme/153068.article

  431. Waldron, Greg (June 15, 2023). "ANSPs demonstrate trajectory-based operations in Asia-Pacific". FlightGlobal. DVV Media. Retrieved November 17, 2023. https://www.flightglobal.com/aerospace/ansps-demonstrate-trajectory-based-operations-in-asia-pacific/153710.article

  432. Boeing: Orders and Deliveries (updated monthly) (Report). Chicago: Boeing. April 30, 2025. Retrieved May 13, 2025. https://www.boeing.com/commercial/#/orders-deliveries

  433. Thisdell and Seymour Flight International July 30 – August 5, 2019, p. 42.

  434. Michael (August 26, 2011). "Boeing 787 Dreamliner – Date for First Delivery". Flight Story. Archived from the original on July 9, 2015. Retrieved August 26, 2011. https://web.archive.org/web/20150709054920/http://www.flightstory.net/20110826/boeing-787-dreamliner-date-for-first-delivery

  435. "Boeing Delivers the 787th 787 Dreamliner" (Press release). Boeing. December 13, 2018. https://boeing.mediaroom.com/2018-12-13-Boeing-Delivers-the-787th-787-Dreamliner

  436. Gary Eaton (April 3, 2020). "Maiden flight of the 1000th production Boeing 787 Dreamliner". https://www.instagram.com/p/B-iOk6UBeAQ/

  437. "Orders & Deliveries". The Boeing Company. May 31, 2025. Retrieved June 10, 2025. http://www.boeing.com/commercial/#/orders-deliveries

  438. "Boeing 787 Accident Statistics". Aviation Safety Network. Retrieved March 8, 2025. https://aviation-safety.net/database/types/Boeing-787/statistics

  439. "Boeing 787 occurrences". Aviation Safety Network. Retrieved March 8, 2025. http://aviation-safety.net/database/types/Boeing-787/database

  440. "Flight history for aircraft - VT-ANB". Flightradar 24. https://www.flightradar24.com/data/aircraft/vt-anb

  441. "At least one UK citizen survived Air India plane crash with 242 on board". Briefly.ng. Retrieved June 12, 2025. https://briefly.ng/at-least-one-uk-citizen-survived-air-india-plane-crash-with-242-on-board/

  442. "Fiery Air India crash kills 241 people aboard, leaving 1 survivor, airline says". AP News. Retrieved June 14, 2025. https://apnews.com/article/india-plane-crash-cad8dad5cd0e92795b03d357404af5f8

  443. "Air India Ahmedabad-London flight crashes near airport in Meghani nagar area". The Times of India. June 12, 2025. Retrieved June 12, 2025. https://timesofindia.indiatimes.com/city/ahmedabad/plane-crashes-in-ahmedabads-meghani-area/articleshow/121798487.cms

  444. "Two Boeing 787 incidents raise concerns about jet". Reuters. January 9, 2013. Archived from the original on March 7, 2016. Retrieved January 9, 2013. https://web.archive.org/web/20160307164625/http://uk.reuters.com/article/us-boeing-japan-airlines-idUKBRE9070T320130109

  445. "U.S. Opens Dreamliner Safety Probe". The Wall Street Journal. January 9, 2013. Retrieved January 9, 2013. https://www.wsj.com/articles/SB10001424127887323482504578229800636659218

  446. "U.S. to review Dreamliner amid two more mishaps in Japan". Chicago Tribune. January 11, 2013. Archived from the original on February 15, 2013. Retrieved January 11, 2013. https://archive.today/20130215171709/http://articles.chicagotribune.com/2013-01-11/business/chi-dreamliner-problems-cracked-window-oil-leak-amon-latest-787-woes-20130111_1_dreamliners-japanese-carrier-orders-review

  447. "Japan Airlines Reports New Fuel Leak in Boeing 787". Yahoo! News. Associated Press. January 14, 2013. Retrieved September 27, 2015. https://news.yahoo.com/japan-airlines-reports-fuel-leak-boeing-787-145953197--finance.html

  448. "JAL's grounded Dreamliner jet leaks fuel in tests". Reuters. January 13, 2013. Archived from the original on February 16, 2013. Retrieved January 13, 2013. https://www.reuters.com/article/us-boeing-dreamliner-test-idUSBRE90C09520130113

  449. Mukai, Anna (January 15, 2013). "Japan to Investigate Boeing 787 Fuel Leak as FAA Reviews". Bloomberg. Retrieved January 20, 2013. https://www.bloomberg.com/news/2013-01-15/japan-sets-up-team-to-probe-dreamliner-fuel-leak-as-faa-reviews.html

  450. Topham, Gwyn (January 11, 2013). "Boeing 787 Dreamliner to be investigated by US authorities". The Guardian. London. Retrieved January 11, 2013. https://www.theguardian.com/business/2013/jan/11/boeing-787-dreamliner-us-investigation

  451. "Heathrow shut after Boeing Dreamliner 787 fire". BBC News. July 12, 2013. Retrieved July 12, 2013. https://www.bbc.co.uk/news/uk-23294760

  452. "Ethiopian 787 In Heathrow Fire Incident". Aviation Week. July 12, 2013. Archived from the original on November 3, 2013. Retrieved July 12, 2013. https://web.archive.org/web/20131103110819/http://www.aviationweek.com/Article.aspx?id=/article-xml/awx_07_12_2013_p0-596731.xml

  453. Goad, Ben (July 13, 2013). "British investigators: No evidence Dreamliner fire related to batteries". The Hill. Retrieved July 13, 2013. https://thehill.com/regulation/other/156092-investigators-no-sign-boeing-dreamliner-fire-related-to-batteries/

  454. Martinez, Michael (July 12, 2013). "Fire, 'technical issue' on two Dreamliners raise new worries". CNN. Retrieved July 12, 2013. http://www.cnn.com/2013/07/12/world/europe/uk-heathrow-airplane-fire/

  455. "Batteries 'not linked' to 787 fire". BBC. July 13, 2013. Retrieved July 13, 2013. https://www.bbc.co.uk/news/uk-23302722

  456. "Heathrow fire on Boeing Dreamliner 'started in battery component'". Guardian newspaper, July 18, 2013. https://www.theguardian.com/world/2013/jul/18/heathrow-fire-boeing-dreamliner-battery

  457. "Special Bulletin S5/2013 – Boeing 787, ET-AOP" (PDF). Air Accidents Investigation Branch. July 18, 2013. Archived from the original (PDF) on August 4, 2013. Retrieved May 7, 2017. https://web.archive.org/web/20130804234614/http://www.aaib.gov.uk/cms_resources.cfm?file=%2FS5-2013%20ET-AOP.pdf

  458. "UK: 2013 Dreamliner fire caused by crossed wires". Associated Press. Archived from the original on March 5, 2016. https://web.archive.org/web/20160305145155/http://news.yahoo.com/uk-2013-dreamliner-fire-caused-crossed-wires-033215256.html

  459. "Qatar grounds a 787 as glitches pile up on Boeing jet". Reuters, July 27, 2013. https://web.archive.org/web/20160307034228/http://uk.reuters.com/article/uk-boeing-dreamliner-qatar-idUKBRE96P12C20130727

  460. Kiyotaka Matsuda & Robert Wall (August 14, 2013). "Boeing 787 Hit by Setback With Fire-Extinguisher Wiring Flaw". Bloomberg. Retrieved August 16, 2013. https://www.bloomberg.com/news/2013-08-14/ana-finds-wiring-defects-in-dreamliners-as-jal-plane-scraps-trip.html

  461. Ostrower, Jon (August 16, 2013). "Boeing Traces Improperly Assembled Engine-Fire Extinguishers to Supplier's Bottles". The Wall Street Journal. Retrieved August 16, 2013. https://www.wsj.com/articles/SB10001424127887324823804579015742142122488

  462. "Boeing warns of engine icing risk on 747-8s, Dreamliners". Yahoo! Finance (October 15, 2013). Retrieved March 13, 2014. https://finance.yahoo.com/news/boeing-ge-notify-airlines-engine-094401702.html

  463. Boeing 787 Dreamliners Disrupt Norwegian Air Shuttle's Operations Archived January 24, 2014, at the Wayback Machine. Businessweek (January 22, 2014). Retrieved March 13, 2014. http://www.businessweek.com/articles/2014-01-22/why-is-the-787-dreamliner-such-a-hassle-for-norwegian-air

  464. Bangkok to Oslo flight halted after fuel seen leaking from wing. UPI.com. Retrieved March 13, 2014. http://www.upi.com/Top_News/World-News/2014/01/21/Passengers-alert-planes-cabin-crew-to-fuel-leaking-from-wing/UPI-43731390321026/?spt=rln&or=1

  465. UPDATE 1-Fuel leak on Boeing 787 delays Norwegian Air flight Archived September 28, 2015, at the Wayback Machine. Reuters (January 21, 2014). Retrieved March 13, 2014. https://www.reuters.com/article/boeing787-norwegian-idUSL2N0KW02320140122

  466. Boeing 787 Dreamliners Disrupt Norwegian Air Shuttle's Operations Archived January 24, 2014, at the Wayback Machine. Businessweek (January 22, 2014). Retrieved March 13, 2014. http://www.businessweek.com/articles/2014-01-22/why-is-the-787-dreamliner-such-a-hassle-for-norwegian-air

  467. Koranyi, Balazs. (January 24, 2014) Boeing says Dreamliner reliability 'better, but not satisfactory' Archived September 28, 2015, at the Wayback Machine. Reuters. Retrieved March 13, 2014. https://www.reuters.com/article/us-boeing-dreamliner-idUSBREA0N0F320140124

  468. Treloar, Stephen. (January 24, 2014) 787 Dreamliner's reliability needs to improve further, Boeing exec says |Business & Technology. The Seattle Times. Retrieved March 13, 2014. http://seattletimes.com/html/businesstechnology/2022745412_boeingdreamlinerxml.html

  469. Trimble, Stephen (March 31, 2016). "Boeing, FAA warn 787 pilots of bad airspeed data". Flightglobal.com. https://www.flightglobal.com/news/articles/boeing-faa-warn-787-pilots-of-bad-airspeed-data-423735/

  470. Michael Kaszycki. "Federal Aviation Administration,Airworthiness Directives; The Boeing Company Airplanes" (PDF). rgl.faa.gov. Archived from the original (PDF) on January 31, 2017. Retrieved April 12, 2016. https://web.archive.org/web/20170131225521/http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgad.nsf/0/024d507c0b79612986257f88004e8ecd/$FILE/2016-07-10.pdf

  471. Lorenzetti, Laura. "FAA Says Boeing 787 Dreamliners Have 'Urgent Safety Issue'". Fortune. http://fortune.com/2016/04/25/boeing-dreamliner-safety-issue/

  472. "Federal Aviation Administration-14 CFR Part 39" (PDF). i2.cdn.turner.com. http://i2.cdn.turner.com/cnn/2016/images/04/23/2016-08-12.pdf

  473. Noëth, Bart (June 18, 2021). "British Airways Boeing 787-8 suffers nose gear collapse at London Heathrow". Aviation24.be. Retrieved June 18, 2021. https://www.aviation24.be/airlines/international-airlines-group-iag/british-airways/boeing-787-8-suffers-nose-gear-collapse-at-stand-583-london-heathrow/

  474. "AAIB Special Bulletin S1/2021 on Boeing 787-8, G-ZBJB". GOV.UK. https://www.gov.uk/aaib-reports/aaib-special-bulletin-s1-slash-2021-on-boeing-787-8-g-zbjb

  475. Fleming, Eleanor (June 18, 2021). "Aviation authority to investigate BA plane nose gear collapse". SurreyLive. Retrieved June 18, 2021. https://www.getsurrey.co.uk/news/surrey-news/aaib-investigate-british-airways-787-20851986

  476. Schlappig, Ben (June 18, 2021). "British Airways 787 "Collapses" At Heathrow". One Mile at a Time. Retrieved June 18, 2021. https://onemileatatime.com/news/british-airways-787-collapses/

  477. "Aircraft systems issue possible cause of LATAM incident – commentator". 1News. Retrieved March 12, 2024. https://www.1news.co.nz/2024/03/12/aircraft-systems-issue-possible-cause-of-latam-incident-commentator/

  478. "Accident: ANA B788 near Takamatsu on January 16, 2013, battery problem and burning smell on board". Aviation Herald. Retrieved February 8, 2013. http://avherald.com/h?article=45c377c5&opt=0

  479. "Japanese airlines ground Boeing 787s after emergency landing". Reuters. January 16, 2013. Archived from the original on November 15, 2015. Retrieved January 16, 2013. https://www.reuters.com/article/us-boeing-ana-idUSBRE90F01820130116

  480. McCurry, Justin (January 16, 2013). "787 emergency landing: Japan grounds entire Boeing Dreamliner fleet". The Guardian. London. Retrieved January 16, 2013. https://www.theguardian.com/business/2013/jan/16/787-emergency-landing-grounds-787

  481. Cooper, Chris; Matsuda, Kiyotaka (May 1, 2013). "Boeing Dreamliner Grounding Hurts ANA, Japan Airlines Sales". Bloomberg. Tokyo. Retrieved May 27, 2013. https://www.bloomberg.com/news/2013-04-30/boeing-dreamliner-grounding-to-hurt-ana-japan-airlines-sales.html

  482. "Press Release". Federal Aviation Administration. January 16, 2013. Retrieved January 17, 2013. http://www.faa.gov/news/press_releases/news_story.cfm?newsId=14233

  483. "Dreamliner: Boeing 787 planes grounded on safety fears". News. BBC. January 17, 2013. Retrieved January 17, 2013. https://www.bbc.co.uk/news/business-21054089

  484. "Airbus CEO 'Confident' Boeing Will Find Fix for 787" (video). Bloomberg. January 17, 2013. https://www.bloomberg.com/video/airbus-ceo-confident-boeing-will-find-fix-for-787-b1zkhgggTB6DE6nv47gJNQ.html

  485. Wall, Robert; Rothman, Andrea (January 17, 2013). "Airbus Says A350 Design Is 'Lower Risk' Than Troubled 787". Bloomberg. Retrieved January 17, 2013. 'I don't believe that anyone's going to switch from one airplane type to another because there's a maintenance issue,' Leahy said. 'Boeing will get this sorted out.' https://www.bloomberg.com/news/2013-01-17/airbus-says-a350-design-lower-risk-than-troubled-boeing-787.html

  486. "Boeing 787 Dreamliner design riskier than our plane: Airbus | The Star". The Toronto Star. January 17, 2013. https://www.thestar.com/business/2013/01/17/boeing_787_dreamliner_design_riskier_than_our_plane_airbus.html

  487. "'Big Cost' Seen for Boeing Dreamliner Grounding". Bloomberg. January 17, 2013. https://www.bloomberg.com/video/-big-cost-seen-for-boeing-dreamliner-grounding-GidF~fWxREqPxG4JCh3dKw.html

  488. White, Martha C (January 17, 2013). "Is the Dreamliner Becoming a Financial Nightmare for Boeing?". Time. https://business.time.com/2013/01/17/is-the-dreamliner-becoming-a-financial-nightmare-for-boeing/

  489. "Dreamliner: Boeing 787 planes grounded on safety fears". News. BBC. January 17, 2013. Retrieved January 17, 2013. https://www.bbc.co.uk/news/business-21054089

  490. "Thales selects GS Yuasa for Lithium ion battery system in Boeing's 787 Dreamliner" (PDF). GS Yuasa. Retrieved January 18, 2013. http://www.s399157097.onlinehome.us/PDFS/BoeingPR_06_12_2005.pdf

  491. Dudley, Brier (January 17, 2013). "Lithium-ion batteries pack a lot of energy — and challenges". The Seattle Times. Retrieved January 24, 2013. iron phosphate "has been known to sort of be safer." http://seattletimes.com/html/businesstechnology/2020149254_787batteryexplainerxml.html

  492. Dalløkken, Per Erlien (January 17, 2013). "Her er Dreamliner-problemet". Teknisk Ukeblad (in Norwegian). Archived from the original on January 16, 2016. Retrieved January 17, 2013. English translation https://web.archive.org/web/20160116142356/http://www.tu.no/industri/2013/01/17/her-er-dreamliner-problemet

  493. "Energy storage technologies – Lithium". Securaplane. Retrieved January 24, 2013. http://www.securaplane.com/products/energy-storage-technologies

  494. "Special Conditions: Boeing Model 787-8 Airplane; Lithium Ion Battery Installation" (PDF) (PDF). FAA / Federal Register. October 11, 2007. Retrieved January 30, 2013. NM375 Special Conditions No. 25–359–SC https://www.gpo.gov/fdsys/pkg/FR-2007-10-11/pdf/E7-19980.pdf

  495. Scott, Alwyn; Saito, Mari. "FAA approval of Boeing 787 battery under scrutiny". NBC News. Reuters. Retrieved January 24, 2013. https://www.nbcnews.com/business/faa-approval-boeing-787-battery-under-scrutiny-1C8087461

  496. Supko; Iverson (2011). "Li battery UN test report applicability" (PDF). nextgov.com. Retrieved January 23, 2013. http://cdn.nextgov.com/media/gbc/docs/pdfs_edit/012213bb1b.pdf

  497. Brewin, Bob (January 22, 2013). "A 2006 battery fire destroyed Boeing 787 supplier's facility". nextgov.com. Retrieved January 23, 2013. http://www.nextgov.com/emerging-tech/2013/01/2006-battery-fire-destroyed-boeing-787-suppliers-facility/60809/

  498. Nantel, Kelly (January 20, 2013). "NTSB Provides Third Investigative Update on Boeing 787 Battery Fire in Boston". NTSB. Retrieved January 21, 2013. https://www.ntsb.gov/news/2013/130120.html

  499. "Press Release". NTSB. January 26, 2013. Retrieved January 24, 2013. https://www.ntsb.gov/news/2013/130124.html

  500. Weld, Matthew; Mouwad, Jad (January 25, 2013). "Protracted Fire Inquiry Keeping 787 on Ground". The New York Times. Retrieved January 26, 2013. https://www.nytimes.com/2013/01/25/business/the-ntsb-sees-lengthy-inquiry-into-787-dreamliner.html

  501. Mitra-Thakur, Sofia (January 23, 2013). "Japan says 787 battery was not overcharged". Engineering & Technology. Archived from the original on January 25, 2013. Retrieved January 23, 2013. https://web.archive.org/web/20130125005653/http://eandt.theiet.org/news/2013/jan/japan-plane.cfm

  502. Drew, Christopher; Tabuchi, Hiroko; Mouawad, Jad (January 29, 2013). "Boeing 787 Battery Was a Concern Before Failure". The New York Times. Retrieved January 30, 2013. /wiki/Hiroko_Tabuchi

  503. Hradecky, Simon (February 5, 2013). "ANA B788 near Takamatsu on January 16, 2013, battery problem and burning smell on board". Aviation Herald. Retrieved February 6, 2013. http://avherald.com/h?article=45c377c5

  504. Drew, Christopher; Tabuchi, Hiroko; Mouawad, Jad (January 29, 2013). "Boeing 787 Battery Was a Concern Before Failure". The New York Times. Retrieved January 30, 2013. /wiki/Hiroko_Tabuchi

  505. Tabuchi, Hiroko (January 28, 2013). "No Quality Problems Found at Battery Maker for 787". The New York Times. Retrieved January 30, 2013. /wiki/Hiroko_Tabuchi

  506. Cooper, Chris; Matsuda, Kiyotaka (January 28, 2013). "GS Yuasa Shares Surge as Japan Ends Company Inspections". Bloomberg BusinessWeek. Archived from the original on August 23, 2014. Retrieved January 29, 2013. https://web.archive.org/web/20140823220152/http://www.businessweek.com/news/2013-01-27/gs-yuasa-shares-surge-as-japan-ends-probe-of-787-battery-maker

  507. Knudson, Peter (January 29, 2013). "NTSB issues sixth update on JAL Boeing 787 battery fire investigation". NTSB. Retrieved January 29, 2013. https://www.ntsb.gov/news/2013/130129b.html

  508. "Accident: ANA B788 near Takamatsu on January 16, 2013, battery problem and burning smell on board". Aviation Herald. Retrieved February 8, 2013. http://avherald.com/h?article=45c377c5&opt=0

  509. "FAA grounding all Boeing 787s". KIRO TV. Archived from the original on January 19, 2013. Retrieved January 16, 2013. https://web.archive.org/web/20130119022332/http://www.kirotv.com/news/news/faa-grounding-all-boeing-787s/nTyfB/

  510. "LAN suspende de forma temporal la operación de flota Boeing 787 Dreamliner". La Tercera. January 16, 2013. Archived from the original on January 17, 2013. Retrieved January 16, 2013. https://web.archive.org/web/20130117172340/http://www.latercera.com/noticia/negocios/2013/01/655-504140-9-lan-suspende-de-forma-temporal-la-operacion-de-flota-boeing-787-dreamliner.shtml

  511. "DGCA directs Air India to ground all six Boeing Dreamliners on safety concerns". The Economic Times. January 17, 2013. Retrieved January 17, 2013. http://economictimes.indiatimes.com/news/news-by-industry/transportation/airlines-/-aviation/dgca-directs-air-india-to-ground-all-six-boeing-dreamliners-on-safety-concerns/articleshow/18056887.cms

  512. "European safety agency to ground 787 in line with FAA". Reuters. January 16, 2013. Archived from the original on March 20, 2013. Retrieved January 17, 2013. https://www.reuters.com/article/boeing-787-easa-idUSL6N0AM0E020130117

  513. "Qatar Airways grounds Boeing Dreamliner fleet". Reuters. January 17, 2013. Archived from the original on March 20, 2013. Retrieved January 17, 2013. https://www.reuters.com/article/qatar-boeing-idUSL6N0AM64J20130117

  514. "U.S., others ground Boeing Dreamliner indefinitely". Reuters. January 16, 2013. Archived from the original on January 20, 2013. Retrieved January 17, 2013. https://www.reuters.com/article/us-boeing-dreamliner-idUSBRE90F1N820130117

  515. "U.S., others ground Boeing Dreamliner indefinitely". Reuters. January 16, 2013. Archived from the original on January 20, 2013. Retrieved January 17, 2013. https://www.reuters.com/article/us-boeing-dreamliner-idUSBRE90F1N820130117

  516. Boeing 787 Dreamliner: The impact of safety concerns. BBC News. January 17, 2013. Retrieved January 17, 2013. https://www.bbc.co.uk/news/business-21041265

  517. "Dreamliner crisis: Boeing halts 787 jet deliveries". BBC News. UK. January 1, 1970. Retrieved January 20, 2013. https://www.bbc.co.uk/news/business-21095056

  518. "FAA approves test flights for Boeing 787". The Seattle Times. February 7, 2013. Retrieved September 27, 2015. http://www.seattletimes.com/seattle-news/faa-approves-test-flights-for-boeing-787/

  519. Norris, Guy (February 7, 2013). "FAA Gives All Clear For 787 Test Flights". Aviation Week. Archived from the original on May 20, 2013. Retrieved February 9, 2013. https://web.archive.org/web/20130520162137/http://www.aviationweek.com/Article.aspx?id=/article-xml/awx_02_07_2013_p0-546746.xml

  520. "Boeing 787's battery woes put US approval under scrutiny". Business Standard. February 22, 2013. Retrieved February 22, 2013. http://www.business-standard.com/article/international/boeing-787-s-battery-woes-put-us-approval-under-scrutiny-113012300143_1.html

  521. "Auxiliary Power Unit Battery Fire Japan Airlines Boeing 787-8, JA829J". National Transportation Safety Board. Archived from the original on December 26, 2014. https://web.archive.org/web/20141226193538/https://www.ntsb.gov/investigations/AccidentReports/Pages/AIR1401.aspx

  522. "Interim factual report" (PDF). National Transportation Safety Board. March 7, 2013. https://www.ntsb.gov/investigations/AccidentReports/Reports/DCA13IA037-interim-factual-report.pdf

  523. "NTSB Report Details: Boeing 787 Battery Fire Was Difficult to Control". Time. March 7, 2013. Archived from the original on March 9, 2013. https://web.archive.org/web/20130309200816/http://business.time.com/2013/03/07/boeing-787-battery-fire-was-difficult-to-control/

  524. "Airlines Prepare to Relaunch Their Dreamliners: ANA, Qatar, United Schedule First Flights". Frequent Business Traveler. http://www.frequentbusinesstraveler.com/2013/04/airlines-prepare-to-relaunch-their-dreamliners-ana-qatar-united-schedule-first-flights/

  525. Drew, Christopher; Mouawad, Jad (April 20, 2013). "Boeing Fix for Battery Is Approved by FAA". The New York Times. https://www.nytimes.com/2013/04/20/business/faa-endorses-boeing-remedy-for-787-battery.html

  526. Yeo, Ghim-Lay (April 19, 2013). "FAA approves 787 battery changes". Flight International. Retrieved April 19, 2013. http://www.flightglobal.com/news/articles/faa-approves-787-battery-changes-384924/

  527. "Boeing 787 Dreamliner returns to service in Ethiopia flight". BBC News. April 27, 2013. https://www.bbc.co.uk/news/business-22315317

  528. Drew, Christopher; Mouawad, Jad (April 20, 2013). "Boeing Fix for Battery Is Approved by FAA". The New York Times. https://www.nytimes.com/2013/04/20/business/faa-endorses-boeing-remedy-for-787-battery.html

  529. Gates, Dominic. "Grounding order formally lifted for Boeing 787". The Seattle Times/The Columbian. Retrieved May 1, 2013. http://www.columbian.com/news/2013/apr/25/grounding-order-formally-lifted-boeing-787/

  530. "Japan OKs 787s to fly again". CNN. April 26, 2013. Retrieved April 26, 2013. http://www.cnn.com/2013/04/25/travel/japan-dreamliner-flights/

  531. "Boeing 787 Dreamliner returns to service in Ethiopia flight". BBC News. April 27, 2013. https://www.bbc.co.uk/news/business-22315317

  532. Gates, Dominic. "Grounding order formally lifted for Boeing 787". The Seattle Times/The Columbian. Retrieved May 1, 2013. http://www.columbian.com/news/2013/apr/25/grounding-order-formally-lifted-boeing-787/

  533. "Boeing 787 aircraft grounded after battery problem in Japan". BBC News. January 14, 2014. Retrieved January 16, 2014. https://www.bbc.co.uk/news/business-25737515

  534. "No damage to JAL 787 in battery incident". Flight International. January 15, 2013. Retrieved January 16, 2014. http://www.flightglobal.com/news/articles/no-damage-to-jal-787-in-battery-incident-394850/

  535. Thomson, Iain (January 16, 2014). "Boeing bent over for new probe as 787 batteries vent fluid, start to MELT". www.theregister.co.uk. https://www.theregister.co.uk/2014/01/16/us_safety_authorities_on_boeings_case_787_batteries_fail/

  536. Ostrower, John, "JAL reports malfunction in battery on Boeing 787", The Wall Street Journal, January 15, 2014, p. B1.

  537. Temperature in failed Dreamliner battery hit 660 Celsius. The Daily Telegraph. Retrieved March 13, 2014. https://www.telegraph.co.uk/finance/newsbysector/transport/10654333/Temperature-in-failed-Dreamliner-battery-hit-660-Celsius.html

  538. Knudson, Peter. "NTSB Recommends Process Improvements for Certifying Lithium-ion Batteries as it Concludes its Investigation of the 787 Boston Battery Fire Incident" NTSB, December 1, 2014. Retrieved December 2, 2014. https://www.ntsb.gov/news/2014/141201.html

  539. Hemmerdinger, Jon (December 1, 2014). "NTSB faults Boeing, FAA and contractors for 787 battery fire". Flightglobal. Archived from the original on December 2, 2014. Retrieved December 2, 2014. http://www.flightglobal.com/news/articles/ntsb-faults-boeing-faa-and-contractors-for-787-battery-406624/

  540. Hemmerdinger, Jon (December 1, 2014). "Temperature in 787 battery cells spikes in cold conditions: NTSB". Flightglobal. Archived from the original on December 2, 2014. Retrieved December 2, 2014. http://www.flightglobal.com/news/articles/temperature-in-787-battery-cells-spikes-in-cold-conditions-ntsb-406629/

  541. Hemmerdinger, Jon (December 1, 2014). "NTSB 787 battery report details quality concerns at GS Yuasa". Flightglobal. Archived from the original on December 2, 2014. Retrieved December 2, 2014. http://www.flightglobal.com/news/articles/ntsb-787-battery-report-details-quality-concerns-at-gs-406632/

  542. Hemmerdinger, Jon (December 2, 2014). "NTSB details issues with 787 flight and data recorder". Flightglobal. Archived from the original on December 2, 2014. Retrieved December 2, 2014. http://www.flightglobal.com/news/articles/ntsb-details-issues-with-787-flight-and-data-recorder-406665/

  543. Thierry Dubois (June 27, 2017). "Lithium-ion Batteries Prove Value On A350". Aviation Week & Space Technology. http://aviationweek.com/commercial-aviation/lithium-ion-batteries-prove-value-a350

  544. "Boeing donates the first 787-8 prototype (N787BA, ZA001) to Nagoya, Japan". World Airline News. June 22, 2015. Archived from the original on June 22, 2015. Retrieved January 7, 2016. https://web.archive.org/web/20150622200946/http://worldairlinenews.com/2015/06/22/boeing-donates-the-first-787-8-prototype-n787ba-za001-to-nagoya-japan/

  545. "DREAMLINER". Pima Air & Space Museum. Archived from the original on January 19, 2016. Retrieved January 7, 2016. https://web.archive.org/web/20160119075934/http://www.pimaair.org/aircraft-by-name/item/787-8-dreamliner

  546. "Boeing 787 Dreamliner". The Museum of Flight. Retrieved April 5, 2015. http://www.museumofflight.org/content/boeing-787-dreamliner

  547. "Museum Opens World's First Boeing 787 Dreamliner Exhibit Nov 8". The Museum of Flight. November 3, 2014. Retrieved November 8, 2014. http://www.museumofflight.org/content/museum-opens-worlds-first-boeing-787-dreamliner-exhibit-nov-8

  548. "787 Airplane Characteristics for Airport Planning" (PDF). Boeing Commercial Aircraft. February 2023. https://www.boeing.com/resources/boeingdotcom/commercial/airports/acaps/787.pdf

  549. "Type certificate data sheet for Boeing 787" (PDF). EASA. November 16, 2017. Archived from the original (PDF) on January 11, 2018. Retrieved January 10, 2018. https://web.archive.org/web/20180111052820/https://www.easa.europa.eu/system/files/dfu/TCDS%20EASA%20IM%20A%20115%20B787%20Iss%2019%20-%2016%20Nov%202017.pdf

  550. "Boeing 787 -8 (Dreamliner) sample analysis". Lissys Ltd. 2006. http://www.lissys.uk/samp1/

  551. "Type certificate data sheet for Boeing 787" (PDF). EASA. November 16, 2017. Archived from the original (PDF) on January 11, 2018. Retrieved January 10, 2018. https://web.archive.org/web/20180111052820/https://www.easa.europa.eu/system/files/dfu/TCDS%20EASA%20IM%20A%20115%20B787%20Iss%2019%20-%2016%20Nov%202017.pdf

  552. "787 Airplane Characteristics for Airport Planning" (PDF). Boeing Commercial Aircraft. February 2023. https://www.boeing.com/resources/boeingdotcom/commercial/airports/acaps/787.pdf

  553. "Everything about the Boeing 787 Dreamliner". Flightglobal. July 7, 2007. https://www.flightglobal.com/news/articles/everything-about-the-boeing-787-dreamliner-209212/

  554. "Type certificate data sheet for Boeing 787" (PDF). EASA. November 16, 2017. Archived from the original (PDF) on January 11, 2018. Retrieved January 10, 2018. https://web.archive.org/web/20180111052820/https://www.easa.europa.eu/system/files/dfu/TCDS%20EASA%20IM%20A%20115%20B787%20Iss%2019%20-%2016%20Nov%202017.pdf

  555. Typical seating

  556. "787 performance summary". Boeing. http://www.boeing.com/commercial/787/by-design/#/all-model-performance-summary

  557. At maximum takeoff weight, International Standard Atmosphere, sea-level, hi thrust.

  558. "Updated EASA Type certificate data sheet for Boeing 787" (PDF). EASA. October 28, 2019. Archived from the original (PDF) on December 31, 2019. Retrieved November 30, 2019. https://web.archive.org/web/20191231040400/https://www.easa.europa.eu/sites/default/files/dfu/TCDS%20EASA%20IM%20A%20115%20B787%20Iss%2024%20-%2028%20Oct%2019.pdf